Loading...
HomeMy WebLinkAbout2003-05-15 BRRA Ltr to OPHJA Bonestroo Rosene Anderlilc & Associates En & Architects Ma 15, 2003 Bonestroo, Rosene, Anderlik and Associates, Inc. is a native Action Opportunit Emplo and Emplo Owned Principals: Otto G. Bonestroo, PE. ■ Marvin L. Sorvala, PE. ■ Glenn R. Cook, RE. ■ Robert G. Schunicht, PE. ■ Jerr A. Bourdon, PE. ■ Mark A. Hanson, RE. Senior Consultants: Robert W Rosene, RE. ■ Joseph C. Anderlik, P.E. ■ Richard E. Turner, PE. ■ Susan M. Eberlin, C.PA_ Associate Principals: Keith A. Gordon, P.E. ■ Robert R. Pfefferle, RE. Richard W Foster, PE. ■ David 0. Loskota, RE. ■ Michael T Rautmann, RE- ■ Ted K. Field, P.E. ■ Kenneth P Anderson, P.E. ■ Mark R. Roll's, RE- ■ David A. Bonestroo, M.B.A. ■ Sidne P Williamson, PE., L.S. ■ A M. Rin M.B.A. ■ Allan Rick Schmidt, RE. ■ Thomas W. Peterson, P.E. ■ James R. Maland, RE. ■ Miles B. Jensen, RE. L. Phillip Gravel III, RE. ■ Daniel J. Ed P.E. ■ Ismael Martinez, P.E. ■ Thomas A. S RE. ■ Sheldon J. Johnson ■ Dale A. Grove, PE. ■ Thomas A. Roushar, RE. -1 Robert J. Dever PE_ Offices: St- Paul, St. Cloud, Rochester and Willmar, IVIN ■ Milwaukee, W1 - Chica IL Website: www.bonestroo.com Mr. Eric Johnson, Cit Administrator Cit of Oak Park Hei 14168 Oak Park Blvd., P. 0. Box 2007 Oak Park Hei MN 55,082-2007 Re: Montanari Office Buildin Revised Concept Plan Review BRA File No. 55-03-000 Dear Eric: �r;, f3 - WILL S�CAe� n o �G zif of�IYY-e ,49 mhu 4-- A We have reviewed the revised site and buildin plans for the proposed Montanari Office Buildin development as submitted b Plowe En Inc. and have the followin comments/recommendations: Site La out /Access Locations: 1. The previousl approved site/landscapin plan prepared b the Architect, Cund Santine, & Associates should be revised to reflect the latest parkin g ara g e ramp revisions. 2. The applicant shall obtain a MnDOT access permit for the proposed drivewa revisions .."A within MnDOT ri -of wa if not alread done so. vo/ 3. One of the conditions of the 9125/02 conditional use permit & variance resolution included that "valle g utter be installed alon the east propert line adjacent to the Ea Club propert (instead of barrier curb & g utter) to accommodate storm water runoff from both proper-ties. This should be reflected in the revised drawin Gradin 4. The revised site plan raises the buildin elevation b 2'. The ori site plan resulted in a buildin basicall flush with the existin propert elevations to the west. The revised site plan results in the buildin bein 2' — 3' hi than the adjacent propert with an approximate 3:1 slope from the ed of the buildin to the propert line. 5. The under parkin g ara g e ramp proposed a 12% slope. Generall drivewa are 01- re to maintain 10% maximum slopes. However, parkin g ara g e ramps sometimes sli exceed these maximums, and the g rade is acceptable as proposed. 6. The proposed southerl parkin lot catch basin has a rim elevation of 931.20. If this catch basin would ever plu proposed contours indicate the first overflow route would be into the parkin g ara g e ramp. Grades should be revised to allow potential overflow over the parkin lot to the north. 2335 West Hi 36 St. Paul, MN 55113 651-636-4600,f Fax: 651-636-1311 7. The plans should indicate where the proposed parkin g ara g e ramp trench drain will be pumped to, and how. 8. The flared end outlet to the existin both Street N. ditch should specif a minimum of 8 cubic y ards of rip rap (plans call for 7 tons which is approximatel 3112 CY). 9. The applicant shall obtain a MnDOT stormwater dischar permit, if not alread done so. 10. Draina calculations were previousl submitted and approved. Storm water runoff from the proposed site is the same as from the existin site (actuall sli less impervious area after development). Sanitar Sewer and Water Main: 11. New 6" PVC sanitar sewer and 6" DIP water services are proposed to serve the buildin Our records indicate that existin 4" LISP sanitar sewer and I V2" Copper water services were installed to serve this site when the mainline utilities were installed alon both Street N., at approximatel the same location as the proposed new services. These existin services shall be properl removed and/or abandoned with the installation of the new services. Additionall we recommend (and Public Works prefers) that the new sewer connection be accomplished via a sewer w vs. the additional of another manhole as proposed. 12. The Public Works Department shall be notified 48 hours in advance of the proposed water service connection to the Cit existin mainline. 13. Verif existin h locations (need for an new h with the Fire Department. If y ou have an q uestions or re additional information, please contact me at (651) 604-4815. Sincerel BONESTROO, ROSENE, ANDERLIK & ASSOCIATES INC Dennis M. Postler, P.E. cc Scott Richards, Cit Planner (NAC, Inc.) Jud Holst, Finance Director Ja Johnson, Public Works Director Jim Butler, Buildin Official Mark Vierlin Cit Attorne Kath Widin, Cit Arborist DMP, File — Bonestroo K:155101d\Montanari Homes - Rev CDP Review5-14-03.doc