Loading...
HomeMy WebLinkAboutOT 1997-00348 Window Replacement • ' TY BUILDING CITY PLUMBING CITY OF OAK PARK HEIGHTS CITY MECHANICAL PLAN REVIEW FEE 14168 57th Street North . SURCHARGE . 50 P.O. Box 2007 SIGN PERMIT Oak Park Heights, MN 55082 -2007 (612) 439 -4439 WTI UTILITY (METER) UTLITY CONNECTION FEE UTLITY INSPECTION FEE PERMIT NO. OT -97 -00348 Use Zone R - METROS.A.C. INVESTIGATION FEE Permit Issued For WINDOW REPLACEMENT PARKS CHARGE OTHER 2 5.00 PERMISSION IS HEREBY GRANTED TOTAL 2 5.50 Owner DONALD GROSCHEN Contractor RENEWAL BY ANDERSEN 14807 55TH ST N 1700 BUREKLE RD OAK PARK HEIGHTS, MN 55082 WHITE BEAR LAKE MN 55110 00 -0000 430 -7255 To carry out the work specified on the following described property, upon the express condition that said persons and their agents, employees and workmen, in such work done, shall conform in all respects to the provisions of the Building Code. This permit may be revoked at any time upon the violation of the provisions of said code. JOB ADDRESS CLASS OF WORK NUMBER STREET NEW ADO SIGN ALTER REPAIR MOVE DEMOUSH .4807 55TH ST N X FRONT or SIDE or LENGTH HEIGHT NO. AREA OF TYPE OF MAX OCC. I WIDTH IN FEET IN FEET STORIES LOT CONST. OCCUPANCY LOAD VALUATION FEET I I OCCUPIED V -N R -3 PROPERTY DESCRIPTION: LOT BLOCK AUTHORIZED WORK/SPECIAL CONDITIONS: INSTALL PER MANUFACTURER'S SPECIFICATIONS AND MUST COMPLY WITH ALL MN STATE BUILDING CODE REQUIREMENTS. SMOKE DETECTORS MUST BE INSTALLED PER SECTION 310.9 OF THE U.B.C. " ** ISSUE DATE: 3/21/97 EXPIRATION DATE: 3/21/98 The applicant hereby agrees to do all work in accordance with the Ordinances of the Local Municipality, State Building Code and the requirements enforced by the City of Oak Park Heights Building Department I further agree to notify the Building Official of each of the required inspections 24 hours in advance as noted on Inspection Record Card. A CERTIFICATE OF OCCUPANCY MUST BE REQUESTED AND ISSUED PRIOR TO USE OR OCCUPANCY. 'THIS PERMIT SHALL EXPIRE AND BE NULL AND VOID OF THE WOR . - ORIZED BY THE BUILDING PERMIT IS NOT COMMENCED WITHIN 60 DAYS OF THE DATE OF ISSUANCE OR IF WORK IS ABANDONED OR SUSPENDED FOR A , P F ERIO OF 120 D - =. - OF TH P RMIT IS 12 MONTHS FROM DATE OF ISSUE �-• X BUILDING OFFICIAL/AUTHORIZED AGENT Owner or Contractor PENALTY FOR VIOLATION OF ANY OF THE PROVISIONS OF BUILDING CODE. FINE NOT TO EXCEED FIVE HUNDRED DOLLARS ($500.00) OR IMPRISONMENT FOR NOT MORE THAN NINETY (90) DAYS. OR BOTH.