HomeMy WebLinkAbout1998-07-15 BRAA Ltr to MnDOTBonestroo
Rosene
Anderlik &
Associates
En & Architects
Jul 15, 1998
Sonestroo, Rosene, Anderlik and Associates, Inc. F
Principals., Otto G- Sonestroo, PE. • Joseph C. ,Ander
al 0 porturilt Emplo
n
Frz,
Richard E- Turner, PE. ■ Glenn R. Cook, P.E. ■ Robert c eWd
Robert W. Rosene. PE- and Susan M. Eberlin, C.PA., S
nsultants
Associate Principals.- Howard A. Sanford, P.E. ■ Keith
Richard IN- Foster, PE. ■ David Q. Loskota, P.E. • Rob
o on, P i Ro R. Ffefferle, PE-' ■
F, 1*3
sse A. -IM 'k jq;� P�-
Michael T. Rautmann, PE, ■ Ted K.Field, RE. • Kennet
erson, PE. Mark R. R PE,
Sidne P Williamson. PE., L.S. ■ Robert F Kotsmith
Rin • Michael P Rau, PE-
Allan Rick Schmidt. PE-
Offices: St. Paul, Rochester, Willmar and St. Cloud,
N Milwaukee. W1
Website., www.bonestroo.com
Mr. Paul Juckel
Minnesota Department of Transportation
3485 Hadle Ave N
Oakdale, MN 55128
Re: State Project No. 8204-37
Trunk Hi 36 and 5
BRA File No. 55-GEN
Dear Mr. Juckel:
The Cit of Oak Park Hei is in receipt of y our correspondence and Supplemental A
No. 5 for the subject pro and would like to draw y our attention to the fourth para of the
April 30, 1998 letter from the Cit of Oak Park Hei The letter clearl states that the Cit
would ac the 12 feet of ri necessar to accommodate the additional lane on
Trunk Hi 5 with the understandin that all other costs for the improvements on Trunk
Hi 5 will be financed with State and Federal funds.
Based on that previous understandin it is the Cit position that the land ac fulfills
their obli for cost sharin for the Trunk Hi 5 improvements and can not a to the
third "Whereas" contained in the Supplemental A No. 5.
Ver trul y ours,
BONESTROO, ROSENE, A►DERLIK & ASSOCIATES, INC.
Joseph C. Anderlik
JCA:dsb
cc: Mr. Thomas Melena, Cit of Oak Park Hei
Mr. Mark Vierlin
cor55-
2335 West Hi 36 n St. Paul, MN 55113 ■ 612-636-4600 ■ Fax.- 612-636-1311
I/
'ot
4>
00:-
June 1, 1998
Minnesota Department of Transportation
Metropolitan Division
Oakdale Office
3485 Hadley Avenue Forth
Oakdale. Minnesota 55128
Tom Melena
City of Oak Park Heights
14168 N. 57 Street, Box 2007
Oak Park Heights, MN 55082
SUBJECT.* SF 8204-37
Contract No, S97052
Dear Mr. Melena,
Find enclosed for your approval and signature, the original o f
py Supplemental Agreement No.
5 to State Project No. 8204 ®37 located at the intersection of T.H. 5
and T.H. 36.
Supplemental Agreement No. 5 provides final Payment to th
... q double P ym a States Contractor's for the
a 'difional work required to construct a double left turn movement for Southbound
Eastbound 5 Street, and a revised signal system to support this change ange in intersection traffic
movement.
This request was requested by the City of Oak Park Heights in a letter dated April 30, 1997 and
signed by the City Administrator, Mike Robertson. In this letter and a subsequent letter dated
May 13, 1997 the City agreed to pay fifty percent of all costs necessary to make the plan changes.
The City Administrator also agreed to acquisition of all additional R/'W needed to facilitate the
change at no cost to Mn/DOT.
Please sign the enclosed agreement and return to ran office so that I
Y may complete the final
payment process for this Contract.
