HomeMy WebLinkAbout2001-12-07 BRRA Email & Drainage CalculationsKris Danielson
From:
Sent:
To:
Cc:
Subject:
Pastier, Dennis M [dpostler@bonestroo.com]
Friday, December 07, 2001 10:54 AM
Kris Danielson (E-mail)
Scott Richards (E-mail); Kimberly Kamper (E-mail); Jay Johnson (E- mail) ; Jim Butler (E-mail);
Judy Hoist (E-mail); Mark Vierling (E-mail)
Montanari Office Building
The drainage calculations prepared by RFC Engineering, Inc. for Montanari's
Office Building are acceptable as submitted. Their calculations show that
under any sized storm event, the rate and volume of water leaving the site
after their development is basically the same as before their development
(due to the impervious surface area actually decreasing approximately 4300
sq ft.).
The flow will be more concentrated to the frontage road ditch via a curb cut
they are proposing in the driveway. This would be better served by a catch
basin and flared end section outlet with adequate rip rap.
Dennis M. Pastier
1
DEC MON 10:41 AM FROM FAX:24105 PAGE 1
Date: December 3, 2001
TO:
C C:
Call me.
Thomas
Name:
FAX No: 651-275-0678
Company: Montanari Homes, Inc.
Address: 13481 North 60th Street
Mark Gossman
RFC
Oak Park Heights, Minnesota 55082
Phone: 651-275-0690
FROM: Name: Thomas Halley
Project: Iviantanari Homes Office
Number of Pages Including This Page:
Instructions or messages to recipient:
Mark
Attached are the drainage calculations for the site,
Engineering, Inc.
Consulting Engineers
13635 Johnson Street
Ham Lake, MN 55304
763-862-8000 * Fax 763-862-8042
e RFCangrgiattglobalinet
I
DEC - 5 200!
SEC - 03 - 2001 MON 10.41 AM FROM
Data for MO TTA TARI HOMZs oFFIC$ S ILDING OAK PARK HEIGHTS Pace 1
TYPE II 24-HOUR IN `ALL . 2.50 IN
Prepared by RFC ENcINTERING, INC. 3 Dec 01
Hyde CAL, 1.1 . 001515 T 1i�d M .��'000 t� '
WAT2P S ROUTING
= °&= = =MOIM-- MMUIMMMINrMMaIMWOOQ
3UBCRYCHMENT REACH LI POND
S t3 OAT C H1ENT 1 ' EXISTING C OND I W I ONS
sU3cATOMENT 2 = PROPOSED CONDITIONS
FAX;24105' PAGE 2
LINK
DEC MON 1041 AM FROM
Data for MONTANARI HOMES MICE BUILDING OAK PARK RIGHTS
TYPE II 24-HOUR RAINFALTAm 2,50 IN
Prepared by RFC ENGINEERING, INC.
Eyjscl (p) 1986-1999 ApplEzzzap,..ult_y______r S stems
SUBCATCHMENU! 1 EXISTING CONDITIONS
PEAK= 2.46 CFS 11.87 HRS, VOLUME= .11 AF
ELM C
31156,00 98 IMPERVIOUS
oethod
TR-55 SHEET FLOW 1-1
Smooth surfaces n=.011 P2=2.7 in s=.025 '/'
SHALLOW CONCENTRATED/UPLAND FLOW 1-2
Paved Kv-20.282 L22O =.025 V=3.21 fps
PEAK= 2.44 CFS
26824.00 98 IMPERVIOUS
4332.00 8$ GRASS-ASSUMED D-POOR
31156.00 97
Method,
Comment
SUBCATCHMENT 2 PROPOSED CONDITIONS
FAX:24105F
Total Length= 320 ft
11.87 HRS, VOLUME= .11 A
Comment
TR-55 SEEET FLOW 2-1
Smooth surfaces n..011 L=100' P2=2.7 in a..015 '/
SHALLOW CONCENTRATED/uPLA4D FLOW 2-2
Paved Kv=20.3282 L=220' m=.015 'if V=2.49 fpm
Total Length. 320 ft
SCS T7-20 METHOD
TYPE II 24-HOUR
AINFALL= 2.50 IN
spAN= 10-20 HRS, dt=.1 HRS
PAGE 3
Page 2
3 Dec 01
.11.114.1111.ROM.111.0.711M1111
Tc (in),
1.2
1 . 1
Total Tc mg 2.3
SCS TR METHOD
TYPE 11 24-HOUR
RAINFALL= 2.50 IN
SPAN. 10-20 HRS, dt=.1 IR
1.5
1.5
.1 .....
