HomeMy WebLinkAbout2003-02-13 BRAA Ltr to OPH Re General Plan Review1 111 Bonestroo
Rosene
•
Ander lik
VI Associates
Engineers & Architects
February 13, 2003
Ms. Judy Hoist
Acting City Administrator
City of Oak Park Heights
14168 Oak Park Blvd., P. O. Box 2007
Oak Park Heights, MN 55082-2007
Re: McKean Square
General Plan Review
BRA File No. 55-03-000
Dear Judy:
3onestroo, Rosene, Ander lik and Associates, Inc. is an
and Employee Owned
Principals: Otto G. Bonestroo, RE. • Marvin L. Sorvala, P.E • Glenn R. Cook, P.E. • Robert G. Schunicht, P.E. •
Jerry A. Bourdon, PE.
Senior Consultants: Robert W. Rosene, P.E. • Joseph C. Ander lik, P.E. • Richard E. Turner, PE. • Susan M. Eberfin,
Associate Principals: Keith A. Gordon, PE. • Robert R Pfeffer le, PE. • Richard W. Foster, PE. • David 0. Loskota, PE. •
Mark A. Hanson, PE. • Michael T. Rautmann, PE. • Ted K. Field, PE. • Kenneth P. Anderson, PE. • Mark R. Ro Ifs, PE.
David A. Bonestroo, M.B.A. • Sidney P Williamson, PE., L.S. • Agnes M. Ring. M.B.A. • Allan Rick Schmidt, PE. •
Thomas W. Peterson, PE. • James R. Ma land, PE. • Miles B. Jensen, P.E. • L. Phillip Gravel III, PE. • Daniel J. Edgerton, PE. •
Ismael Martinez, P.E. • Thomas A. Syfko, PE. • Sheldon J. Johnson • Dale A. Grove, P.E. • Thomas A Roushar,
Robert J. Devery, PE.
Offices: St. Paul, St. Cloud, Rochester and Willmar, Mf\•
N.Vebsite: www.bonestroo.com — 0, rr?
FEB
f 1
ative Action/Equal Opportunity Employer
We have reviewed the general development plans and drainage report for the proposed McKean
Square development (Boutwell's Landing — Phase 2) as submitted by Folz, Freeman, Erickson,
Inc. and have the following comments and/or recommendations for your consideration:
Preliminary Plat:
1. Use a minimum of 25' for the drainage and utility easements encompassing storm sewers
connecting/outletting storm water ponds (20' is currently shown).
2. Storm sewers serving internal parking lots and the rock waterfall features will be privately
owned and maintained. As such, drainage and utility easement are not required for these
items (see attached sketch will recommended revisions).
3. All stormwater ponds and wetlands need accessibility for maintenance. If the proposed
drainage and utility easement locations are not also usable for access locations, separate or
expanded easements will be required.
4. [The Nolan Avenue North cul de sac right-of-way is missing the northwest portion of the
circle, from Boutwell's Landing — Phase 1. This should be dedicated as part of this plat.]
Site Liayput/Access Locations:
5• The planning report indicates that parking will be allowed on one side of the 28' wide streets.
We recommend that parking be allowed on the side of the streets where sidewalks are being
proposed, with the other side signed for no parking anytime. In addition, no parking should
be allowed on either side of the streets near intersections or driveways to any of the
buildings/units larger than duplexes.
2335 West Highway 36 • St. Paul, MN 55113 • 651-636-4600 • Fax: 651-636-1311
6. We had preliminary discussions at one time regarding providing another roadway access to
the property to the west (presumably in the area of Units 56/57 or 58). This would provide a
second access to this property along its southerly boundary. Does the City wish to pursue
this issue, or assume a second access would come from another direction? (If it were to
come from this development, a minimum of one unit would be lost.)
7. The proposed street right-of-way on the east side of the development coincides with the east
property line (which is also the City boundary). Some grading for boulevard construction
and fill /cut slopes will be required outside of the roadway right -of -way. As such, temporary
construction easements will be required from the adjacent township property owner.
8. We agree with the planning report that the median island in Nolan Parkway in the southwest
corner of the site be removed. To maintain a 120' centerline radius, the outside curb line and
right -of -way should be adjusted, and the plat revised accordingly. This may result in Units
49 -- 53 needing realigning /rotating to make the driveways work better.
9. We also agree with the planning report that a sidewalk connection is needed in the northeast
corner of the site to Norwich Parkway. We recommend it be continued along the west side
of Nolan Parkway to Norwich Parkway with an access ramp constructed at the intersection.
