Loading...
HomeMy WebLinkAboutOT 1997-00396 Re-Roof , .N. •+4g igiAl• '• .„... -.. rs."”,•••• •• ? 1 1K7Illip, , gA ' c / / � irpf `� p1.7r. IMMOTI ,'9240. , '".`e4V ;u Wry , fi. ON, • l , Y BUILDING CITY PLUMBING CITY OF OAK PARK HEIGHTS CITY MECHANICAL PLAN REVIEW FEE . 50 14168 57th Street North STATE SURCHARGE P.O. Box 2007 SIGN PERMIT Oak Park Heights, MN 53082 -2007 (612) 439 -4439 cm UTILITY (METER) UTILITY CONNECTION FEE UTILITY INSPECTION FEE PERMIT NO. OT -97 -00396 Use Zone R- METROS.A.C. INVESTIGATION FEE Permit Issued For REROOF PARKS CHARGE OTHER 2 5.00 PERMISSION IS HEREBY GRANTED TOTAL 25.50 Owner MICHELLE SCHILLING Contractor 14887 UPPER 56TH ST N OAK PARK HEIGHTS, MN 55082 439 -5870 00 -0000 To carry out the work specified on the following described property, upon the express condition that said persons and their agents, employees and workmen, in such work done, shall conform in all respects to the provisions of the Building Code. This permit may be revoked at any time upon the violation of the provisions of said code. JOB ADDRESS I CLASS OF WORK NUMBER STREET NEW ADO SIGN ALTER REPAIR MOVE DEMOUSH 14887 UPPER 55TH ST N ( I 1 X 1 FWIOTH� SIDE or LENGTH HEIGHT NO. AREA TYPE OF I MAX OCC. IN FEET IN FEET STORIES OCCUPIED CONST. OCCUPANCY LOAD VALUATION IN FEET . m. 1 V -N R -3 PROPERTY DESCRIPTION: LOT BLOCK AUTHORIZED WORK/SPECIAL CONDITIONS: INSTALL PER MANUFACTURER'S SPECIFICATIONS AND MUST COMPLY WITH ALL MN STATE BUILDING CODE REQUIREMENTS. ISSUE DATE: 6/1 1 / 9 7 EXPIRATION DATE: 6 / 1 / 9 8 The anoficent hereby agrees to do all work in accordance with the Ordinances of the Local Municipality, State Budding Code and the requirements enforced by the City of Oak Park Heights Budding Department I further agree to notify the Building Official of each of the required inspections 24 hours in advance as noted on Inspection Record Card. A CERTIFICATE OF OCCUPANCY MUST BE REOUESTED AND ISSUED PRIOR TO USE OR OCCUPANCY. 'THIS PERMIT SHALL EXPIRE AND BE NULL AND VOID OF THE WORK AUTHORIZED BY THE BUILDING PERMIT IS NOT COMMENCED WITHIN 60 DAYS OF THE DATE OF ISSUANCE OR IF WORK IS ABANDONED OR SUSPENDED FOR A PERIO 1 • • • : 120 DAYS . OF T E - ERM 2 MONTHS FROM DATE OF ISSUE / BUILDING OFFICIAUA ■RIZw AGENT Owner or Contractor PENALTY FOR VIOLATION OF ANY OF THE PROVISIONS OF BUILDING CODE. FINE NOT TO EXCEED FIVE HUNDRED DOLLARS ($500.00) OR IMPRISONMENT FOR NOT MORE THAN NINETY (90) DAYS, OR BOTH.