Loading...
HomeMy WebLinkAboutBP 2010-00253 New Commercial - Aldi Foods CITY OF OAK PARK HEIGHTS PERMIT NO.: 2010 -00253 14168 OAK PARK BLVD. N. #2007 OAK PARK HEIGHTS, MN 55082 -2007 DATE ISSUED: 10/29/2010 (651) 351 -1661 FAX: (651) 439 -0574 ADDRESS : 13747 60TH ST N PIN : 05- 029 -20 -11 -0042 LEGAL DESC : N/A : LOT 0 BLOCK 0 PERMIT TYPE : BUILDING PROPERTY TYPE : COMMERCIAL CONSTRUCTION TYPE : NEW CONSTRUCTION VALUATION : $ 1,397,024.00 NOTE: PERMIT ISSUED FOR CONSTRUCTION OF ALDI FOODS. WORK SHALL BE PER APPROVED PLANS, COMPLY WITH ALL MN STATE BUILDING CODE REQUIREMENTS, ALL CITY ZONING ORDINANCES & DEVELOPMENT /SITE SPECIFIC AGREEMENTS. PRE PERMIT TO FINAL PERMIT VALUATION PLAN REVIEW FEE DIFFERENCE CHARGED ON THIS PERMIT. 1 -1/2" PMM WATER METER & REMOTE READER INCLUDED. SEPARATE PERMITS REQD FOR MECHANICAL, FIRE PROTECTION. PLUMBING, SIGNAGE & OUTDOOR IRRIGATION SYSTEMS. (PD FOR BY ALDI #312035) SAC UNITS 4 WATER METER FEE 0 APPLICANT BUILDING PERMIT BASE FEE 7,061.45 PLAN REVIEW 1,253.00 DEERFIELD CONSTRUCTION CO. INC. STATE SURCHARGE - BUILDING 658.81 8960 GLENDALE- MILFORD RD LOVELAND, OH 45140- METRO SAC 8,400.00 (513) 984 -4096 WATER FUND 210.00 SEWER FUND 350.00 WATER METER 487.11 TOTAL 18,420.37 OWNER PAID WITH CHECK # 312035 CSM EQUITIES LLC 500 WASHINGTON AVE #3000 MINNEAPOLIS, MN 55415 - AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to: (1) the conditions of this permit; (2) the approval plans and specifications; (3) the applicable city approvals, Ordinances, and Codes; and, (4) the State Building Code. This permit is for only the work described, and does not grant permission for additional or related work which requires separate permits. This permit will expire and become null and void if work is not started within 180 days, or if work is suspended or abandoned for a period of 180 days any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with the Minnesota State Building Code. SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE. CONSTRUCTION TESTING INSPECTIONS ALDI TEST OR INSPECTION PERFORMED BY FREQUENCY SANITARY SEWER CONSTRUCTION 1. Lamping Inspector/ City rep As lines are installed, before street construction, final inspection. If groundwater infiltration is noted 2. Infiltration Test Contractor/ Inspector during lamping. After underground Const. is 3. Air test Contractor/ Inspector complete. 30 days after mains /services 4. Mandrel test (PVC pipe only) Contractor/ Inspector installed. Before street const. STORM SEWER CONSTRUCTION As lines are installed, before street 1. Lamping Inspector/ City rep construction, final inspection. If groundwater infiltration is noted 2. Infiltration Test Contractor/ Inspector during tamping. 3. Air and mandrel test Contractor/ Inspector Only if storm lines are constructed of PVC. WATER MAIN CONSTRUCTION 1. Wet Taps Inspector /City rep City must witness tap. After water mains and services are 2. Pressure test Contractor/ Inspector completed, note if each valve is open or closed. After water mains and services are 3. Conductivity test Contractor/ Inspector completed. As valves are installed; before wear 4. Lamping & Keying of valves Inspector/ City rep course paving, record if valves are open or closed. 5. Operation of hydrants - check Inspector/ City rep Before allowing occupancy. for proper break -off sections Private hydrant maint. is the End of project 6. Flushing P j responsibility of the owner Inspector/ Contractor/Testing Before allowing connection to 7. Chlorine /bacteria tests Consultant the system!!!!!!! Please contact Andy Kegley, Public Works Director to schedule inspections Office: 651.439.4439 Cell: 651.775.5759 akegley(acityofoa kparkheights.com 1 of 2