Total T® 3.0
SEC - 03 - 2001 MON 10;41 AM FROM
Data for MO TANARI HO MSS OFFICE BUILDING OAK
TYPE =I 24 - HOt7R. RAINFALL. 3.70 IN
Vreparad by RFC ENGINEERING, INC.
H crc= 5.11 001515
WATERSHED ROUTING
MMMMWM -.. ,wUSIMMMMIB;
0 f RepcH
SUB: CATCHMENT 1 0 EXISTING CONDITIONS
SUBCATCI BNT 2 PROPOSED CONDITIONS
A P0,0
FAX
PARK HEIGHTS
Mi.crocc uter S stems
M MIEMMEMMMISMOO®®
LINK
PAGE 4
Page 1
3 Dec 01
DEC - 03 - 2001 MON 10.41 AM FROM
Data for MONTANARI HOMES OFFICE BUILDING OAK PARK HEIGHTS
TYPE II 24 -HOUR RAIN 'ALL= 3.70 IN
Prepared by RFC ENGINEERING, INC.
H droCAD 5.11 00151 A•. lied Microcom +uter S
SD CATCINT 1
PEAK. 3.67 CFS @ 11,87 HRS, VOLE.. 417 AF
31156,00 98 IMPERVIOUS
M hod
EXISTING CONDITIONS
Comment
TR -55 SHEET FLOW 1 -1
Smooth surfaces n. E 011 L-100' P2 m2 . 7 in s=.025
SHALLOW CONCENTRATED/ UPLAND FLOW 1-2
Paved Kv= 20.3282 L .'220 6..025 '/' V.3.21 fps
S LIB CAT CEMENT 2 PROPOSED CONDITIONS
PEAK. 3,6S CLS 0 11.87 HRS, VOLUME= .17 AF
......._..:°�, . CN
26824.00 98 IMPERVTOUs
4332.00 89 CRASS- ASSUMED D -POOR
31156.00 97
Method
FAX
TR - 5 5 SHEET FLOW 2-1
Smooth surfaces 7,1 . 011 L 100' P2=2.7
SHALLOW CONCENTRATED/UPLAND FLOW 2-2
Paved Kv.20.3282 L.220 s..015 1 / 1 V.12.49 fps
5 .2.015 '1
PAGE 5
Page 2
3 Dec 01
SCS TR-20 MEmCD
TYPE TI 24 -HOUR
RAINFALL= 3.70 IN
SPAN= 10-20 HRS, dt = . 1 HRS
Total Length= 320 ft Total Tc. 2 4 3
6C S TR ME' 'h OD
TYPE 1I 24 -HOUR
RAINFALL' .70 IN
SPAN= 10 - 20 HRS, dta .1 HRS
Total Length= 320 ft Total Tom 3.0
SEC - 03 - 2001 MON 10.41 AM FROM
SUBCATC ONT
StCATCEMENT 2
Data for MONTA.WARI HOMES OFFICE BUILDING OAK PARK HEIGHTS
WPM II 24-HOUR RAINFALL= 4.10 IN
Prepared by RFC ENGINEERING, INC.
H droCAD 5.1 r 1 85.1999 A.. 1ied Microoam -cater
wATERsHEO ROUTIN G - --
SIJBCATCHMENT Li REACH A POND
FAX:2g105f
L I N K
FxISTING CONDITIONS -->
PROPOSED CONDITIONS ->
PAGE 6
Page 1
3 DeC 01
DEC MON 10:41 AM FROV
Data for MoNTANARI HOMES OFFICE BuILDING OAK PAR HEIGHTS
TYPE 11 24 RAINFALLm 4.10 IN
Prepared by RFC ENCINIIERING, INC.
