Loading...
HomeMy WebLinkAboutBP 1995-00684 Deck / CITY BUILDING CITY PLUMBING - CITY OF OAK PARK HEIGHTS CITY MECHANICAL PLAN REVIEW FEE 14168 57th Street North STATE SURCHARGE r P.O. Box 2007 SIGN PERMIT Oak Park Heights, MN 55082 -2007 (612) 439 -4439 CITY UTILITY (METER) UTILITY CONNECTION FEE UTILITY INSPECTION FEE • METRO S.A.C. PERMIT NO. BP...95. 00681 Use Zone R-2 INVESTIGATION FEE Permit Issued For PARKS CHARGE L7 EC K OTHER PERMISSION IS HEREBY GRANTED TOTAL Owner Contractor JEFF JACOBY PAUL WOLF E" CONSTRUCTION 142:1 55TH ,.. N 1567 1IAMMOND RD OAF. PARK. HEIGHTS MN 55082 WI-Ei rE: BEAR LAKE MN 55.11 430- - 1305 6-53Q-3222 To carry out the work specified on the following described- property, upon the express condition that said persons and their agents, employees and workmen, in such work done, shall conform in all respects to the provisions of the Building Code. This permit may be revoked at any time upon the violation of the provisions of said code. JOB ADDRESS I CLASS OF WORK NUMBER STREET NEW. ADD SIGN ALTER REPAIR MOVE DEMOUSH . ✓ 33.. `5U4 S it_ — — ar I SIDE or LENGTH I HEIGHT NO. AREA OF TYPE OF I MAX. OCC: I WIDTH IN FEET IN FEET STORIES LOT CONST. OCCUPANCY II LOAD VALUATION E IN FEET OCCUPIED I V_. N R--.3 3_000 PROPERTY DESCRIPTION: LOT BLOCK EK, AUTHORIZED WORK/SPECIAL CONDITIONS: CONSTRUCT PER APPROVED PLAN AND MUST ME.E:I ALL MN STATE BUILDING CODE'.:;.. PLEASE NOTE THAT SMOKE DETECTORS MUST BE . INSTALLED IN ALL THE BEDROOMS PE:F? THE 94 UNIFORM BUILDING CODE SECTION 3 0 „ , ., I ,. <c , ISSUE DATE: 4/05/95 EXPIRATION DATE: 4/03/96 The auolicant hereby agrees to do all work in accordance with the Ordinances of the Local Municipality, State Building Code and the requirements enforced by the City of Oak Park Heights Building Department I further agree to notify the Building Official of each of the required inspections 24 hours in advance as noted on Inspection Record Card. A CERTIFICATE OF OCCUPANCY MUST BE REQUESTED AND ISSUED PRIOR TO USE OR OCCUPANCY. 'THIS PERMIT SHALL EXPIRE AND BE NULL AND VOID OF THE WORK AUTHORIZED BY THE BUILDING PERMIT IS NOT COMMENCED WITHIN 60 DAYS OF THE DATE OF ISSUANCE OR IF WORK IS ABANDONED OR SUSPENDED FOR A P . • • 120 DAYS. T ' - TH P • MIT IS 12 MONTHS FROM DATE OF ISSUE. mss.....atill ' l / - _ LOING • • ' r ' • ' EED AGENT _ - Owner o tractor G . is PENALTY FOR VIOLATION OF ANY OF THE PROVISIONS OF BUILDING CODE. FINE NOT TO EXCEED FIVE HUNDRED DOLLARS ($500.00) OR IMPRISONMENT FOR NOT MORE THAN NINETY (90) DAYS, OR BOTH.