Loading...
HomeMy WebLinkAbout2008-12-18 NAC Ltr to ApplicantNORTHWEST ASSOCIATED CONSULTANTS, INC. 4800 Olson Memorial Hi Suite 202, Golden Valle MN 66422 Telephone: 763.23 .2555 Facsimile: 763.231.2561 plan ners@nacpla nnin December 18, 2008 Sent Via Fax Transmissi 51.483.2574 Mr. Rand En Suety and Associates 2345 Rice Street, Suite 210 St. Paul, MN 55113 9 RE: Oak Park Hei — Cit Hall and Pu Iic Works-FaclIAT— Application For Conditional Use Permit, Site Plan Review, Desi Guidelines Review FILE NO: 798.04 — 08.03 Dear Mr. En The Cit of Oak Park Hei is in receipt of the application and materials that y ou prepared and submitted on December 10, 2008 seekin consideration for the construction of the Cit Hall and Public Works Facilit The application consists of re for a conditional use permit for open and outdoor stora a possible conditional use permit for buildin hei site plan, and Desi Guidelines review. With this letter, we are notif y ou that y our application will be deemed complete with receipt of the followin items b December 23, 2008. The application materials will need to be received b the Cit on that date so that the public hearin ma move forward on Januar 8, 2009. 1. A revised site plan indicatin a new location for the trail on the west side of the propert This chan ma be pendin a decision of the Cit Hall Committee on this revision, 2. Additional li plans :reflectin the hat box fixture desi and the alternative LED fixtures proposed b the project architect. This chan ma also be pendin a decision of the Cit Hall Committee. 3. Dimensions of the proposed wall si and method of li the letters. 4. Detailed plans for the Cit impound lot and Public Works stora area to include elevation dia of the fencin and g ates. The dia shall clearl label the t of buildin materials. 5. Colored buildin elevations reflectin the material colors chosen b the Cit Hall Committee. The pro architect shall provide buildin material boards for Plannin Commission and Cit Council review. Mr. Rand En Pa Two 6. Buildin hei details to include the mean g round level of the buildin to the midpoint of the main g able roof, to the midpoint of the rotunda, and to the peak of the rotunda roof. If all of the application materials are submitted as re the Plannin Commission would consider the application at their meetin scheduled for Januar 8, 2009 at 7:00 PM in the Cit Hall Council Chambers. Please contact me with an q uestions y ou ma have. Sincerel NORTHWEST ASSOCIATED CONSULTANTS, INC. Scott D. Richards, AICP Senior Planner C4 Eric Johnson Julie Hultman