Loading...
HomeMy WebLinkAbout2005-08-19 BRAA Weely Project UpdateJulie Hultman From: Kelley, Brian [bhe|lev@boneotroo.00mi Sent: Friday, August 19, 2005 12:53 PM To: Judy Holst; JuIie Hultman; Tom Ozzeflo; Eric A. Johnson Cc: Postier, Dennis M; Erickmon, Karen S Subject: Weekly project update for 8-19-05 Nothing much to report this week Fox Hollow TV testing af sanitary sewer should be done next week. Infratech will be callirig me to schedue this. That will be all of the sanitary sewer testing other than visual inspections when the structures are adjusted to final grade. McKean Square �^ infratech is nearly done cleaning the storm sewer lines — there are a few lines with larger rocks that need special equipment. They will be back to finish on Tuesday. After the cleaning is done, the storm sewer lines below the street will be inspected with a closed circuit TV camera to determine exterit of cracked pipe. � After the extent of the cracked pipe is determined, the pipes will be removed/replaced and the street will be restored. Have a great weekend! 8/19/2005 Brian M. Kelley Construction Supervisor BonmstroV,Roseme,And:rlik. Associates Office: (715) 381-8340 Mobile: (651) 324-5586 Page 1 of 1