Loading...
HomeMy WebLinkAboutOT 1991-102 Grading - New Stillwater Area High School Construction .ir • s 922.50 /` Building $ ovate Surcharge $ n/a CITY OF OAK PARK HEIGHTS Plan Check $ 282.00 Investigation Fee $ 14168 57th Street North City Utility $ P.O. Box 2007 External Plumbing $ r k Oak Park Heights, MN 55082 -2007 Metro S.A.C. $ (612) 439 -4439 Utility Connection $ A MINNESOTA STAR CITY - Parks Charge $ 1204.50 Total Amount Due $ (Make Checks Payable to: City of Oak Park Heights) PERMIT NO. OT -91 -102 Permit Issued For Grading Permit Use Zone PERMISSION IS HEREBY GRANTED Owner Independent School Dist. #834 Address 1875 So. Greeley Stillwater.HN. Contractor Ames Construction.Inc. Address 14420 County Rd. 5 Burnsville,MN. To carry out the work specified in this permit on the following described property, upon the express condition that said persons and their agents, employees and workmen, in such work done, shall conform in all respects to the provisions of the Building Code. This permit may be revoked at any time upon the violation of any of the provisions of said code. JOB ADDRESS CLASS OF WORK NUMBER STREET NEW ADD SIGN ALTER REPAIR MOVE DEMOLISH State Hwy #5 x FRONT or AREA OF WIDTH SIDE or LENGTH HEIGHT NO. OF LOT TYPE OF OCCUPANCY MAX. OCC. VALUATION IN FEET IN FEET IN FEET STORIES OCCUPIED CONST. LOAD PROPERTY DESCRIPTION: DIRECTION 4 AUTHORIZED WORK /SPECIAL CONDITIONS: See attached Exibit "A" NUMBER OF FIXTURES: ISSUED THIS 15 DAY OF October 19 91 *PERM T R N E: BUILDING OFFICIAL /AUTHORIZED AGENT A CERTIFICATE OF OCCUPANCY MUST BE REQUESTED AND ISSUED PRIOR TO USE OR OCCUPANCY. 'THIS PERMIT SHALL EXPIRE AND BE NULL AND VOID OF THE WORK SITE PLAN AUTHORIZED BY THE BUILDING PERMIT IS NOT COMMENCED WITHIN 60 DAYS OF THE DATE OF ISSUANCE OR IF WORK IS ABANDONED OR SUSPENDED FOR A PERIOD OF 120 DAYS. TERM OF THE PERMIT IS 12 MONTHS FROM DATE OF ISSUE. WHITE — APPLICANT CANARY — MUNICIPALITY PENALY FOR VIOLATION OF ANY OF THE PROVISIONS OF BUILDING CODE: FINE NOT TO PINK — ASSESSOR EXCEED FIVE HUNDRED DOLLARS ($500.00) OR IMPRISONMENT FOR NOT MORE THAN MANILA — BUILDING OFFICIAL FILE NINETY (90) DAYS, OR BOTH. L