HomeMy WebLinkAbout2007-05-09 Applicant Ltr to BRRA/4 401#02 1 - 1 3i
INVESTMENTS, Inc
area on the portion of the site where drainage exits will remain as is. There
will be mulch added under the playground equipment for safety
requirements, The mulch is a recycled tire material and will not break
down in a way that a cedar or cypress might, in turn not causing water to
back up or pool.
think the best time to check grades in the center courtyard area would be
when the second building is completed. The grading was done in such a
way that during the time prior to construction of the second building, we
wouldn't have standing water or run-off issues.
Oak Park Hei hts, MN 55082
JON WHITCOMB
55082
IPhone:651-430-0016z
!Fax:651-430-0029/
/
ennis Postler
Bonestroo & Associates
Dear Mr. Ppstler,
S
\
It has come to my attention that a qiiestion was 'raised regarding drainage
and grades for our child care center,on Meihdrjal Avenue.
Just to clarify, we have not altered the grades, nor do we intend to. The
275 S.3rd St. 1
/Suite 302
/Stillwater, MN
May 9, 2007
cio City of Oak Park Heights
14168 Oak Park Heights Blvd
PO Box 2007
5 ernorial Aven
C.U.P. Comments
Sincerely,
4‘.4r.°4111.
Jon Whitcomb
JW:arb
Cc: Eric Johnson, City Administrator
A
would be happy to address those issues further if you feel it necessary.