HomeMy WebLinkAboutOT 2006-00147 Re-Roof ' OF OAK PARK HEIGHTS --' PERMIT NO.: 2006 -00147
14168 OAK PARK BLVD. N. #2007
OAK PARK HEIGHTS, MN 55082 -2007 DATE ISSUED: 07/05/2006
(651) 351 -1661 FAX: (651) 439 -0574
ADDRESS : 13948 55TH ST N
PIN : 05- 029 -20 -14 -0097
LEGAL DESC : RIVER HILLS
: LOT 10 BLOCK 3
PERMIT TYPE : OTHER
PROPERTY TYPE : RESIDENTIAL - OTHER THAN NEW
CONSTRUCTION TYPE : RE -ROOF
NOTE: WORK SHALL COMPLY WITH ALL MN STATE BUILDING CODE AND LOCAL ORDINANCE REQUIREMENTS. TEAR OFF
INCLUDED WITH PROJECT. PROJECT VALUATION: $4978.80
APPLICANT RES RE -ROOF 75.00
OTHER PERMIT SURCHARGE, FLAT 0.50
WEATHER GUARD CONSTRUCTION LICENSE VERIFICATION 5.00
5647 MEMORIAL AVE N TOTAL 80.50
OAK PARK HEIGHTS, MN 55082
(651)439 - 4320 PAID WITH CHECK # 7818
Minnesota State License #: 20282484
OWNER
PATRICK D & COLLEEN M KRUSE
13948 55TH ST N
OAK PARK HEIGHTS, MN 55082
AGREEMENT AND SWORN STATEMENT
The work for which this permit is issued shall be performed
according to: (1) the conditions of this permit; (2) the
approval plans and specifications; (3) the applicable city
approvals, Ordinances, and Codes; and, (4) the State Building
Code. This permit is for only the work described, and does
not grant permission for additional or related work which
requires separate permits. This permit will expire and become
null and void if work is not started within 180 days, or if work
is suspended or abandoned for a period of 180 days any time
after work has commenced. The applicant is responsible for
assuring all required inspections are requested in conformance
with the Minnesota State Building Code.
SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE.
INSPECTION RECORD
r�aerer rsnsr �ce��w COMMENTS
t
Rt FtZ Y Yfi >y,
Ft
li7 �
Ft 1M
Wallboard or Lath and Plaster - - -* ��
Final Building ...................
Final Plumbing ..................
Final Gas Piping ................ .
Final Heating and Ventilation ....... w ='
Sign..........................
J �
NOTES:
INSPECTION RECORD
x a
1 i
e.�c ✓� z U c y�
Rug
Ro
t
Fra
Ins
LJ
1�y�lb
Fi
.,
Wallboard or Lath and Plaster
r a
Final Building ........
Final Plumbing ................
Final Gas Piping ...............
Final Heating and Ventilation .....
Sign....................... ..
I �x�
NOTES: x