3onestroo, Rosene, Anderlil< and Associates. Inc. is an hive Action Opportunit Emplo
and Emplo Owned
Principals: Otto G. Bonestroo, PE. ■ Marvin L. Sorvala, P.E. ■ Glenn R. Cook, RE - Robert G. Schunicht, P.E. ■
Jerr A. Bourdon, PE.
Senior Consultants: Robert W. Rosene, RE, ■ Joseph C. Anderlik, RE. ■ Richard E. Turner, RE. ■ Susan M. Eberlin, C.PA.
Associate Principals: Keith A. Gordon, P.E. ■ Robert R. Pfefferle, P.E. ■ Richard W. Foster, RE. ■ David 0. Loskota, PE. ■
Mark A. Hanson, PE. ■ Michael T Rautmann, RE, - Ted K. Field, RE- ■ Kenneth P Anderson, PE. ■ Mark R. Rolfs, PE. ■
David A. Bonestroo, M.B.A. ■ Sidne P. Williamson, FE., L.S. ■ A M. Rin M.B.A. ■ Allan Rick Schmidt, RE. ■
Thomas W Peterson, P.E. ■ James R. Maland, RE. ■ Miles B. Jensen, PE. ■ L. Phillip Gravel III, PE. - Daniel J. Ed P.E. ■
Ismael Martinez, PE. ■ Thomas A. S PE. ■ Sheldon J. Johnson ■ Dale A. Grove, RE- ■ Thomas A. Roushar, FE_ ■
Robert J. Dever PE.
Offices: St- Paul, St- Cloud, Rochester and Willmar, MN ■ Milwaukee, Wl - Chica IL
Website: www.bonestroo.com
Ms. Kris Danielson
Communit Development Director
Cit of Oak Park Hei
14168 Oak Park Blvd., P. G. Box 2007
OaK' Park Hei MN 550822-2007
Re: Stillwater Ford — Conversion Van Center
Revised Gradin & Utilit Plan Review
Bonestroo File No. 55-02-000
Dear Kris:
p �c��od�
DEC 4 2 002
We have reviewed the revised g radin g and utilit plan for the proposed Stillwater Ford —
Conversion Van Center as submitted b METRO Land Surve & En As y ou are
aware, the owner previousl submitted improvements for this site for an Emplo and Stora
Parkin Lot Addition. As a result of the proposed development revisions, revised g radin g and
utilit plans were submitted to our office on November 26, 2002, and we have the followin
comments/recommendations:
1. The previous g radin g plan ( under the emplo parkin lot scenario routed storm water
runoff to the southwest and northeast comers of the parkin lot, then utilized curb cuts to
allow the storm water to enter overland draina ditches/swales. The current revised g radin g
plan ( under the conversion van center scenario), proposes to route storm water runoff to the
southeast and northeast comers of the parking lot. . Addit'onallv the revised grading p a l lan
calls for fillin in the ditch alon Neal Avenue North and installin storm sewer alon the
entire fronta of the site.
2. The g radin g plan we received contains hand-written revisions showin three curb cuts in the
parkin lot curb & g utter to allow storm water to enter draina swales/depressions, the
elimination of proposed catch basins and storm sewer exitin the parkin lot, and revisions
related to proposed storm sewer structures for the storm sewer in the filled ditch. These
hand-written revisions need to be incorporated into the drawin and the proposed contours
revised accordin (the current contours do not correspond to the hand-written revisions).
3. Ade riprap and/or other ade erosion control measures should be placed at the three
proposed curb cut locations.
4. A storm sewer profile is re for the proposed storm sewer necessitated b fillin in the
existin ditch. A draina area map and calculations are re to verif that the proposed
size and slope of the pipe are ade for the storm water flows in that area. Elevations for
the proposed beehive catch basin manholes need to be specified as well.
2335 West Hi 36 w St. Paul, MN 55113 n 651-636-4600 x Fax: 651-636-1311
5. Another hand-written note calls for a 20" pipe connectin the existin catch basin in Neal
Avenue North to the proposed storm sewer in the ditch. 20" is an uncommon size for storm
sewer, and this should be called out as a 12" or 15" Reinforced Concrete Pipe.
6. Accordin to an email from Ja Johnson, MnDOT has confirmed that the have issued a
permit to Denn Hecker for a Van Conversion Center on Neal Avenue North. Additionall
Ja email indicates that Brown's Creek Watershed District has reviewed the revised
g radin g plan, and will not re a new permit for the revisions ( if the hand-written
modifications are incorporated into the g radin g plan). We recommend the applicant submit
the final revised g radin g plan ( incorporatin g the hand-written revisions) and the Cit receive
written verification from BCWD indicatin their acceptance of the final revised plan.
7. The 4" PVC sanitar sewer service shall be Schedule 40 pipe.
8. The 2" copper water service shall be connected to the existin mainline via a wet tap.
If y ou have an q uestions or re additional information, please contact me at ( 651 ) 604-4815.
Sincerel
BONESTROO, ROSE E, ANDERLIK & ASSOCIATES INC
C
'
Dennis M. Pofser, P.E.
cc: Jud Holst, Actin Cit Administrator
Ja Johnson, Public Works Director
Jim Butler, Buildin Official
Scott Richards — Cit Planner ( Northwest Associated Consultants, Inc.)
Mark Vierlin — Cit Attorne ( Eckber g , Lammers, Bri Wolff & Vierlin P.L.L.P.)
DMP, DDH, File — Bonestroo
KA55101d1Sfillwater Ford - Van Conv Ctr ( Emp Pk re view— 12-2-02. doe