Loading...
HomeMy WebLinkAbout2009-11-20 Public Works Update: Water Shut Off Reqeust Eric Johnson From: Andrew Kegley Sent: Friday, November 20, 2009 2:56 PM To: Eric Johnson Subject: Public Works Update 11/20/09 Public Works Update 11/20/09 Eric, Well 1 Well # 1 is back online. Fine tuning the Variable Frequency Drive as well as motor balancing took place Friday morning. I ran the well through several start up and shut down cycles to verify proper operation of the drive and also to verify the VFD synced with the existing SCADA Autocon control Panel. I am awaiting the invoice from Keys Well Drilling Company as it has to be attached to the Xcel Energy motor/ drive efficiency application for a refund. The application is due to Xcel Energy by December 4 ", 2009. SCADA The SCADA contract was finalized and approved and a notice to proceed has been issued. I expect Aaron Muller of Bonestroo will be setting up a Pre - construction meeting before installation of the system begins. I'll update as information arrives. Water Shut off Request 44230 Upper 54 Street N Staff met with Kim Mordick of 14230 Upper 54 Street N (Structure Fire) on Friday to verify the water service to the house is shut down. Notes indicate the water service was shut off after the fire; but by request was turned back for cleaning and construction later in the summer. The owner requested the water service be shut off during the winter months; however it appears large truck traffic bent the standpipe so the valve is no longer accessible. The owners are fully aware of their responsibility to correct the problem and assured the city it would be corrected soon. We will return to shut off service when the valve is accessible. Street Sweeping St. Croix Sweeping has completed fall street sweeping. Sewer Cleaning Sewer cleaning and televising continues. Preliminary verbal reports indicate the lines have been exceptionally clean and no defects have been found yet. The full report which includes footage of the sewer pipes will be provided at completion. Park Attendants Staff has selected five candidates for council approval to work as rink attendants for the 2009/2010 season. The candidates all cleared a background check from the P.D. The council action request will be on the December 1S , 2009 agenda. General P.W. Operations • Staff received training on the 0 &M of the new pressure reducing valves installed at the Washington County Government Center • Regular operation continues: locates, water meter reads, water shut -off requests and the like. • Plows on the new trucks are purchased — staff is preparing for plowing by trimming overgrowth on city trails • Staff is working to replace broken boards in the Brekke and Cover Park hockey rinks • Staff is drafting an RFQ to replace the Fascia and Soffit at the Valley View and Brekke Park Shelters. The results will be presented to the park commission at the December 14 meeting Andy Kegley 1 33 of 33