Brian _M. Kelley
Construction Supervisor
Bonestroo, Rosene, Anderlik, & Associates
Office: (715) 381-8340
Mobile: (651) 324-5586
9/16/2005
Page 1 of 1
Here is the update for this week.
Fox Hollow
>. Nothing new to report. Punch list will be created after parking lot storm sewer installation is completed.
McKean Square
Storm sewer has been cleaned and televised. Problem areas have been identified. I am working with Infratech
to have them install their Masterliner cured-in-place pipeline repair. This will eliminate the need to dig up the
finished streets while providing a sound product. I've attached a link to their website which shows how they do
this.
http://www.infratechcatalog.comicipp_spotiateral repairs,htm