HomeMy WebLinkAboutOT 1996-00206 Fireplace 44 .. - _ K:, -�' -', :.,c,...: .S' .4 ...,..:;<. . .-4' . 1 N :.;iu< . _ .' x
(I )
CULOING
CITY PLUMBING
CITY OF OAK PARK HEIGHTS CITY MECHANICAL
PLAN REVIEW FEE
14168 57th Street North . 50
STATE SURCHARGE
P.O. Box 2007
SIGN FERIAE!'
Oak Park Heights, MN 55082 -2007
(612) 439 -4439
CITY UTILITY (METER)
UTILITY CONNECTION FEE
UTILITY INSPECTION FEE
PERMIT NO. OT - 96 - 00206 METROS.A.C.
Use Zone
INVESTIGATION FEE
Permit lssuedFor FIREPLACE INSTALLATION PARKS CHARGE
OTHER 25 .00
PERMISSION IS HEREBY GRANTED TOTAL 25. 50
Owner RIVER CITY CONTRACTING Contractor FIRESIDE CORNER INC
1940 S GREELEY ST 2700 N FAIRVIEW AVE
STILLWATER MN 55082 ROSEVILLE MN 55113
439 -7762 633 -1042
To carry out the work specified on the following described property, upon the express condition that said persons and their agents, employees
and workmen, in such work done, shall conform in all respects to the provisions of the Building Code. This permit may be revoked at any time upon
the violation of the provisions of said code.
JOB ADDRESS CLASS OF WORK
NUMBER STREET NEW ADO SIGN ALTER REPAIR MOVE DEMOUSH
13891 56TH ST N X I
FRONT at SIDE or LENGTH HEIGHT NO. OF AREA OF
WIDTH TYPE OF MAX OCC.
IN FEET IN FEET STORIES LOT CONST. OCCUPANCY LOAD VALUATION
E
IN FEET I I CCCUPIED
V — N R -3
PROPERTY DESCRIPTION: LOT BLOCK
AUTHORIZED WORK/SPECIAL CONDITIONS:
INSTALL PER MANUFACTURER'S SPECIFICATIONS. WORK MUST COMPLY WITH MN STATE
BUILDING CODE AND LOCAL ORDINANCE REQUIREMENTS.
ISSUEDATE: 3/27/96 EXPIRATION DATE: 3/27/97
The a»vlicant hereby agrees to do all work in accordance with the Ordinances of the Local Municipality, State Building Code and the
requirements enforced by the City of Oak Park Heights` Building Department. I further agree to notify the Building Official of each of
the required inspections 24 hours in advance as noted on Inspection Record Card.
A CERTIFICATE OF OCCUPANCY MUST BE REQUESTED AND ISSUED PRIOR TO USE OR OCCUPANCY. THIS PERMIT SHALL EXPIRE AND BE NULL AND VOID OF THE
WOR ORIZED BY '- ILDING PERMIT IS NOT COMMENCED WITHIN 60 DAYS OF THE DATE OF ISSUANCE OR IF WORK IS ABANDONED OR SUSPENDED FOR
A PERIOD F 120 • S. T ' OF T RMIT IS 12 MONTHS FROM DATE OF ISSUE
P
BUILDING OFFICIAUAUT RIZWAGENi Owner or Contractor
/ PENALTY FOR VIOLATION OF ANY OF THE PROVISIONS OF BUILDING CODE. FINE NOT TO EXCEED FIVE HUNDRED DOLLARS (S500.00) OR IMPRISONMENT FOR NOT
MORE THAN NINETY (90) DAYS, OR BOTH.