Loading...
HomeMy WebLinkAboutBP 1998-00650 Screened Porch 4 . • . yaorIt�M. ., ,f,. .a,=-.. t r!g * ! ! $`r -r ::. ir+t+ . ..TY BUILDING 74.75 CITY PLUMBING CITY OF OAK PARK HEIGHTS CITY MECHANICAL 49.25 PLAN REVIEW FEE 1.50 14168 57th Street North STATE SURCHARGE P.O. Box 2007 Oak Park Heights, MN 55082 -2007 SIGN PERMIT (612) 439 -4439 CITY UTILITY (METER) UTILITY CONNECTION FEE UTILITY INSPECTION FEE PERMIT NO, BP -98 -00650 Use Zone R -1 METRO S.A.C. INVESTIGATION FEE Permit Issued For SCREENED IN PORCH PARKS CHARGE OTHER PERMISSION IS HEREBY GRANTED TOTAL 125.50 Owner PAT KRUSE Contractor 13948 55TH ST N OAK PARK HEIGHTS MN 55082 430 -9444 00 -0000 To carry out the work specified on the following described property, upon the express condition that said persons and their agents, employees d workmen, in such work done, shall conform in all respects to the provisions of the Building Code. This permit may be revoked at any time upon theiolation of the provisions of said code. • JOB ADDRESS I CLASS OF WORK ' ;NUMBER STREET NEW ADD SIGN ALTER REPAIR MOVE DEMOLISH 13948 55TH ST N X I If FRONT or I AREA OF WIDTH 510E or LENGTH HEIGHT NO. OF TYPE OF MAX. OCC. IN FEET IN FEET STORIES LOT CONST. OCCUPANCY LOAD VALUATION IN FEET OCCUPIED 19 14 18 266 V —N R -3 PROPERTY DESCRIPTION: LOT BLOCK AUTHORIZED WORK/SPECIAL CONDITIONS: CONSTRUCT PER APPROVED PLAN. WORK SHALL COMPLY WITH MN STATE BUILDING CODE REQUIREMENTS. SMOKE DETECTORS REQUIRED AS PER SECTION 310.9 OF THE UNIFORM BUILDING CODE 3 ISSUE DATE: 8/24/98 EXPIRATION DATE: 8/24/99 The applicant hereby agrees to do all work in accordance with the Ordinances of the Local Municipality, State Building Code and the requirements enforced by the City of Oak Park Heights Building Department I further agree to notify the Building Official of each of the required inspections 24 hours in advance as noted on Inspection Record Card. A CERTIFICATE OF OCCUPANCY MUST BE REOUESTED AND ISSUED PRIOR TO USE OR OCCUPANCY. THIS PERMIT SHALL EXPIRE AND BE NULL AND VOID OF THE WORK AUTHORIZED BY THE BUILDING PERMIT IS NOT COMMENCED WITHIN 60 DAYS OF THE DATE OF ISSUANCE OR IF WORK IS ABANDONED OR SUSPENDED FOR A PERIOD OF 120 DAYS. TE THE P RMIT IS 12 MONTHS FROM DATE OF ISSUE \fiti 900 Z i'9(?) INGO /UTH• ZED AGENT Owner or Contractor PENALTY FOR VIOLATION OF ANY OF THE PROVISIONS OF BUILDING CODE. FINE NOT TO EXCEED FIVE HUNDRED DOLLARS ($`5C0.00) OR IMPRISONMENT FOR NOT MORE THAN NINETY (9C) DAYS, OR 20TH.