r A D 5 00151S 86-1999 A lied MI outer S :stems
susCATCHMENT 1
DEM. 4,08 CFS 11.87 HRS , VOLUME= .19 AY
31156.00 98 IMPERVIOUS
Method
EXISTING CONDITIONS
TR-55 SHEET FLOW 1-1
Smooth murfaces O11 L.100' 1 in
SHALLOW CONCENTRATED/VPLAND FLOW 1-2
Paved Kv=20.3282 L.220' s=.025 '/, V.3.21 fps
SUBCATCHMSNT 2 PROPOSED CONDITIONS
PEAK= 4.10 CFS @ 11.a7 IRS , VOLUMS .18 AF
26824.00 98 IMPERVIOUS
__1121.112u GRASS-ASSUMED n-pooR
31156.ao 97
Ccmmen
FAX:24105f
5.. ' /
PAGE 7
Page 2
3 Dec 01
Scs TR-20 mETTIon
TYPE II 24-ROUR
RAINFALL= 4.10 IN
SPAN= 10-20 FRS, dt..1 HRS
To min
1.2
1.1
W M AM
Total Length= 320 ft Total Tc. 2.3
$CS TR-20 METHOD
TYPE II 24-HOUR
RAINFALL. 4.10 IN
SPAN= 10-20 HRS, dt..1
kajazi_ Tc1MLUL
TR-55 SHEET FLOW 2-1 1.5
Smooth aurtaces n..011 L=I00' P2=2.7 th 015 '/'
SHALLOW CONCENTRATED/um:1Am mow 2-2 1.5
Paved Kv=20.3282 L=220' s=.015 '/' V.2.49 fps
Total Length= 320 ft Total Tc. 3.0
DEC - 03 - 2001 MON 10.42 AM FROM FAX;24105 PAGE 8
Data for MCNTANARZ DOMES OFFICE BUILDING OAR PARK HEIGHTS Page 1
TYPE 1I 24 -HOUR RAINFALL= 5.85 IN
Prepared by RFC ENGINEERING, INC. 3 Dec 01
Hydro AD SL 001515 c 1986 -1999 A• .::' - • u r. *uter S stems
WATERSHED ROUTING = = =mnmm..maQQ
SUBCATCHN$NT .
KII1: LJCTCHMNT � REACH
(1)
SUECATCENT 2 = PROPOSED CONDITIONS
/\ PONO
LINK
m EXISTING CONDITIONS ->
DEC MON 10:42 AM FROM
e
Data for MONTANARI HOMES OFFICE BUILDING OAK PARK HEIGHTS Pag 2
TYPE II 24-HOUR RAINFALL= 5.85 IN
Prepared by RFC ENG1NNERING, INC.
H CAD 5.11 0._ 15 c 19 • • A•iilied v rocomoute terns
SUBCATCHMENT 1
pEAK= 5,84 CFS @ 11.67 HRS, VOLUDO .27 AP
31156.00 98 IMPERVIOUS
Method Comm
TR-55 SHEET FLOW 1-1
Smooth murfacea n0.011 L=100 P2=2.7 in
SHALLOW coNCENTRATED/UPLAND FLOW 1-2
Paved Xv=20.282 L=220' sim,025 1 / 1 V=3.21 fps
SUBCATCHMIENT 2 PROPOSED CONDITIONS
PEAK= 5.89 CFS ID 11.87 HRS, VOLUME= .27 AF
26824,00 98 ImPERVIOUS
4332.00 e_a_ GRASS-ASSUMED D-POOR
97
31156.00
Metho
TR-55 SHEET FLOW
$mooth surfaces m,---.011 L.100'
SALLOW CONCENTRATED/uPLAgD PLOW
VXISTING CONDITIONS
FAX:24105r
s.02! '/'
PAGE 9
3 Dec 01
sCS TR-20 memoD
TYPE TI 24-Hon
RAINFALL= 5.85 IN
SPAN= 10-20 HRS, dtme.1 HRS
1.2
1.1
Total Length. 320 ft Total Tc= 2.3
SCs TR-2D METHOD
TYPE 11 24-HOUR
RAINFALL= 5.85 IN
SPAN= 10-20 HRS, dt=.1 HRS
1. ,
Comment
2-1
122=2,7 in s..025 I/
2-2
Paved 1(w-20,3282 Lm220 s..015 '/' Vm2.49 fps
Tc
i.s
1.5
Total Length= 320 ft Total Tc. 3.0