Loading...
HomeMy WebLinkAbout2007-06-05 BRRA Ltr to OPHJune 5, 2007 Mr. Eric Johnson City Administrator City of Oak Park Heights 14168 Oak Park Blvd., P.O. Box 2007 Oak Park Heights, PNN 55082'2007 Re: Oak Park Cente Bonestroo file No 55-07-000 Dear Eric: — � MOT , v— / 2335 Highway 36 St. Paul, MN 55113 Tel 651-636-4600 Fax 651-636 Bonestroo We have reviewed the Site Development Plans for Oak Park Center as submitted by McCombs Frank Roos Assocaites, Inc. on May 23, 2007. Following are our comments and/or recommendations. rk~°r ')nl l.Extend the 8.0 wide hituminous trail to the west property line, unless t isagood reason to stop it short. Qk=+r)nx 1. It appears that a vehicle woull'd have a difficult time leav the last parking stall on the northwest end without making several small movements. From sheet C3.O1 the development has exceeded the required number of parking stall. Therefore, it is recommended that the northeast stall is designated asano parking stall. This will provide more area for cars backing up and for cars 10 turn around if they enter the lot and it is full. Q knnt / xn, 1. bis estimated that a4 drop b between the sidewalk and the retaining wall on the west side of the building. What is the horizontal distance between the wall and the sidewalk? Will this 4^ drop be filled with some type of material? Adetai] is required showing the horizontal and vertical design for the sidewalk at the retaining wall. The location of the naiUng should also be shown on the detail. su Pam St. Cloud Rochester Milwaukee Chicago City of Oak Perk Heights Oak Park Center Page June 5, 2007 The drainage swale on the southwest side is directed into the adjacent property's trash enclosure, If possible, remove the drainage Swale and grade the area to sheet flow to the north /northwest onto Oak Park Center's property. 3. Note "di` under infiltration basin construction requirements call for the rip rap to be placed according to the detail on -9.01. This detail is for a rock check darn with 2 " - rock for Fo acres of drainage area. The rip rap i the rain gardens shall be a larger rock than 1 ' -" store. Sheet Fo I . There is a symbol at the end of the flared end section that is net called out in the legend. It almost appears to be a symbol used for protection at inlets. Rip rap shall be placed at the end of this F. Identify the quantity of rip rap that is being placed at the curb cuts to the rainwater garden. 3. On the east side of the parking lot, approximately 40 feet from the NE corner, there is a symbol that appears to represent inlet protection, however, there is no st ructure at this location. ppt C 1 I . The sizes and material for the existing sanitary sewer and water main shall be shown on the plans. The sanitary sewer is 8 " VC P sanitary sewer and the water main is 1 " DIPF 2 F 'The " PVC sanitary sewer shall be SDP 26, 3. The water service is being connected to the main line with a 6 1' 1 ;1 wet tap which would include a 6 1 " gate valve. The symbol for the gale should be shown on the plans. 4. The hydrant lead is shown as connecting into the sanitary sewer. In addition, this connection is a 6 U 12 11 wet tap which would include the gale at tapping. Therefore, a valve is not necessary three feet from the hydrant. Show the symbol for the wet tap valve on the plans. 5. The following comments all refer to the outlet structure for the rain garden: a. The detail shows a 12 " pipe entering the structure, however the plan view does not show this pipe. b. what is the elevation at the top of the structure? c. what type of casting is being placed on the structure? d. The note states that the orifice plate is removed through the 27 ti opening. A detail is required of this orifice plate. what material is it? Now is it removed? How is it attached to the bottom of the structure? Haw tall is it? e. The hydroD model shows a 5 1 ' opening for the orifice and the detail shows a 4.9 f` orifice. Cit of Oak Pork Hei Pa 3 Oak Park Center June 5, 2007 6. The followin comments all refer to the drain tile detail: a. What material is the "1 2" drain tile? b. The drain the trench should be wrapped with a g eotextile. c. The c a l l out for the dra file states ' " see Detail To "' the d eta il is to the ri 7. 1 n the plan view a note calls out to see 'inlet structure on C9.01. There is no in let structure on the drawin Cknnt (_ 0 n1 1, The followin note should be included in the plans: (- A- Fite h shall incorporate an AFC -- Waterous )L O 1N'oz_z'e, The h ,nt purnpei� nozzle shall be of one-piece desi compatible with a 5 " for hose couplin The nozzle shall he an inte part of the fire h and must be furnished b the manufacturer or authorized distributor desi b the manufacturer. for adapters will not be accepted. 2. The detail for the sanitar service has information missin as desi by, If xx 11 If y ou have an q uestions or re additional information, please contact me at (651) 604-4788 or Dennis Postler at (651) 604 -481 Sincerel BONESTROO Karen S, Erickson, P.E. C C Tom Ozzello, Public Works Director Jim Butler, Buildin Official Scott Richards, Cit Planner Mark Vier lin Cit Attorne Michael C. Brandt, McCombs Frank Roos Associates, Inc. DMP, BMK, CWLon , File — Bonestroo