Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2009-05-21 BRAA Comments
Julie Hultman From: Post ler, Dennis M [Dennis.Postler@bonestroo.com] Sent: Thursday, May 21, 2009 12:51 PM To: Scott Richards Cc: Eric Johnson; Tom Ozzello; Julie Hultman; Jimmy Butler; Judy Hoist; Mark Vier ling; Kathy VVidin; Erickson, Karen S; Long, Chris W Subject: McDonald's -- Preliminary review comments Scott: In preparation for next weeks site plan review meeting with the applicant, please note our following preliminary review comments which we discussed in brief yesterday: 1. The drive-thru lane widths have been revised to 9' wide for the drive-thru lane and 18' wide for the drive aisle. These widths should allow for acceptable turning/parking movements. 2. The sanitary sewer and water services are being completely replaced. Notes 13 and 14 on Sheet C1.2 indicate that these services are to be removed back to the main lines (on the north side of the Hwy. 36 south frontage road), however that sanitary sewer service location is not known. Since they will be crossing the frontage road to replace these services, it would be prudent to have them both located prior to removal (MnDOT will probably require that). 3. They will need a "Minnesota Department of Transportation Application for Installation of Utilities or Miscellaneous Work on Trunk Highway Right of Way" for the sanitary sewer and water service work and for the frontage road reconstruction patch. (They should coordinate with MnDOT's plans/timing to Mill & Overlay the frontage road in August/Sept of this year.) 4. The water main connection note in plan view on Sheet C4.1 indicates wet tapping the existing 6" water main. The existing water main is an 8" CIP in this location. Also, the sanitary sewer connection note indicates connecting to the existing "x" sanitary sewer. The existing sanitary sewer is an 18" RCP in this location. 5. Recommend silt fence extend outside of the proposed grading limits (northeast area of frontage road ditch) and also along the entire north side of the site --- adjacent to the south side of the frontage road. It's difficult to tell from the drawings (Sheet C3.1) if this is shown in that area. 6. They will also need a MSC-WMO permit and a NPDES permit. Dennis M. Post ler, PE Principal Tel 651-604-4815 Cell 651-775-5102 dennis.postler©bonestroo.com This e-mail is confidential and may contain legally privileged information. I Note: e-mails are susceptible to corruption, interception and unauthorized ame 4 4 2335 Highway 36 W St. Paul, MN 55113 Tel 651-636-4600 Fax 651-636-1311 www.bonestroo.com EFFECTIVE APRIL 27, NORTHERN ENVIRONMENTAL AND BONESTROO MERGED, offering comprehensive services in engineering, planning, and environmental science. 5/21/2009 Page 1 of 2