Loading...
HomeMy WebLinkAbout2006-08-11 BCWD Inspection Report to Applicant. . :., �•,• ;'• fir; .c, BR:� vV N' S CREED WATERSHED DISTRIC k CONSTRUCTION SITE INSPECTION PROGRAM Brown's Creek Watershed District c/o Washington Conservation District 1380 W Frontage Road, Hwy 36 Stillwater, Minnesota 55082 Phone: (651) 275• -1136 Fax: (651) 275 -1254 www.bcwd.org Randy Rauwertink CSM Corporation 500 Washington Avenue South, Suite 300 Minneapolis, MN 5541.5 Project: Village at OPH Dear Randy: August 11, 2006 Permit #: 2005 -04 Mailed and faxed (612 395 - 7002) The Brown's Creek 'Watershed District (BCWD) conducted an inspection for erosion and sedimentation control issues at the site noted above on 811012406. The following report summarizes the field inspection findings and describes areas of cornpliancelnon compliance with the BCWD permit Rule 3.0 Erosion control. Our inspections Will be using the procedures and protocols defined in the Minnesota Pollution Control Agency (MPCA) National Pollutant Discharge Elimination System (NPDES) General Stormwater Permit for Construction Activity. INSPEC'T`ION REPORT oOD This grade describes the overall condition of t h e site. Not Applicable All positive slopes within 200' of a water of the state or conveyance to a Water of the state must have temporary protection or permanent cover within 7, 14, or 21 days, depending on the slope (or sooner if a special water). Comments: Pond area not connected. ,...................................................... ............................... ..................... ........................ ............................... ,.....,.................,........................................... Not Applicable .................................................................,................................................................................................................................................................................... ............................... .., The normal wetted perimeter of temporary or permanent ditch that drains water must be stabilized Within 24 hrs of connection (200' back from the surface water). Comments: ....-...-............................................... ..................................... ............... ........... .. ............... ............................... .............................. Compliant ... ... ....... ... ........ . ......... .......... ................. ............................................ ............................................................. ...................... . ........................................................... .." .......... Temporary or permanent energy dissipation trust be installed at outlets connected to surface water (required within 24 hours of con- nection to a surface Water)? Comments: # ., Compliant Sediment discharge must be adequately controlled and minimized. Comments: �- ...................... .� .. ............................... .................................................................................................. Compliant .. ... ... .................... .......................... ........ . ..................................................... ........ ............ ............... .. ..................................... .. ....................... ... .......................................... ........................... .................. .................................. Temporary sedimentation basins required for disturbance over 10 acres, or less than 5 acres if near NPDES identified special water areas. Comments: Using proposed pond ............................... ........................................................ .............. ............................... .................... ........... .............. ......................... I ............ -.1- ........................... ....................................................................................................................................................................................................................... ........ ... Com p leant Inlet control devices must be installed and maintainded at all inlets. Comments: Recommend replacement of silt fence boxes where grading has damaged or install drop -in protection in catch basins. .... ..... ...... ......................................... ........................... ......... . ......... . ................. ................................................ ............ ............ . ........................................................... I.. ........................................................... .............................. Compliant ........ ... .... .............................. Down gradient perimeter controls must be installed and maintained. Comments: Recommend rock check dam at eastern end of stormwater pond behind Applebeets restaurant. ... ..................... 11....­ ................. I., ...... '­...'­­..'.. ....... ............................................ ............11................. Not Applicable ...............11.11........... .......... Slope breaks must be installed on 3:1 slopes or greater with unbroken slope lengths exceeding 75 feet. Comments: , .............................. ... ............ ................... Compliant ................. ............ .. ...... .. ............ ....... .................. ...................................................... .................................................. .. ................ ,.................................. , .................... .... ....... . ......... ........... ......................................................................... ..........,........... ............................... Temporary soil stockpiles must have effective sediment controls and not be placed in a surface water or storm water conveyance. Comments: • �.� 2 Compliant Erosion and sediment control BMP must be ade maintained Comments: ........................ ............ ................. I .... Compliant . ... ......... I .... I-- ......... ....................................... ...... Temporar sedimentation basin maintenance performed (re when collected sediment reaches 'I2 basin volume) Comments: ............................................................................ Not Applicable ................................................ I ..................... I ....................................... I ....... .......... 11 ......... ....... Sediment deposits in ditches or surface waters must be removed within 24-hours Comments: - ......................................... ...................... 1­1 ................... ........... __ Compliant .................. ................. .................................................................... .............. . ..................... ......... ................... ................... Minimization and cleanup of sediment trackin on paved surfaces Comments: Continue sweepin throu da as trucks are haulin Make sure that roadwa is clean at end of work da ............................. ..................... ..................... ........................... . ................... ­­ ......................................... . ............ . ................................. ........ ........................................ .............. .................. ................ .. . ............................ Not Inspected .................................................................................................... Pollution prevention mana measures for solid waste, hazardous materials and truck washin are in place. Comments: Status Ins ction Not Inspected Stormwater Pollution Prevention Plan on site Comments: ............ I ......... . . I ......... I ...... I ........... ........ ........ Not Inspected . . ..... I ........ ­­-.1-11 .......... .................................................... ................... ........... . ................ I ....... I-- .......... ........ I .............. ............................ ....... - ........ ..... .......... Inspections/maintenance forms completed ( inspections re I per 7 da or within 24 hours of a .0.5 inch precipitation event) ? Comments: iStatus Stormwater Mana Re Pretreatment prior to dischar to surface water (> I -acre impervious) Comments: �Status Surface water or off-site impa ets UNDER REVIEW Untreated dewaterin causin turbid dischar to surface waters or erosion off site Comments: ......................... ...................... I ........... I-- .. ...... .... ............ ............... ... ........ ­'_ ...... ....................................................................... Not Applicable ............................... .................... ............. - ...... . ................................ resource water resoumpacts Wetland or other w i ............... ..................... .............................................................................................................................................................. ... ....... ................... ............... ........... ....... .................. .................. __ ...................... ............................... ........... Under Review ­ ................... ­­ ­­.......... ........................... . . . ............ Offsite sediment dischar documented Comments: MAINTENANCE AND COMPLIANCE STATUS - SUMMARY OVERALL SITE GRADE: ff1'P'ffW A status described above as non-compliant indicates a permit violation that must be addressed in accordance with the BCWD Permit. Follow-tip inspections will be conducted on a re basis. Please contact Karen Kill at 651-275-1136, extension 26 if y ou have an q uestions. Respectfull R Flemin BCWD Inspector cc: Karen Kill, BCWD Grant Jensen, Skanska Pete Klin Bonestroo Eric Johnson, Oak Park Hei GRADE DESCRIPTIONS A The site is in full-corn all practices are in place, and the site is well maintained. B The site is in coin liance, but normal maintenance activities are re C The site is not in complia-rice. Maintenance or supplemental practices are re D The site is not in compliance. Erosion and sediment control practices are in poor condition and controllable water resource or off-site impacts are likel Contact the District for a follow-up inspection as soon as correction measures have been taken. F The site is in severe non - compliance. Controllable water q ualit y or off-site impacts have occurred. Enforcement proceedin will be initiated unless immediate corrective actions are taken. Contact the District immediatel to schedule a follow-tip inspection. BCWD Construction Stormwater Pro 811012006 BCWD (651) 275-1136 426 Inspector: R Fleming