HomeMy WebLinkAboutBP 1995-00798 Reside p ;, yx , .,;.: xiY v.....: ..: - ;'j," ,.. t , . : N' � .r, •^f±' .',; UISPR .yt., iYT; " ,rmok rr.N
c. JUILOING 1 1 2 . 2
CITY PLUMBING
CITY OF OAK PARK HEIGHTS CITY MECHANICAL
PLAN REVIEW FEE
14168 57th Street � 2.8
North STATE
P.O. Box 2007
SIGN PERMIT
Oak Park Heights, MN 55082 -2007
CITY UTILITY (METER)
(612) 439 -4439
UTLITY CONNECTION FEE
UTLITY INSPECTION FE,:
BP -95 -00798 R -1 METRO S.A.C.
PERMIT NO. Use Zone INVESTIGATION FEE
Permit Issued For RE S I DE PARKS CHARGE
OTHER
PERMISSION IS HEREBY GRANTED TOTAL 1 1 5. 1 0
Owner JAMES BROCHMAN Contractor PANELCRAFT OF MN I NC
14299 56TH ST N 3118 SNELLING AVE S
OAK PARK HEIGHTS MN 55082 MPLS MN 55406
439 -9740 721 -8880
To carry out the work specified on the following described property, upon the express condition that said persons and their agents, employees
and workmen, in such work done, shall conform in all respects to the provisions of the Building Code. This permit may be revoked at anytime upon
the violation of the provisions of said code.
JOB ADDRESS CLASS OF WORK
NUMBER STREET NEW ADO SIGN ALTER REPAIR MOVE DEMOLISH
14299 56TH ST N X I I
FRONT or AREA OF
SIDE or LENGTH HEIGHT NO. TYPE OF I MAX OCC.
WIDTH I ( IN FEET STORIES I
LOT OCCUPANCY VALUATION
IN N FEET IN FEET T OCCUPIES CONST. LOAD
V — N R -3 5,700
PROPERTY DESCRIPTION: LOT BLOCK
AUTHORIZED WORK/SPECIAL CONDITIONS:
INSTALL PER MANUFACTURER'S SPECIFICATIONS AND MUST MEET ALL MN STATE BUILD-
ING CODE REQUIREMENTS.
ISSUE DATE: 12/08/95 EXPIRATION DATE: 12/08/96
The auvlicant hereby agrees to do all work in accordance with the Ordinances of the Local Municipality, State Building Code and the
requirements enforced by the City of Oak Park Heights Building Department I further agree to notify the Building Official of each of
the required inspections 24 hours in advance as noted on Inspection Record Card.
A CERTIFICATE OF OCCUPANCY MUST BE REOUESTED AND ISSUED PRIOR TO USE OR OCCUPANCY. 'THIS PERMIT SHALL EXPIRE AND BE NULL AND VOID OF THE
WORK . I ORIZED BY THE BUILDING PERMIT IS NOT COMMENCED WITHIN 60 DAYS OF THE DATE OF ISSUANCE OR IF WORK IS ABANDONED OR SUSPENDED FOR
A.PERI0 i • F 120 OF TH - MIT IS 12 MONTHS FROM DATE OF ISSUE
BUILDING OFFICIAUA ORIZED AGENT Owner or Contractor
PENALTY FOR VIOLATION OF ANY OF THE PROVISIONS OF BUILDING CODE. FINE NOT TO EXCEED FIVE HUNDRED DOLLARS (5500.00) OR IMPRISONMENT FOR NOT
MORE THAN NINETY (90) DAYS, OR BOTH.