HomeMy WebLinkAbout2007-01-25 BCWD Ltr to ApplicantFrom: dsbington Conservation
July 25, 2007
Manley Commercia1, Inc.
2640. Eagan Woods Drive, Suite 220
Eagan, MN 55121
Please fcel free to contact me at 651-275-1136 ext 26 with any questions.
Sincerely,
Karen Kill BCWD Administrator
6512751254 07/25/20 14:21
BROWN'S
CREEK
WATERSHED
DISTRICT
11205 P. 00111131
1380 W F RAD NI TAG E R. D
HIGHWAY 36
STILLWATER, MN
5 5 0 8 2
651.275.1136 x26 [PHONE]
651.275.1254 I FAX
WWW. B CW D . 0 It
Mailed & Faxed: 651-289-5501
Re: BCWD Permit #07-10—Oak Park Center, Oak Park Heights, MN
Dear Manley Commercial, Inch;
The Brown's Creek Watershed District (BCWD) received a revised permit application on April 26, 2007, for the "Oak
Park Center" for the purpose of a 11,000 square foot strip mall east of Norell Avenue and South of TH 36 in Oak Park
Heights, MN.
ci(
Cc: Board of Managers
Mike Brandt, MFRA, 14800 28 Avenue North, Suite 140, Plymouth, MN 55447 FAX 763-476-8532
Cindy Weber, Manley Commercial, Inc. FAX: 651-289-5521
Eric Johnson, City of Oak Park Heights FAX: 65] -439-0574
MANAGERS
CRAIG LEISER, PRESIDENT • R.ICK VANZWOL, VICE-PRESIDENT • CONNIE TAILLDN, TREASURER,
e GERALD JOHNSON, SECRETARY • GAIL PUNDSACK
The BCWD Board approved BCWD Permit #07-10 Oak Park Center with eight conditions at the May 30, 2007 special
board meeting. The following conditions are still outstanding and required prior to the issuance of the permit:
1. Provide storrnwater facility maintenance instrument in a form acceptable to the District and proof of
recordation with Washington County. The maintenance instrument shall not be recorded with the County
until the draft is approved by District.
2. Sureties: $2,600 Grading/Alterations (required regardless of surety to Oak Park Heights)
$31,250 Stonnwater an Facilities (or proof of equal or greater surety with Oak Park
Heights).
3. In accordance with Section 8.0 of the BCWD" Rules and the Permit Fee Schedule adopted May 2003, when
a project is approved by the BCWD Board, the permit fee deposit must be replenished to the deposit
amount by the applicant before the permit will be issued to cover actual costs incurred to monitor
compliance and address non-compliance with the BCWD Rules. An costs incurred bythe BCIA.T1) greater
than the ermit fee d •osit balance will be billed to the a. licant. Any unused portion of the deposit
balance will be returned to the applicant when the Board has been notified in writing of the project's
completion and the Board determines that the work has been completed under the permit. To date, the
.130101) has been invoiee9,011R_br work cora ieted on this review through May 2007 ou are
required to r,_.1.__.L the depslit amount at this time. A permit fee statement has been enclosed for
your reference.