Loading...
HomeMy WebLinkAbout2011-04-13 BCWD Erosion & Sediment Control Inspection Report BROWN'S CREEK WATERSHED DISTRICT Brown's Creek Watershed District cio CONSTRUCTION SITE INSPECTION PROGRAM Washington Conservation District 1380 W Frontage Road, Hwy 36 ;•••• ���.. Stillwater, Minnesota 55082 ;1 EROSION &SEDIMENT CONTROL Phone: (651) 275-1136 INSPECTION REPORT Fax: (651) 275 -1254 www.bcwd.org Larry Hasty April 13, 2011 Autozone 123 South Frontage Street, � A � () Permit #: 2010 -19 Memphis, TN ' Mailed and faxed Project: Autozone — 1(� 1.3 \� / Dear Larry: The Brown's Creek Watershed District (BCWD) conducted an inspection for erosion and sedimentation control issues at the site noted above on 4/11/2011. The following report summarizes the field inspection findings and describes areas of compliance /non- compliance with the BCWD permit Rule 3.0 Erosion control. Our inspections will be using the procedures and protocols defined in the Minnesota Pollution Control Agency (MPCA) National Pollutant Discharge Elimination System (NPDES) General Stormwater Permit for Construction Activity. INSPECTION REPORT Grade B - GOOD This grade describes the overall condition of the site. Status Erosion Control Requirements Compliant All positive slopes within 200' of a water of the state or conveyance to a water of the state must have temporary protection or permanent cover within 7, 14, or 21 days, depending on the slope (or sooner if a special water). Comments: Design calls for roof drainage onto steep exposed slope on west side of site. Temporary down drains may be necessary to convey roof water until final stabilzation of _ slope with vegetation. Compliant The normal wetted perimeter of temporary or permanent ditch that drains water must be stabilized within 24 hrs of connection (200' back from the surface water). Comments: Not Applicable Temporary or permanent energy dissipation must be installed at outlets connected to surface water (required within 24 hours of connection to a surface water)? Comments: Status Sediment Control Requirements Compliant Sediment discharge must be adequately controlled and minimized. Comments: - Not Applicable Temporary sedimentation basins required for disturbance over 10 acres, or less than 5 acres if near NPDES identified special water areas. Comments: Compliant Inlet control devices must be installed and maintained at all inlets. Comments: Compliant Down gradient perimeter controls must be installed and maintained. Comments: Not Applicable Slope breaks must be installed on 3:1 slopes or greater with unbroken slope lengths exceeding 75 feet. Comments: Compliant Temporary soil stockpiles must have effective sediment controls and not be placed in a surface water or storm water conveyance. Comments: Status Maintenance Requirements 2 Compliant Erosion and sediment control BMP must be adequately maintained Comments: Not Applicable Temporary sedimentation basin maintenance performed (required when collected sediment reaches %2 basin volume) Comments: Not Applicable Sediment deposits in ditches or surface waters must be removed within 24 -hours Comments: - Compliant Minimization and cleanup of sediment tracking on paved surfaces Comments: - Maintain rock track pad to prevent sediment from leaving site. Avoid vehicles parking in mud when possible. • Not Inspected Pollution prevention management measures for solid waste, hazardous materials and truck washing are in place. Comments: Status Inspection Requirements Not Inspected Stormwater Pollution Prevention Plan on site Comments: Not Inspected Inspections /maintenance forms completed (inspections required 1 per 7 days or within 24 hours of a .0.5 inch precipitation event)? Comments: Status Stormwater I\lanagement Requirements Pretreatment prior to discharge to surface water (> 1 -acre impervious) Comments: Status Surface water or off -site im )acts Compliant Untreated dewatering causing turbid discharges to surface waters or erosion off site Comments: Not Applicable Wetland or other water resource impacts Compliant Offsite sediment discharges documented Comments: MAINTENANCE AND COMPLIANCE STATUS SUMMARY OVERALL SITE GRADE: B - Good A status described above as non - compliant indicates a permit GRADE DESCRIPTIONS violation that must be addressed in accordance with the BCWD inspections will be conducted on a regular A The site is in site i well full-compliance, all practices are in Permit. Follow-up P g place, and the site is well maintained. basis. Please contact Karen Kill at 651- 275 - 1136, extension 26 if you have any questions. B The site is in compliance, but normal maintenance activities are required. Respectfully, C The site is not in compliance. Maintenance or supplemental practices are required. oaw G , D The site is not in compliance. Erosion and sediment control practices are in poor condition and controllable water resource or off -site impacts are likely. Contact the District for a follow -up inspection as soon as correction measures have been taken. Ryan Fleming, BCWD Inspector F The site is in severe non - compliance. Controllable water quality or off -site impacts have occurred. cc: Karen Kill, BCWD Enforcement proceedings will be initiated unless immediate corrective actions are taken. Contact the District immediately to schedule a follow -up inspection. • BCWD Construction Stormwater Program 4/11/2011 BCWD (651) 275 - 1136 #26 Inspector: Ryan Fleming