Accordingly, a pedestrian ramp should be constructed on the north side of Norwich Parkway
at the corresponding location.
Grading /Drainage:
10. Storm water runoff from the majority of this development will be tributary to eight different
internal ponds /wetlands (four proposed storm water ponds & four existing wetlands). A
detailed drainage report was included as part of the general plan submittal. We are currently
reviewing these calculations and will have more detailed review comments in the near future.
Some general comments on the report and grading plan include the following:
• We require that structures adjacent to ponds maintain a 3.0 -foot separation between
the 100 -year HWL and the structure's lowest opening, and that the Emergency Over
Flow (EOF) route be a minimum of 1.0 foot below the lowest opening. The second
paragraph of Section 3.5 of the drainage report should be revised to reflect this.
• Show the locations and elevations of all pond EOF's on the grading plan. (The
locations of some of the pond EOF's are shown on the Preliminary Utility Plan).
• Pond 1
•
o The EOF is noted to be at an elevation of 935.5 (presumably to the east on
adjacent property). The lowest adjacent townhome opening is 936.0. This
separation needs to be a minimum of 1.0 foot, especially since this is a land-
locked pond. The natural EOF could be graded to 935.0 or lower, fairly
easily, with permission from the adjacent property owner.
o The 100 -year HWL will back up into Pond 4, basically making these two
ponds function as one in large storm events. If the 100 -year HWL increases
above 932.0, it will also back up into Pond 2.
• Pond 3:
o The EOF is noted to be at an elevation of 945.8, and the lowest adjacent
townhonie opening is 946.0 (Units 14 & 15). Maintain a 1.0 -foot minimum.
difference.
• Pond 4:
o The retaining wall on the south side of Nolan Parkway North adjacent to the
pathway is up to 20 feet in height. We assume some type of protective
handrail will be installed on top of this wall (as well as the three other wing
walls for the bridge /culvert).
• Pond 7:
o The 100 -year HWL of 939.9 is approximately only 10 feet from the backdoors
of the proposed townhomes along Nolan Avenue North (McKean West). As
such, the proposed EOF at elevation 941.0 to the south needs to be clearly
defined, and the street curb & gutter and boulevard kept below this elevation.
O Pond S:
This pond is currently shown as a landlocked wetland. The post - development
tributary drainage area is smaller than the pre - development, however now the
back half of developed lots will be draining to this wetland. Although the
100 -year back -to -back modeled water levels are sufficiently below any
adjacent structures, it may be prudent to install an outlet to this wetland (as
part of the McKean West project). This would help ensure that the existing
wetland water levels do not remain at elevated levels after storm events or
more permanently. Elevations of the existing storm sewer in Nolan Avenue
North would allow for this scenario.
11. The design and construction of the proposed retaining walls adjacent to storm water ponds or
internal trails are the responsibility of the developer's engineer. We will require detailed
design drawings and calculations for these walls.
12. Storm sewer sizing/calculations have not been submitted for this general plan review and will
either be reviewed when submitted or prepared by Bonestroo & Associates during the final
design of the project.
Sanitary Sewer:
13. Existing sanitary sewer in Norwich Parkway and Nolan Ave. N. (provided with Boutwell's
Landing — Phase 1) is of sufficient depth to serve this entire development by gravity flow.
Duplex Unit 39/40 has the lowest basement elevations and will be the critical elevation to
meet. As such, the proposed sanitary sewer will need to stay at minimum grade from
Norwich Parkway, creating depths up to 27' deep.
14. The developer has indicated a desire to save as many existing trees as possible along the west
side of Nolan Parkway by the 46-Unit Brownstone Flats building. Sanitary sewer will be up
to 24' deep in the street at this location. Normal open trench construction would result in a
trench and stockpiling area of over 100' in width. To save the desired trees, subcutting,
shoring and backhauling methods of excavated material will need to be utilized during
construction, resulting in more expensive construction for this segment of sanitary sewer.
15. The 12 -Unit Brownstone Flats building and the 5 -piex townhome unit in the southeast corner
of the site should have their own (6" or 8 ") sanitary sewer services.
16. As shown, the top of the sanitary sewer will be only 1. ' below the bottom of Pond 4 under the
concrete arch bridge /culvert. This section of sanitary sewer will need to be encased, and/or
the pond bottom raised as much as possible.