An Equal Opportunity Employer
Minnesota Department of Transportation
Metropolitan Division
Oakdale Office
ti 3485 Hadley Avenue North
� Oakdale, Minnesota 55128
In closing once again, I would like to offer m sincere thanks t
Y o the City of Oak dark Heights
for your assistance in making the B wa Iran rovements ° '
� � p � your city a big success I
S mc e r 4
r
Paul Jug el
Pro 9 ect Supervisor
cc Joe Anderlik . Bonestroo Rosene Anderlik & Associates
Doug McArthur
R. W. Hathaway
P.M. B er nan
Maryanne Kelly Sonnek
An Equal Opportunity Employer
MN /DOT iP- 02134 -03 (5 /8Z
STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION Supp. to Contract No. S9705-
S AGRE EN 1 NO. 5 Sheet 1 of 2
Contrjetor: Pclrk Con stru ction Couip,
Address:
7940 Beech greet NE Account I.D. vqo❑iv
Mp1s., MN 55432
Pro. Rio.
Purchase Tenn I ssrt No.
000N ET
Fwcial Projftt: State P-mimt Yo:
8204 -37
NH STP 064-1(07
Ucatiow In Washington County on TH 36 from 180 meters East of
Ming Ave. IWNorthwesteYwAve. From Jc�'y'H 5 to NoMirmstern
Ave. In Oak Parr Heights.
C. CD_ 1 i C4CD. I C. Cn. 3 I C. CD. 4 1 cam _5
Type of 40 ( [ A4 [ [ Dated Nun�cr Futeted by
TransActiait: A44 [ A41 5 [ I A46 I I Dated Nuwber Emwnd Y
This contract is amended as follows:
Whereas: This Contract provides among other things for radio Surfacing, e
g g, g op 82006 and Electric
Lighting and Signal Systems, and
Whereas-, The C ity of Oak Park Heights in letters dated April 30, 1997 and August 4
p g , 1997 has requested a
double left turn movement for Southbound T. Ha 5 to Eastbound 58 Street and a revised signal
system to support this change in plan, and
Whereas: The City of Oak Park Heights in a letter from the City dministration dated
y August 4, 1 997 has
agreed to pay 50 of the costs to effect the above changes, and has further agreed to acquire ire
g q all the
necessary additional R1w, and
Whereas a The Engineer agrees that it would be in the best interest of Mn /DOT and the Ci of yak Park
Heights to modify the intersection as requested and the States contractor has agreed to
g perform the
extra work.
NOW, THEREFORE, IT IS HEREBY MUTUALLY LY AGREED AND UNDERSTOOD THAT:
. The Contractor shall perform all of the necessary construction to complete the herei
p nbe fore
mentioned work.
2. All work shall be performed in accordance with the 15 lan sheets labeled S.A.
p #5 which the
Contractor acknowledges receipt of by signing this agreement, and are incorporated into this
agreement by references.
3. All work shall be performed in accordance with appropriate Contract Provisions and Specifications
P
and as stated and directed by the Engineer.
4. Payment for the above mentioned work will be made on the basis of the negotiated p g p ces and
estimated quantities as listed below in the " Estimate of Cost" which shall be compensation in f u l l for
all costs inc idental thereto.
5. The Contract time will not be revised except as maybe rovided under Mn/DOT P Sgccif ication 1$06.
6. The Contractor will not make claim of any kind or character whatsoever for
any costs or expenses
which he may have incurred or which he may hereinafter incur, in erformin the work r b
this Agreement.
P g q y
MN/DOT TP- 02134 -03 (5/88
STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION Supp. to Contract No. 597052
SUPPLEME ACY MENT NO. 5 Sheet ue)
ESTIMATE OF COST
ITEM NO. IT NAME
NEG. UNIT
UNIT QtJANT°ITY PRICE AMOUNT
2 105.507
Common Excavation
n3
205
2.40
4 92.00
2105.507
Subgrade Excavation
n3
1024
1.50
1536.00
00
221 1.503
Aggregate Base (CV) Class 6
n3
186.3
19.00
3539.70
2340.508
Type 41 'wearing Course Mixture
t
11902
23.00
2741.60
60
2340.510
Type 41 Binder Course Mixture
t
119.2
21.00
2503.20
2340.514
Type 31 Base Course Mixture
t
163.9
20.00
3278.00
2357.502
Bituminous Material For T Coat
L
273.2
0.25
68.30
2503.541
300 mm Pipe Sewer Design 3006
M
9102
75.00
6840.00
2503.541
375 mm Pipe Suer Design 3006
m
3.6
72.00
259.20
2503.541
450 mm Pipe Suer Design 3006
m
3.2
84.00
268.80
2506.501
Construct Drainage Structure Design F
m
-.093
830000
-77.19
2506.501
Construct Drainage Structure Design C/
0078
850000
-66.30
2506.501
Construct Drainage Structure Des. C G/H rn
1 .48
840.00
1243020
2506.516
Casting Assembly
Each
2
400.00
800.00
0564.602
Payment Message (Left Arrow) Epoxy
Each
2
1 00.00
2004
0564.603
100 nom Solid Line White -Paint
rn
300
.50
150.00
25 65.511
Traffic Signal System Revision
S ig o Sys.
