Loading...
HomeMy WebLinkAbout2007-05-09 Applicant Ltr to BRRA/4 401#02 1 - 1 3i INVESTMENTS, Inc area on the portion of the site where drainage exits will remain as is. There will be mulch added under the playground equipment for safety requirements, The mulch is a recycled tire material and will not break down in a way that a cedar or cypress might, in turn not causing water to back up or pool. think the best time to check grades in the center courtyard area would be when the second building is completed. The grading was done in such a way that during the time prior to construction of the second building, we wouldn't have standing water or run-off issues. Oak Park Hei hts, MN 55082 JON WHITCOMB 55082 IPhone:651-430-0016z !Fax:651-430-0029/ / ennis Postler Bonestroo & Associates Dear Mr. Ppstler, S \ It has come to my attention that a qiiestion was 'raised regarding drainage and grades for our child care center,on Meihdrjal Avenue. Just to clarify, we have not altered the grades, nor do we intend to. The 275 S.3rd St. 1 /Suite 302 /Stillwater, MN May 9, 2007 cio City of Oak Park Heights 14168 Oak Park Heights Blvd PO Box 2007 5 ernorial Aven C.U.P. Comments Sincerely, 4‘.4r.°4111. Jon Whitcomb JW:arb Cc: Eric Johnson, City Administrator A would be happy to address those issues further if you feel it necessary.