Loading...
HomeMy WebLinkAbout2006-04-12 BRAA Ltr to OPH Re General Plan ReviewBonestroo Rosene MEM Anderlik& " Associates En & Architects April 12, 2006 Mr. Eric Johnson 5 West Hi 36 n St. Paul, MN 55113 Office: 651-636-4600 w Fax: 651-636,-J-311 www.bonestroo.com Cit Administrator Cit of Oak Park Hei 14168 Oak Park Blvd., P.O. Box 2007 Oak Park Hei MN 55082-2007 Re: Lowes General Plan Review BRA File No. 55-05-000 Dear Eric: kk 400" G �7 We have reviewed the g eneral plans for the Lowe's More in the proposed Oak Park Commons development, as submitted b Ozark En Inc. Followin are our comments and/or recommendations. General Comments 1. On Februar 26, 2006 we had a meetin with Alliant En and CSM to discuss the g radin g responsibilities and installation of erosion control on the entire site. Lowe's nor Ozark En were present at this meetin It was presented to us that Lowe's would be g radin g their site, Novak Avenue North, Norwich Avenue North and the pond. In addition, the would be installin erosion control measures for these areas. At a later date, CSM will be submittin plans for g radin g the area north of the Lowe's development. Z. Lowe's will be constructin the storm sewer from the pond to the Applebee's pond. Drawins! Number 2 1. Wal-Mart will be constructin an 8' wide bituminous pathwa at their west propert line adjacent to Lowes. (See attachment for pathwa location.) This pathwa is adjacent to a sidewalk alon the west side of the Lowe's parkin lot. With this pathwa it is not necessar to construct the sidewalk, however, Lowe's needs to continue the pathwa north from Wal-Mart's propert line to the internal connector street, as shown on the attachment. St. Paul, St. Cloud, Rochester, MN 0 Milwaukee, Wl Y Chica IL Affirmative Action/E Opportunit Emplo and Emplo Owned Drawing Number 5 1. Bituminous removal will be required for the installation of the 24" storm sewer under Norwich Avenue North. 2. The existing flared end section (FES) in the Applebee's pond should be shown as a removal item. Drawing Number G 1. The City will assume ownership of the storm sewer from the pond to the Applebee's pond and therefore, the pipe shall be RCP. All private storm sewer can be HDPE. 2. A trash guard shall be placed on all flared end sections. 3. Rip rap shall be placed at the flared end section in the Applebee's pond. 4. The outlet Control Structure for the pond has changed. Verify with Alliant Engineering the design of the structure and the elevation/location of the flared end section. It appears the FES is extended beyond the 939.00 elevation. Drawing Number 8 1. Submit revised storm sewer rational sheet with a corresponding drainage area map. Drawings C-1 .r.� irrma.r� r rrriirar i - - i. 1. As per recommendations from the Brown's Creek Watershed District, the pond has been designed with an extensive system of draintile for infiltration of storm water into the ground. If in the future this draintile /infiltration system ceases to function as designed, the 100 -year HWL elevation of the pond will be higher than the catch basin rim elevations in Novak Avenue North (Nova Scotia Avenue North. Under this scenario storm water may exit the storm structures in Nova Scotia Avenue and flow overland into the proposed storm sewer system in 60 Street North Drawings from FFE 1. Verify with Folz, Freeman & Erickson, Inc. that you have received the most current information on the grading and erosion control measures for the stockpiles on the Oakgreen Village development. Plat 1. The plat does not show the additional roadway right of way needed on the east side on Nova Scotia Avenue North at the 60th Street North intersection. If you have any questions or require additional information, please contact me at (651) 604 -4788 or Dennis Postler at (651) 604 -4815. Sincerely, BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC. Karen S. Erickson, P.E. cc: Tom Ozzello, Public Works Director Jinn Butler, Building Official Scott Richards, City Planner Mark Vierling, City Attorney Kathy Widin, City Arborist Scott McGee- Ozark Engineering Clark Wicklund, Alliant Engineering DMP, BMK, File — Bonestroo & Associates K:\55\55privatelLowes csinksmphase i 4-7- 06.dac | QUO vHJ 801S N01SNVdXJ 0-199L# Avh*WM . ..... c qo tA QS O 3 ;j cr err ME Tap H re 19 31P l b Lw A r 4 NO 1r: 1p Ir ppp FIT I CO