HomeMy WebLinkAbout2008-08-26 CC Resolution #08-03-34A RESOLUTION ESTABLISHING FINDINGS OF FACT AND
RESOLUTION OF THE CITY COUNCIL THAT THE
REQUEST BY TIM NOLDE, REPRESENTING ANCHOBAYPRO INC.
FOR A PUD CONCEPT PLAN APPROVAL FOR TWO SENIOR
COOPEINI' ',�dNTAL BUILDINGS REFERRED TO AS THE
C,`ARSJ AA Y a LOU -SE COOPERATIVE THAT WOULD BE
CONSTRUCTED Ili TWO PHASES AND LOCATED NEAR THE
INTERSECTION OF 58 STREET NORTH AND OAKGREEN AVENUE
BE APPROVED WITH CONDITIONS
WHEREAS, the City of Oak Park Heights has received a request from Tim
Nolde, representing Anchobaypro Inc. for a PUD Concept Plan approval for two senior
cooperative rental buildings referred to as the Carriage House Cooperative that would be
constructed in two phases and located near the intersection of 58 Street North and Oakgreen
Avenue; and after having conducted a public hearing relative thereto, the Planning Commission
of Oak Park Heights recommended that the application be approved with conditions. The City
Council of the City of Oak Park Heights makes the following findings of fact and resolution:
1. The real property affected by said application is legally described as
SEE ATTACHMENT A
2. The applicant has submitted an application and supporting
documentation to the Community Development Department consisting of the following items:
follows, to wit:
and
and
RESOLUTION NO. 0 8- 0 8 3 4
OF THE
CITY COUNCIL
CITY OF OAK PARK HEIGHTS
WASHINGTON COUNTY, MINNESOTA
SEE ATTACHMENT B
3. The subject property is zoned B -4, Limited Business District which allows
for residential development as a conditional use. The Oakgreen Village development approvals
to date have been for a planned unit development; and
4. The City Council, at their April 11, 2006 meeting, approved the concept
plan with conditions for Phase 1 and 2 of the Oakgreen Village development; and
5. The subject area includes portions of Phase 2 of the Oakgreen Village
development area.
6. City stab prepared a planning report dated August 7, 2008 reviewing the
request for the PUD Concept Plan approval; and
7. The August 7, 2008 planning report recommended approval of the
Concept Plan subject to the fulfillment of conditions; and
8. The Planning Commission held a public hearing at their August 14, 2008
meeting, took comments from the applicants and public, closed the public hearing, and
recommended that the application be approved with conditions.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL FOR
THE CITY OF OAK PARK HEIGHTS THAT THE CITY COUNCIL APPROVES THE
FOLLOWING:
A. The application submitted by Tim Nolde, representing Anchobaypro Inc. for a PUD
Concept Plan approval for two senior cooperative rental buildings referred to as the Carriage
House Cooperative that would be constructed in two phases and located near the intersection of
58 Street North and Oakgreen Avenue and affecting the real property as follows:
SEE ATTACHMENT A
Be and the same as hereby approved the City Council of the City of Oak Park Heights with the
following conditions:
1. R -3 District standards for density, and building height are complied with for this project.
2. The plat shall dedicate right-of-way for Oakgreen Avenue and shall be approved by the
City Engineer and City Attorney.
3. The City Council should discuss the need for and the timing of improvements to
Oakgreen Avenue as part of the discussions of the concept plan.
4. The Fire Marshal and Police Chief should review the plans and determine the
accessibility of emergency vehicles throughout the development.
5. The Planning Commission and Park Commission should comment on the proposed
private and public trail system. The general plan submittals shall address the location of
trails and their maintenance
6. All perimeter units must maintain a 30 foot setback to 58 Street and shall not have less
than a 20 foot setback to Oakgreen Avenue. The City Council recommends that the
setback from Oakgreen be closer to 30 feet.
7. Detailed tree inventory, tree preservation, and landscape plans shall be provided for
general plan of development.
2
8. Detailed grading, drainage and utility plans shall be provided for general plan of
development review.
9. Detailed architectural plans for the proposed buildings in the project shall be required for
general plan of development review.
10. The Planning Commission was favorable to the architectural appearance of the proposed
structures. The City Council shall comment as part of the Concept Plan review.
11. The City Engineer shall comment on the vehicle count and traffic information.
12. An alternative parking design be provided for the front entrance of the Phase 1 Carriage
House building.
13. The City Council shall comment on building placement of the Carriage House
Cooperative buildings.
14. The applicant shall provide a redesign of the lower level parking area to meet all drive
aisle and disability parking requirements.
15. The applicant has submitted a request for Tax Incremental Financing (TIF) assistance to
benefit the ultimate development of the submitted plan. Any approval of the Concept
Plan does not approve or imply that the City will provide any financial assistance through
the use of TIF or in any other method. The City will be reviewing the TIF request over
the next sixty days and will make a determination regarding such application independent
of the Concept Plan review andlor subsequent approvals.
Approved by the City Council of the City of Oak Park Heights this 26th d ugust
2008.
A.' ES
son, City Administrator
David Beaudet, Mayor
3
ATTACHMENT A
Planned Unit Development (PUD): General Concept Plan
Carriage House cooperative
Washington County GEO code: O5 029.2O XX --XXX
Legal Description: Lot 1 & 2, Block 1,
Carriage House Cooperative of the St. Croix Valley
Page 66of86
ATTACHMENT B
Planned Unit Development (PUD): General Concept Plan
Carriage House Cooperative
Application Materials
• Application Form
• Fees
• Plan Sets (3 Large Scale Sets /20'1 1X17 Sets)
• Written Narrative and Graphic Materials Explaining Proposal
• Mailin g List from Washington County (500' from subject property)
• Proof of Ownership or Authorization to Proceed
• Property Tax Statement(s) /Legal Description(s)
Conference With City Staff Upon Application submittals July 30, 2008
pp
Required Approvals:
PUD; General conee t
q
Planning Commission 4/5
0
city council 4/5
PUD: General concept -- Effect of Concept Plan Approval:
Unless the applicant shall fail to meet time schedules for filing General Plan of
� lip meat in
Development Stage and/or Final Plans or shall fail to proceed with develop
p g
accordance with the plans as approved or shall in any other mann er fail to comply p Y with
any c
andition of Ordinance 401 or any approval granted pursuant to it, a General
Concept Plan which has been approved and a PUD Agreement signed by the applicant
lip
sha
shall not be modified, revoked or otherwise impaired pending the application for
approval
of the General Plan of Development Stage and Final Plans by any action of
the City g of Oak Park Heights without consent of the applicant. (401 .05C.2d)
PUS: general conce t - Limitation on General Concept Plan Approval:
Unless a General Plan of Development covering the area designated as in the General
Concept Plan as the first stage of the PUD has been filed within twelve (12) months
g
fromthed grants Council rants General Concept Plan approval, or in any case where the
applicant fails to file General Plan of Development Stage and Final Hans and to
with development in accordance with the provisions of this Ordinance and of an
proceed p
approved General Concept Plan, the approval may be revoked by Council action.
(401 .06.C.2.e)
Page 87 of 86