HomeMy WebLinkAbout08-14-08 PC Recommending ResolutionA RESOLUTION ESTABLISHING FINDINGS OF FACT AND
RECOMMENDING TO THE CITY COUNCIL THAT THE
REQUEST BY TIM NOLDE REPRESENTING ANCHOBAYPRO, INC.
FOR A PLANNED UNIT DEVELOPMENT FOR PHASE 1 OF THE
OAKGREEN VILLAGE DEVELOPMENT WEST OF OAKGREEN
AVENUE AND NORTH OF 58 STREET TO CHANGE THE NUMBER
OF DWELLING UNITS AND SITS PLAN SHOULD BE APPROVED WITH
CONDITIONS
WHEREAS, the City of Oak Park Heights has received a request from Tim
Nolde representing Anchobaypro Inc. for a Planned Unit Development for Phase 1 of the
Oakgreen Village development west of Oakgreen Avenue and north of 58 Street to change the
number of dwelling units and site plan; and after having conducted a public hearing relative
thereto, the Planning Commission of Oak Park Heights makes the following findings of fact:
1. The real property affected by said application is legally described as
follows, to wit:
SEE ATTACHMENT A
2. The applicant has submitted an application and supporting
documentation to the Community Development Department consisting of the following items:
and
and
A RECOMMENDING RESOLUTION
OF THE
PLANNING COMMISSION
CITY OF OAK PARK HEIGHTS
WASHINGTON COUNTY, MINNESOTA
SEE ATTACHMENT B
3. The subject property is zoned B -4, Limited Business District which allows
for residential development as a conditional use. The Oakgreen Village development approvals
to date have been planned for a planned unit development; and
4. The City Council, at their April 11, 2006 meeting, approved the concept
plan with conditions for Phase 1 and 2 of the Oakgreen Village development; and
5. The City Council, at their May 23, 2006 meeting, approved the general
plan of development with conditions for Phase 1 of the Oakgreen Village development; and
6. The subject area is directly north of the ponding area and was approved
for 15 attached townhome sites in three buildings. The applicant now proposes one three unit
building and two two unit buildings; and
7. City staff prepared a planning report dated August 6, 2008 reviewing the
request for a planned unit development for Phase 1; and
8. The August 6, 2008 planning report recommended approval of the planned
unit development amendment subject to the fulfillment of conditions; and
9. The Planning Commission held a public hearing at their August 14, 2008
meeting, took comments from the applicants and public, closed the public hearing, and made the
following recommendation:
NOW, THEREFORE, BE IT RESOLVED BY THE PLANNING
COMMISSION FOR THE CITY OF OAK PARK HEIGHTS THAT THE PLANNING
COMMISSION RECOMMENDS THE FOLLOWING:
A. The application submitted by Tim Nolde representing Anchobaypro Inc. for a Planned
Unit Development for Phase 1 of the Oakgreen Village development west of Oakgreen Avenue
and north of 58 Street to change the number of dwelling units and site plan and affecting the
real property as follows:
SEE ATTACHMENT A
Be and the same as hereby recommended to the City Council of the City of Oak Park Heights for
approval with the following conditions:
1. The preliminary /final plat for Oakgreen Ponds is subject to review and approval by the
City Engineer and City Attorney.
2. All easements, as required by the City Engineer and City Attorney, shall be dedicated to
the City as part of the subdivision approvals.
3. Sidewalks /trails and timing for construction are subject to review and approval by the
Parks Commission, Cit y Council, and City Engineer. The trail and crosswalk at 5 8th
Street and Oakgreen Avenue shall cross 58 Street to the south.
4. The tree preservation and landscape plans are subject to review and approval of the City
Arborist.
5. Grading, drainage, erosion control, and utility plans are subject to review and approval by
the City Engineer. Stormwater plans are also subject to review and approval by the
applicable watershed authority.
6. The buildings shall comply with the requirement for a 20 foot setback from the private
street. The site plan shall be revised subject to City Council approval.
7. The site plan does not include light fixtures on buildings. If lights are proposed on the
buildings, they must be illustrated on the building plans, details submitted, and the
photometric plan must be revised to include them subject to City staff review and
approval.
2
8. The Planning Commission is favorable to the building design with the stipulations that
the dormers on the front elevations be increased in size, shake siding be used on the
gables of the front and rear elevations and the gable ends of the rear elevation be
provided a vertical element from the roof eve to the foundation. The City Council should
review and approve the final design and materials for the townhome structures.
9. The Fire Marshal and Police Chief should review the plans and determine the
accessibility of emergency vehicles throughout the development.
10. The applicant shall supply the homeowners association documents as required by the City
Attorney for review and approval.
11. The applicant shall provide all association duties and maintenance until the completion of
Phase 1. The homeowners association shall be organized with a funded reserve provided
by the developer. The details of the reserve amount shall be outlined in the development
agreement.
12. The applicant shall be required to disclose the entire development plans to include the
Carriage House Cooperative for all Phase 1 buyers. Disclosure is also required for
modification of all buyers within the development that the roadway and wetlands are to
be private and will not be accepted as public in the future by the City.
13. The applicant is required to enter into an amended development agreement with the City
in a form acceptable to the City, and subject to review and approval of the City Attorney.
Recommended by the Planning Commission of the City of Oak Park Heights this 14th
day of August 2008.
ATT ST:
Eric ■ J s son, City Administrator
3
Michael Liljegren, Chair
ATTACHMENT A
Planned Unit Development Amendment
oakgreen Village --- Oak Park Ponds
Legally described as:
Lots 1 & 2, Block 1, Oak Park Ponds
Lots 1 — 3, Block 2, Oak Park Ponds
Lots 1 & 2, Block 3, Oak Park Ponds
Multiple Washington County GEO Codes:
Within NE 1 /4 of Section 5, Township 29, Range 20
ATTACHMENT B
Planned Unit Development (PUD) Amendment
Oakgreen Village — Oak Park Ponds
Application Materials
• Application Form
• Fees
• Plan Sets (3 Large Scale Sets /20 11X17 Sets)
• Written Narrative and Graphic Materials Explaining Proposal
• Mailing List from Washington County (500' from subject property)
• Proof of Ownership or Authorization to Proceed
• Property Tax Statement(s)/Legal Description(s)
Conference With City Staff Upon Application Submittal: July 30, 2008
Required Approvals: PUD Amendment
City Council 4/5
PUD Amendment - Limitation on General Concept Plan Approval:
Unless a General Plan of Development covering the area designated as in the General
Concept Plan as the first stage of the PUD has been filed within twelve (12) months
from the date Council grants General Concept Plan approval, or in any case where the
applicant fails to file General Plan of Development Stage and Final Plans and to
proceed with development in accordance with the provisions of this Ordinance and of an
approved General Concept Plan, the approval may be revoked by Council action.
(401 .06.C.2.e)