HomeMy WebLinkAbout2006-07-11 Alliant Engineering Revised Ltr to OPH Re Bldg A & B Pad ElevationsAlliant Engineering, Inc.
July 11, 2006
Mr. Eric Johnson
City Administrator
City of Oak Park Heights
14168 Oak Park Blvd.
P.O. Box 2007
Oak Park Heights, MN 55082-2007
Re: Revised Letter Certifying Building Pad Elevation for Buildings A and B, Oak Park
Commons
Dear Mr. Johnson,
In my review and analysis of the as-build shots for building "A" I mistakenly compared the field shots on
the north side of building "A" to the finished floor elevation for building "B" thinking that the shots were
within a range 0.1 feet to 0.5 feet of the proposed finished floor elevation with only one shot being 0.5
feet. Please disregard my certification letter date June 29, 2006 which incorrectly stated the site
conditions of the building pads. 1 hope you will understand that this was a mistake and not an attempt to
deceive or manipulate the requirements of the City of Oak Park Heights. I apologize for the
inconvenience and confusion caused by the mistake. The following certification corrects that letter dated
June 29 2006.
1 hereby certify that Alliant Engineering, Inc. verified the rough graded elevation of the above two
buildings on June 28, 2006. The building pad for Building "B"is within 0.4 feet of the proposed finish
grade elevation depicted on the Grading and Erosion Control Plan prepared by Alliant Engineering, Inc.
and last revised on 5-3-06. The building pad for Building "A"is within 1.4 feet of the proposed finish
grade elevation depicted on the Grading and Erosion Control Plan prepared by Alliant Engineering, Inc.
and last revised on 5-3-06.
Please call me at 612-767-9304 if you require any additional information or have any comments or
questions.
Sincerely,
Dennis B. Olmstead
Professional Land Surveyor
Minnesota License No. 18425
Alliant Engineering, Inc.
cc Jeremy Thomas, R.J. Ryan
Aaron Kohler, AE
233 Park Avenue South, Suite 200, Minneapolis Minnesota 55415-1108
Phone 612.758.3080, Fax 612.758.3099