Loading...
HomeMy WebLinkAbout2002-04-04 NAC MemorandumKTHWEST ASSOCIATED .: 5775 Wayzata Boulevard, Suite 555, St. Louis Park., MN i 55416 Telephone: 952.595.9636 Facsimile: 962.595.9837 planners@nacplanning.com TO: Kimberly Kamper FROM: Scott Richards [SATE: April 4, 2002 RE: oak Park Heights — Boutwells Landing: McKean Square West Planned Unit (Development concept Plan Review FILE NO: 798.02 02.05 Based upon the April 1, 2002 joint City council, Planning Commission and Parks Commission meeting related to the Boutwells Landing project and other Oakgreen Avenue projects, the following issue points should be discussed by the Planning Commission at their April meeting. Additionally, most of these issues were reviewed in the March 7, 2002 planning report. 1. Mclean Square East. The City council discussed the possible Joint Powers Agreement with Baytown Township for the area identified as McKean Square East at their April 23, 2002 meeting. If no agreement on a Joint Powers Agreement or an orderly Annexation Agreement can be reached with the Township, VSSA will revise the McKean Square West concept plan to include the independent living facility. other changes to the McKean Square west plan would be required on the east side related to proposed parking lots and the roadway system. 2. Streets. Representatives of VSSA have indicated that Nolan Avenue would be constructed to the same standards as the existing portion of that roadway. A 55 foot right -of -way and 34 foot street width will be the standard for the street. Norwich Circle, the private roadway in the first phase of development, was constructed with an easement of 50 feet and a 34 foot roadway. The three private streets proposed in McKean Square west would need to be constructed at the minimum public or private street standards. The public versus private street issue should be discussed by the Planning Commission. It is likely that a change from a private to public street designation would have little effect on the current layout of the proposed buildings. I setbacks. Previous concept plan approvals for Boutwells Landing specify a Zo foot separation between buildings. The current plan specifies a 10 to 15 foot separation of units. Requiring a 20 foot separation could significantly change the current building layout and type of units proposed. The applicant may use more side -by -side units instead of the single family cottage units. 4. Roadway Access to west. The Planning commission should comment on the proposed one access point to the school District property to the west. The question is whether this one access point is adequate for future development or if it should be eliminated. 6. Architectural Appearance. Although building design is a general plan of development item for review, the Planning commission could comment on the design of the units proposed. 6. school and church. The Planning commission should comment on the placement of the school and church structures and any issues related to access and parking. PC: Kris Danielson I,