Loading...
HomeMy WebLinkAbout2002-01-08 BCWD Meeting Minutes ExcerptMana Leiser mentioned that the letter BCWD sent to the count about lon debt is in the pack for information purposes. Mana Kilber arrived at 6:40P.M. Rules/Permits a Settler's Glen— Phase 2 BCVVD Permit #01-14 —Mitch Johnson Mitch showed a map with an overview of the whole development. There was some discussion on g radin g issues and where the water will flow. Chuck Holtman su not issuin the permit until the stormwater modelin has been verified. Also, if an open g rassed area is bein used for erosion control the BCVVD will need a Declaration to ptotect this area. Mana Freeman su the Board thorou discuss all of their q uestions before g oin g back to the developer. Mana Freeman moved to table this permit until Mitch receives and studies the stormwater m a nd decide what ki of lan to include for erosion control, seconded b Manager_ Gordon. Motion passed - 510 b River Valle Endodontics Clinic — BCVvrD Permit #01-15 — Mitch Johnson This development is shown b map in its as-built phase. The development meets watershed rules at this time. If an future construction is added, it will probabl not meet the rules as the are now applied. Therefore, the issued permit is conditional on the present buildin and impervious surface area as shown on the plans. Mitch recommended g oin g forward with the permit. Mana Leiser asked Chuck Holtman to write an a dditional sentence for the permit to ur, cover expansion issues. The lan recoGnmended is as follows: en a s, y i,: ra s e zire,�irev : 10... _W, .. .t TV OU ." o w- ev- e, - r R W, P p 6`�',`B CWD. .6 t T L. . .......... 7 -PD W a a M-6. Ibt` ie B 2, an a" t CX_7 �T�:7 This lan will be added to the draft permit. Ma= rave Manager Gordon moved to aD P"q Z:� the amended permit, seconded b Mana Freeman. Permit approved as amended. - 510. c Permit Review - Update Mitch stated that Settlers Glen has some activit ver little activit on other permitted projects. Oak Park Station - the BCwD approved the plans. The permit will be issued when fees and sureties are delivered. Mana Freeman stated that the owner of the pro should resolve ownership and usa permission relative to the pond issue before an work is done. Mark su writin a letter to the applicant and en statin that the need to work this out with the pond owner. The BCWD so directed. Will Zintl, owner of the pond, shown in the plan It) is interested in di the pond deeper so that it can handle all the runoff from the Kern Center. If the Oak Park Station owner constructs into the pond without prior permission he will be in violation of his permit because he does not own the pond propert Watershed Mana Plan -- Implementation Activities a H and H Stud Update Mark Doneux stated that this stud is partl in response to Lee Miller's recommendations for resolvin hi water conditions on Lon Lake. Camilla and Cecilio put to a work plan, scope and bud for this stud with three phases: 1) Lon Lake, 2) TSMP and Sunn Lake, and 3) THPP and Kismet Basin Projects. The work would be carried out over a I -V2 y ear Januar 28, 2002 Re Meetin Minutes of the BCWD Board of Mana Pa 2 of