HomeMy WebLinkAboutFP 2010-00300 Contractors Material & Test Certificate for Above Ground Piping (04-11-11) Contractor's Material and Test Certificate for Aboveground Piping PROCEDURE Upon completion of work, inspection and tests shall be made by the contractor's representative and witnessed by an owner's representitive. All defects shal be corrected and system left in service before contractors personnel finally leave the job. A certificate shall be filled out and signed by both representitives. Copies shall be prepared for approving authorities, owners and contractor. It is understood the owner's representative's signature in no way prejudices any claim against contractor for faulty material, poor workmanship, of failure to comply with approving authority's requirement- o local ordinances. Property name ALDI Date Property address 13747 - 60TH STREET OAK PARK HEIGHTS, MN P 2C0- e CXJ Accepted by approving authorities (names) Address Plans Installation conforms to accepted plans ❑ Yes ❑ No Equipment used is approved ❑ Yes ❑ No If no, explain deviations Has person in charge of fire equipment been instructed as to location of U Yes U No control valves and care and maintenance of this new equipment? If no, explain? Instructions Have copies of the following been left on the premises? ❑ Yes LI No 1. System components instructions ❑ Yes [] No 2. Care and maintenance instructions ❑ Yes 0 No 3. NFPA 25 ❑ Yes D No Location of Supplies buildings RETAIL BLDG. system Year of Temperature Make Model Manufacture Orifice size Quantity rating TYCO EC -14 2010 3/4" 82 286 TYCO TY -FRB 2010 1/2" 20 155 • Sprinklers TYCO DS -1 2010 1/2" 22 286 Type of pipe XL THREADED , SCH. 10 & SCH. 7 GROOVED Pipe and fittings Type of fittings THREADED & GROOVED Alarm device Maximum time to operate through test connection Alarm valve or Type Make Model Minutes Seconds flow indicator VANE POTTER VSF -R .3a Dry valve Quick Opening Device (Q.O.D.) Make Model Serial no. Make Model a no. Time to trip Alarm through test Trip poi operated Dry pipe operating connection* Water pressure it pressure ressure Time water reached test outlet* properly test Minutes Seconds psi psi psi Minutes Seconds Yes No Without Q.O.D. With \ Q.O.D. If no, ex I 'ate *Measure ime inspector's test connection is opened Operation ❑ Pneumatic ❑ Electric ❑ Hydraulic Piping supervised? ❑ Yes ❑ No 'Detecting media supervised? (Detecting media supervised? Does valve operate from the manual trip, remote, or both control stations? ❑ Yes ❑ No Is there an accessible facility in each If no, explain Deluge and circuit for testing? ❑ Yes ❑ No preaction valve Does each circuit operate Does each circuit operate Maximum time to operate supervision loss alarm? valve release? release Make Model Yes No Yes No Minutes Seconds Residual pressure Pressure reducing Location and floor Make and model Setting Static pressure (flowing) Flow rate valve test Inlet (psi) Outlet (psi) Inlet (psi) Outlet (psi) Flow (gpm) Hydrostatic: Hydrostatic tests shall be made at not less than 200 psi (13.6 bar) for 2 hours or 50 psi (3.4 bar) above static pressu s in excess of 150 psi (10.2 bar) for 2 hours. Differential dry -pipe valve clappers shall be left open during the test to prevent damage. _II Test description aboveground piping leakage shall be stopped. Pneumatic: Establish 40 psi (2.7 bar) air pressure and measure drop, which shall not exceed 1.5 psi (0.1 bar) in 24 hours. Test pressure tanks at normal water level and air pressure and measure air pressure drop, which shall not exceed 1.5 psi (0.1 bar) in 2i hours. All piping hydrostatically tested at psi for hours. If no, state reason Dry piping pneumatically tested ❑ Yes ❑ No Equipment operates properly ❑ Yes ❑ No Do you certify as the sprinkler contractor that additives and corrosive chemicals, sodium silcate or derivatives of sodium silicate, brine, or • other corrosive chemicals were not used for testing systems or stopping leaks? ❑ Yes ❑ No Tests Re ' gauge located near water supply test connection: Residual pr with valve in test connection open Drain test psi wide: 3u psi Underground mains and lead in connections to system risers flushed before connection made to sprinkler piping? Verified by copy of the U Form No. 85B Yes ME No Other Explain Flushed by installer of underground sprinkler piping Yes _ No If powder -driven fasteners are used in concrete, has ❑ Yes ❑ No If no, explain Blank testing Number used !Locations Number removed gaskets Welded piping U Yes U No If yes... • Do you certify as the sprinkler contractor that welding procedures comply with the requirements of at least AWS B2.1? ❑ Yes ❑ No Welding Do you certify that the welding was performed by welders qualified in compliance with the requirements of at least AWS B2.1? ❑ Yes El No Do you certify that the welding was carried out in compliance with a documented quality • control procedure to ensure that all discs are retrieved, that openings in piping are smooth, that slag and other welding residue are removed, and that the internal diameters of piping are not penetrated? El Yes El No Cutouts (discs) Do you certify that you have a control feature to ensure that all cutouts (discs) ❑ Yes ❑ No are retrieved? Hydraulic data Nameplate provided If no, explain nameplate ❑ Yes ❑ No Remarks Date left in service with all control valves open Name of sprinkler contractor National Automatic Sprinkler Co. 10351 Jamestown St. #100 Blaine. MN 55449 Tests witnessed by For prop= 'r, owner (signed) Title Date F. r'" ler cy act (si Title Da e itoo Additional explanations and n•• s C /4 D, 4 . • '1w/A // C-------