HomeMy WebLinkAboutBP 1999-00717 Basement Finish —. CIS L DING 111.25
CITY PLUMBING
CITY OF OAK PARK HEIGHTS CITY MECHANICAL
PLAN REVIEW Fr=
14168 57th Street North 2.50
STATE SURCHARGE
P.O. Box 2007
Oak Park Heights, MN 55082-2007 SIGN PERMIT
(612) 439 -4439 CITY UTILITY NET
UTILITY CONNECTION FEE
UTILITY INSPECTION FEE
PERMIT NO. BP -99 -00717 Use Zone R1 METROS.A.C.
INVESTIGATION FEE
Permit Issued For FINISH BASEMENT PARKS CHARGE
OTHER
PERMISSION IS HEREBY GRANTED TOTAL 113.75
Owner CHRIS DIEDERICH Contractor
13910 56TH ST N
OAK PARK HEIGHTS MN 55082
351 -9301 00 -0000
To carry out the work specified on the following described property, upon the express condition that said persons and their agents, employees
and workmen, in such work done, shall conform in all respects to the provisions of the Building Code. This permit may be revoked at any time upon
the violation of the provisions of said code.
JOB ADDRESS I CLASS OF WORK
NUMBER STREET NEW ADD SIGN ALTER REPAIR MOVE DEMOLISH
13910 56TH ST N X f f I( I
•
FRONT or AREA OF f I
WIDTH SIOE or LENGTH HEGH i NO. OF LOT TYPE OF MAX. CCC.
IN FF_T IN FEET STORIES CCNST OCCUPANCY LOAD VALUATION
IN FEE: OCCUPIED
V —N R -3 5,000
PROPERTY DESCRIPTION: LOT BLOCK
AUTHORIZED WORK/SPECIAL CONDITIONS:
CONSTRUCT PER APPROVED PLAN. WORK SHALL COMPLY WITH MN STATE BUILDING CODE
AND LOCAL ORDINANCE REQUIREMENTS. SMOKE DETECTORS MUST BE PLACE PER
MN STATE UBC REQUIREMENTS. HANDOUT GIVEN TO OWNER AT TIME OF PERMIT
APPLICATION TAKEN BY BUILDING OFFICIAL.
ISSUE DATE:
1/13/99 EXPIRATION DATE: 1/14/00
The avolicant hereby agrees to do all work in accordance with the Ordinances of the Local Municipality, State Building Code and the
requirements enforced by the City of Oak Park Heights Buildinrt Department I further agree to notify the Building Official of each of
the required inspections 24 hours in advance as noted on Inspection Record Card
A CERTIFICATE OF OCCUPANCY MUST BE REQUESTED AND ISSUED PRIOR TO USE OR OCCUPANCY. 'THIS PERMIT SHALL EXPIRE AND BE NULL AND VOID OF THE
WORK AUTHORIZED BY THE BUILDING PERMIT IS NOT COMMENCED WITHIN 60 DAYS OF THE DATE OF ISSUANCE OR IF WORK IS ABANDONED OR SUSPENDED FOR
A PERIOD OF 120 DAYS. TERM OF THE PERMIT IS 12 MONTHS FROM DATE OF ISSUE
91 r:1/1 Iff
au... ofn. AU UTH RIZEo AGENT Owner or Contractor
PENALTY FOR VIOLATION OF ANY OF THE PROVISIONS OF BUILDING CODE. FINE NOT TO EXCEED FIVE HUNDRED DOLLARS f6.!CC CO) OR IMPRISONMENT FOR NOT
MORE THAN NINETY (9C) DAYS, OR 20TH.