HomeMy WebLinkAbout1978-07-02 OPH Ltr to City Consultants Jvly 2 1978
Kr. Otto Hanestroo Kr. L yle erg Mr. Dave Licht
2335 k. Trunk Highway 36 126 S. Second St. 416 & Hennepin Avenue
st. Paul, Minnesota 5=3 Stillwater, Minnesota 5,82 Mitnteapolis, Minnesota 55414
Gentleaen:
The following requests were made of certain staff groups at the Public Hearing
held Jme 29, 1978. To assure that you are all ewer* of those requests and their
time demands, I have taken the liberty to sum manse the ob jectives and assign
reaponsibiliti".
(Attorney, fir, PI&Mer)
I. mvirawoental screening south of the St, Croix Ma21.
1. Mr. Eckberg wd.11 arrange a meeting with the Plumar and Engineer.
2. Ob jective - Provide to the Cecil an the following natters.
A. Design - to Lwlvds - mwfaoe water, type of scree4 location of screen -
elevation, *to.
8. Cost allccati owwti.
Co Construatiop a a;oadbWLity.
D. rwtty" maim l ymn e e respomsd bd].iti.es*
No Lia d 21 tye
F. D JF faar spew'iftt+ations and inecpections of sonatruction.
• other?
Completion Date - Ideal July loth.
•aeeptable July 24th. Dsnd7.w August $th.
t�)s'wasy)
II. Dmt*nd.ae funding of y 3 wnti.lities tar hrekke Heights Second Addition and
Monio Johnson Estates.
U Mr. Zckberg will m rraW a Oche ng with Kr. Swinger and rYalvo.
Deadlier July ?#h.
Rift meat be awarded July 10th.
(1�.aeer)
M. Va1.ley View Park Iapr"e.s�cts.
1. MOSUOW was directed to propose pLwi and sp•aifteations fbr the fb1lowinge
• •
A, Street sarfaaing froa Osgood Avenue to first parking lot and the
erou>sea#Yag street to second parking area..
S, grading and surfacing of Herat and second padding lot.
C. Water and sanitary server to proposed park hdlding•
D, Provide reoommendatione and cost estimate to conv4W smrtwo water
from upper to lower park arcs►.
S. Complete plates and spw&fieeatime for park building. ('ibis my be bid
at later dote.)
Deadline - All above projects (except item, E.) should be scheduled to be oompletev
construction during 1978.
(Attornsy► )
IV, Cheap of use lots ?-8-9. block 5. Yeister's 3rd Addition (Osgood Avenue)
(Sngizeeir)
A, Applicant ,does not wish to connect to sanitary sower on Onman. Avenue.
Be fftIs that the existing co-witt system is adequate.
(Attorney Planner)
B, Provide the necessary information and vehicle for "Transitional Use"
which is not defined in our awTont soad gg ordinance. Procedure is needed
to aLIow the d+sntal clinic in a SFU district.
Deadline July 10th meeting.
(Attorney ltiA er)
V, Somlit Park SvbdiVision
( aid
A. Submit report an quality of u►tUitdes servining Summit Park area.
B. Forward your recommendations an course of action the City should take
TnsKnt�w 1
r 0VMIiAg OWDUehip future maintenance easament8 etc* of those utilities.
0. Prepare necessary legal doameents necessary to implement engineer's
recommendation.
D, Submit the homeowner' a agreement dot is leg+aI4 aooepta;ble to the City.
Deadline July loth seet'itt;.
U, 5ady0 34M - Reseed
A. sbsvard surrent ssesary of the variance I required to appacw* above project
it, Submit a fe3. Plannerls oyLYA.een of the acceptability of proposed project.
C, Forward the owdutm expansion (if any) the Planner oould rbcommamd and accept
with the related variances,
(Attorasy)
D. ward atimmeny of legal eeomcerns and opinions ons regarding above project.
S. Provide the moximm t degree of variations you fool legally acceptable and proper
0
for this City Owdwil, to apprwro„
SSI04LOO Ju4 6th — 6x OD P.M.
I r"OSTA a that a=* of the deadlines ars sit, h newer, you er law lespreseatative
was prose t at the bmarl 9 Admittedly, ti's dst&U bwOm mquested was not specifically
regmated by the Coqail. Sopefully, rm will a me that the dsteil requested is
7 to aawwo that the best poesi.ble dsaiaim will reswlt at 'tire surliest date.
VW7 tt%17 Tom•
8aa Heuer, Clark— Treaawm
City of Ouk Park Heigtts
SHsbh