1
23578, 02
�7 Q
Net Increase 47,354.53
Croup 01
50% Mn /DOT
50% Oak Park Heights
APPROVED:
Conan issiotier o
Adini u'stration
is
Dared
APPROVED: original Contract
Commissioner t)f Finance
By
bated
APPROVED:
City of Oak Park
Heights
BY
Dated
Approved as to form and
execution
Assistant Attorney General
Date
P eject Eng-ineer
D -
U--
z p Contractor
Dat �421-le
ob
District Engineer
Dated
Agency Head
Original to State Auditor -Copy to Agency
I T Y C
A &I 1.KK HEIUH I b
0 KPA
14168 N. 57th Street - Pox 2407 - Oak Park Heights, NIN 35082 - Phone: (612) 439 -4439 • FAX 439 -0574
AuGUSt 4, 1997
( COPY
Adam Josephson
MNDOT, Waters Edge Building
1500 West County Road B2
Roseville, NN 55113
Rea TH 5 36 Improvements
State Prof ect No. 8204-37 8214 -119
City of, oak Park Heights
D ear Adam:
I any pleased to inform you that the City has officially acquired
the twelve feet of right-of-way necessary to institute the
additional l e f t turn lane on Trunk Highway 5 from Robert and
Janet Brac key . It is my understanding from Construction Manager
Paul Juckle that the costs for the left turn lanes have already
been reduced from the original estimates. The City is willing to
sit down with you and discuss a cooperative agreement covering
this and the other items- associated with the improvements to
Trunk Highway 5.
As stated in my previous Letter of April 30, 1997, the city will
pay 100- of the costs associated with the Southeast Frontage Road
changes and the turn lanes on 58th street assuming that a
Supplemental Agreement is negotiated. Because of unit prices
which are in place with the existing contract, reasonable
negotiations should be achievable
The City also understands that it will be responsible for the
design, construction, and costs for providing the additional
lanes on 58th street as well as the signal system at 58th street
and the southeast Frontage Road and that work cannot proceed
until 58th street is no longer required as a MNDOT detour route
Thank you for your assistance in this matter.
Sincerely,
Michael Robertson
City Administrator
cc: City Council.
City Attorney
City Engineer
Tree City U.S.A.
CITY C "
OAK PARK HEIGHTS
14168 N. 57th Street o Box 200 7 • oak Park Heights, LN 35082 • Phone: (6 12) 433 -4439 ° FAX 439 -05
April 30, 1997
Adam Josephson
MNDOT - Waters Edge Building
1500 West County Road B2
Roseville, MIS 55113
Re: TH 5& 36 Improvements
State Project No. 8204 ®37 8214 -119
City of oak Park Heights
The City understands that it will be responsible for the design,
construction, and costs for providing the additional lanes on
58th street as well as the signal system at 58th street and the
Southeast Frontage Road. However, that work cannot proceed until
58th street is no longer required as a MNDoT detour route.
The City is also requesting that MNDOT make the necessary
modification to the plans for TH - 5 improvements to provide for
dual Left turn lanes on southbound TH-5 to eastbound 58th street
This modi f icat ion would include changes required for the signal
system at this intersection. Realizing that MI DOT can not move
quickly in securing additional right-of-way, the City will
acquire the 12 feet of right-of-way necessary to accommodate the
additional lane on TH -5 . This acquisition will be financed by
the City with the understanding that all other costs for the
improvements on TH -5 will be financed with state and Federal.
funds.
Tree City U.S.A.
N
The city hopes that the changes required to handle traf f i
quickly so as t® minimize r in
this area can be made
� � m�n�mize cZaims f ®r
additional work and delays. Your prompt and expeditious ion
p � s response
to resolving this matter is greatly appreciated
Sincerely,
Mi chael Robertson
Ci ty Administrator
CC: City Council