Loading...
HomeMy WebLinkAbout1989-11-07 Planner Memorandum to OPH Re DNR Boat Launch MEMORANDUM TO: LaVonne Wilson FROM: Curtis Gutoske Northwest DATE: 7 November 1939 Associated RE: Oak Park Heights - DNR 3oat Launch Consultants, inc. (612)925-9420 FILE NO: 793.02 4601 Excelsior Blvd. • Suite 410 • Minneapolis, MN 55416 Enclosed pleese find copies of the 6 November 1939 StarTribune pegarding the planned St. Croix River boat launch and a file memo documenting the conversation I had with Kathleen Wallace of the DNR. If you have any questions regarding this matter, please call. Encl6esaes WHITE - ORIGINAL YELLOW - FILE COPY PINK - C FILE • • N A Northwest Associated Consultants Inc. U R B A N P L A N N I N G • D E S I G N • M A R K E T R E S E A R C H MEMORANDUM C y TO: File FROM: Curtis Gutoske DATE: 7 November 1989 RE: Oak Park Heights - DNR Boat Launch FILE NO: 798.02 In a phone conversation this morning with Kathleen Wallace, Administrator of. the DNR Metro Region Office, Ms. Wallace indicated that the 6 November 1989 StarTribune article was premature. The DNR's agreement with NSP and the MWCC is only preliminary at t±zis time and no final arrangements have been made. In addition, with the boat launch not to be constructed until the Spring of 1991 (at the earliest), considerable time exists to finalize all of the plans or change them should revisions be necessary. Ms. Wallace also stated that the DNR would be designating a field • manager to carry out the project and work with the local communities to ensure the proposed ramp is acceptable by all affected parties. Ms. Wallace was informed the boat ramp would require a conditional use permit from the City, although she questioned whether the DNR was subject to local ordinance regulations in this instance. As the project progresses, DNR staff that can assist the City in its review are as follows: Alan Robin- Fingers DNR Frontenac Office 612-345-3331 Molly Shelldine Area Hydrologist 296 -7323 4601 Excelsior Blvd. • Suite 410 • Minneapolis, MN 55416 • (612) 925 -9420 • Fax 925 -2721 i Lastly, Ms. Wallace was questioned on the proposed ramp's relationship to the future Sillwater- Holton river crossing corridors. The proposed ramp is in a virtual direct line with the bridge corridor that extends due east of T.H. #36. Ms. Wallace indicated she was aware of this although she felt this was not of a concern as the boat launch can operate underneath the bridge. The only problem that would need to be resolved is the disruption and possible closure of the boat ramp during the construction of the bridge. cc: LaVonne Wilson