Loading...
HomeMy WebLinkAbout1999-04-12 Ray Kennedy Ltr to OPHMOMEMBESEMINISERNAERif 51'&1 Mait4WEENENESEMMERWAVIMAVil Kennedy Builders® Fixture Contractors Nationwide Fixture Installatioi i and Store Reinodelin, City of Oak Park Heights 14168 No 57 Street Oak Park Ht., MN 55082 April 12,1999 To: Planing Department From: Ray Kennedy Re: Lot 7 Block 2 Kern 2 Addition We submitted plans for a new building at a staff meeting last week. Our lot contains 2.87 acres (12,017 SF). was questioned about what plans 1 have for the remaining land. I stated that eventually we would build another building there. Scott Richards stated we would be able to work something out at that time. It is my opinion that we shouki address this_ issue now. 1 would request an approval for both buildings and sites at this time. The final decision to build on this site will be based on the ability to build two buildings to defray the land and improvement costs. The approval from the city could simply be a letter stating that based upon present codes and ordinances the site use meets therequirements of the city. See attached drawing: Lot 7 Block 2 Kern 2 Add. 2.87 Acres 125,017 SF Phase 1 (Front site) Lot size 160' X 300' 48-,00-0 SF Building; 120' X 180' 20,400 SF Open Space_27,600 SF Parking 17,980 Green 9,620 Phase 2 Back site Lot Size 160' X 482' 77,017 SF Building 28,000 SF Open Space 49,017 SF Parking 18,000 Green 31,017 Corporate Headquarters: 5649 Memorial Avenue North 0 Stillwater, MN 55082 Phone: 612/439-0419 Fax: 612/439-1133 Mailing Address: 1200 Nightingale Boulevard • Stillwater, MN 55082 0 - "LW ' - 71Wah7(AfaMi - I1 Q LA z 3 194 a