Loading...
HomeMy WebLinkAbout2000-03-16 NAC Memorandum Re Proposal For Design Concepts I NORTHWEST ASSOCIATED CONSULTANTS INC COMMUNITY PLANNING - DESIGN - MARKET RESEARCH ` 1V MEMORANDUM TO: Tom Melena FROM: Scott Richards DATE: March 16, 2000 RE: Oak Park Heights - Proposal for Design Concepts FILE NO: 802 BACKGROUND AND ISSUES As per your request, I have assembled a proposal to provide the City with conceptual design plans to improve the appearance and functioning of the St. Croix Mall area. With the potential for additional investment in the Mall structure and parking areas, the City would like to insure that any of the issues that are important to the City are incorporated into an overall conceptual plan. The conceptual plan should take into account the following issues: 1. Potential for a change of use for portions of the Mall. The office use within the Mall could be expanded by concentrating the retail on the east end of the structure near Herbergers. 2. MnDOT's plans for a redesigned intersection at Osgood Avenue and Highway 36. 3. The City desires increased pedestrian access through the site and within the Mall parking lots. An east -west trail corridor through the southerly Mall area has been identified by the City. In addition, pedestrian access needs to be designed into the parking lot layout to insure safety, provide connections to the City trail and park system, to neighborhoods and other to commercial areas. 5775 WAYZATA BOULEVARD, SUITE 555 ST. LOUIS PARK, MINNESOTA 554 1 6 PHONE 61 2- 595 -9636 FAX 61 2- 595 -9837 E -MAIL NAC@ WINTERNET.COM 4. The parking lot layout should be redesigned to create a more functional plan that also increases the amount of landscaping and pedestrian access. The change of use to office in portions of the Mall would also reduce the parking demand based upon parking requirements for office versus shopping centers. 5. Lighting and signage should be reviewed to address conformance with the Ordinance and previous PUD approvals. Identification of the mail through better signage has been a long term issue. 6. Recent renovations to the K Mart for Anderson Corp. have shown how the building could be updated to reflect on updated design and conformity with the Design Guidelines. WORK PROGRAM Based upon the issues identified above: 1. Analyze the potential options for reuse of the Mall. Review the impacts of a change of use to include access, parking and signage. 2. Analyze the impact of MnDOT's plans for the Osgood Avenue /Highway 36 intersection to the St. Croix Mall area. 3. Develop at least two concepts for a revised parking layout. Provide generalized landscape plans for each concept. 4. Develop plans for pedestrian and trail access through and within the site based upon the parking layouts. 5. The lighting and signage should be analyzed for conformity and suggestions for signage improvements would be provided. 6. Propose general improvements to the Mall structure to enhance the appearance of the structure and compliance with Design Guidelines. STAFFING We propose that the three person design team be headed by Scott Richards, who would be responsible for project coordination, meeting attendance and assistance in the technical aspects of the project. Anne Deuring, who assisted with the Oak Park Heights 2 Design Guidelines, is a registered landscape architect with extensive site design and landscape experience. Cynthia Putz -Yang is a planner with a landscape design background who was the primary staff person responsible for the Oak Park Heights 1999 Comprehensive Park and Trail Plan update. PROCESS AND MEETINGS The project would be completed in a two month timeline. We would propose an organizational meeting with City staff members and Mall owners and at least one meeting each with the Planning Commission, Parks Commission and City Council. At least one additional meeting with City staff and owners to review and discuss project designs would also be included. BUDGET We would propose this project be completed for a not to exceed fee of $4,800.00 to include concept design generation and all staff meetings. Planning, Parks and City Council meetings would be billed separately under the existing contract, recognizing that NAC would likely be attending most of these meetings for other projects. The project budget by staff distribution is as follows: Senior Staff (Scott and Anne) 45 hrs. @ $80.00 = $3,600.00 Support Staff (Cynthia) 20 hrs. @ $50.00 = 1,000.00 $4,600.00 Secretarial and Expenses 200.00 TOTAL $4,800.00 pc: Kris Danielson 3