Water Main:
17. The water main layout, in general, is acceptable. The alignment of the 12" trunk water main
in the western portion of the site where it will connect to McKean West (and the existing 8"
line in Nolan Avenue North) may be revised dependent upon the minimum fire flow
pressures required by the fire department.
Miscellaneous:
18. A detailed sediment and erosion control plan needs to be included as part of the general plan
submittal, as it pertains to the grading and private storm sewer construction activities. We
will be preparing one as part of the street and utility improvement plans.
Since Bonestroo & Associates will be preparing the final plans and specifications for this project
when authorized to do so, specific comments relative to street and utilities layouts will be
addressed at that time. Any items affecting grading or other site improvements being
constructed by the developer will be coordinated with the developer's engineer. If you have any
questions or require additional information, please contact me at (651) 604-4815.
Sincerely,
BONESTROO, ROSENE, ANDERLIK & ASSOCIATES INC
Dennis M. Postler, P.E.
Enclosure
cc: Jay Johnson, Public Works Director
Jim Butler, Building Official
Scott Richards, City Planner
Mark Vierling, City Attorney
Kathy Widin, City Arborist
Todd A. Erickson — Folz, Freeman, Erickson, Inc.
DMP, DDH, File — Bonestroo & Associates
K:\55\01d\IVIeKean Square - General Plan Review_2-13-03.doe
I rkk
A
1
t3*
i 'i++ # fi r►
D ii i
4 \ \ .a
le
. �.
i
,) 1� ° ;
t VS`Y . ,.ti... . 'A \ \,..j .e. / 1 Ilr
:: 4 .4e - 17 ki ,..* is ,ii-
v it
8
IA ,
OUTLor c
A
1
L' A \/T 1AfN i
L r ■ i '`J vv iV
saw
j
south L • kic�TEAN f!IEST
+6.5C1 0,3
7
A
L r � �
7
7
/
',
1`;',",,:
' ►
v LJlJLi
•
-'1 • 4 r
t
i
1325. 85 22 Ar
N89 '37"
J`r \ Are.. •
4
1 as
\►--
d \ d \\ fi r+ /.Cs C3 t o''cr
1 ‘ , / ' ,..
d, \ j • ; (4 ' V / dr\ ( 4'Z'
<1'
''''‘..? :96 4' *V ith 74 66 0 „ . „__ .....Vp 7"
M SQUi
M A 1 ! K
}.39.201
TLO T B
P r
t ,-4 '"?-1 )47 e se
1 ., OUTLOT 8 A , if i '"
� i,w e l'
.� : 5,� ¶8.11 "E i T X0,
J f:�p�'.a S
t4 „AG
sue �►
0 ' I► �5!' AM w: 61�Vi J J � i •
L 37
- _ of ,36.19- :.. -R+,A
7 OL 4�i ■ $ !1'T13]' t l �f 77 6
1-0 es
1 V. ��• •
* 0i► '' .�
?I
�i I 89171.781rE
{� �1r JJ' , ' jrs�; ` ' `►jr �, ti� r wed'
^
J �Y
r 42 a 2 w ( ��T�
g14 Vsts.
a �arri it+ I i, 1 '�1Y 1�• 401rp� r'''
o Alf � ff
�„ c}.,, - + te a„ �.. 1 �� ! l� �' "' • L��� •rs 'V. t
,66'S 1 �j � ~" ' r � ! � ",� M y 1 , i , �E5$1 �� ' � T �� ��T �• 1+�� � I 7 � � S
i1 h r'I 1 ?3 -_� ,f
f i ti
.,„
l `� "P '�` � 0 43 tt7•'' a i HEST
�y r 1 f +�
,gip "J �� � n `� / 1DCt.7l f. • ��¢ � !s 1 e
i ti# ✓ \, b Y �
.1
J4 - - - - -- 1/ X21 �'~ T ■/
) _ CY d
Sd14 .52` •
2
�� - l .1 �
co g
4 51V.- 0`16 -" ) .,4 ,-41°
2 g
00.37'3. 6 w - 5b 1
4
'37"s
� S86 �,� �°
n /
i
D 17 rL� ■. 525 c7 s w
r '`f NT3 J rEv A� 79 99,71_ _ _
f 411"35
: f ., V 5 '
� � `p i ,ls� NA2'ad'14'E +``'' N54,0,44 -E ' ti /
i r �nv. v.._ -- p.c 6 , ,,>
I
1
i
N 1 -- `
m
N cZa