Loading...
HomeMy WebLinkAbout2005-10-07 BRAA Weely Project UpdateJulie Hultman 10/7/2005 From: Kelley, Brian [bkel nemtroo.00n] Sent: Friday, October O7.2OO51:35PM To: Eric A. Johnson; Tom Ozzello; Judy Holst; JuIie Hultrnan Cc: Postier, Dennis M; Erickson, Karen S; Popenhagen, Adam Subject: Weekly project update Good afternoon, Here are the updates for this week. Fox Hollow 1 met on site with Jeff Hause (owner) and Mike Raleigh (prime contractor) 0 We looked at several concerns that 1 have with erosion on the project • Jeff and Mike said they would move the sand stockpile that is on the west side of the pond and restore the pond slopes. Work will be completed within the next week. = Jeff and Mike also both realize that much of the storm sewer pipe will need to be flushed out and the pond will have to be dug out with an excavator to remove all of the silt that has filled the bottom 0 We discussed repairing the 8" sanitary sewer service cut-in that was poorly done • Mike is working with Infratech to schedule the repairs at the expense of 3 Rivers Construction (utility subcontractor) McKean Square �= Continuing to coordinate storm sewer pipe repairs with |nfnabeoh through change order to Burschville Construction. Feel free to call if you have questions/concerns. Have a great weekend! Thanks, Brian M. Kelley Construction Supervisor Bonestroo, Rosene, Anderlik, & Associates Office: (715) 381-8340 Mobile: (651) 324-5586 Page 1 of 1