HomeMy WebLinkAbout2005-10-13 BRAA Weely Project UpdateJulie Hultman
From: Kelley, Brian [bkelley@bonestroo.com]
Sent: Thursday, October 13, 2005 3:33 PM
To: Tom Ozzello; Eric A. Johnson
Cc: Judy Hoist; Julie Hultman; Post ler, Dennis M; Erickson, Karen S; Long, Chris W
Subject: Weekly Project Update
Here is an update on the projects for this week:
McKean Square
• Infratech will be on site next week to work on the cured-in-place storm sewer repairs.
Let me know if you have questions/concerns. I'll be off tomorrow and back on Monday. Have a great weekend!
Brian M. Kelley
Construction Supervisor
Bonestroo, Rosene, Ander lik, & Associates
Office: (715) 381-8340
Mobile: (651) 324-5586
10/13/2005
Page 1 of 1
Fox Hollow
• All public sanitary sewer and water main testing has been successfully completed. There are still a few storm sewer
structures to raise to grade when the parking lot construction occurs. They will be inspected at that time.
Kern Ponds
Park Construction began pumping the pond out today to get it below the required level needed to protect the
plantings.
• Chris Long has been in touch with Park Construction, and is coordinating the repairs of the washed out pond inlet on
the south end of the site.