HomeMy WebLinkAboutBP 1991-255 Basement Waterproofing. V, .F-"," r.7 . , .'fIF..lcit 4 w4wp r n r r• .
,-\ r. City Building $ 37.00
State Surcharge $ .OU
-. CITY O OAK PARK HEIGHTS Plan Check $
2 Investigation Fee $
14168 57th Street North
r , _ city utility $
� P.O. Box 2007 External Plumbing $
'� Oak Park Heights, MN 55082 -2007 Metro S.A.C. $
(612) 439 -4439 Utility Connection $
A MINNESOTA STAR CITY Parks Charge $
Total Amount Due $ 37.80
BP -91 -255 (Make Checks Payable to: City of Oak Park Heights)
PERMIT NO
i
Permit Issued For BASEMENT WATERPROOFING Use Zone R-2
PERMISSION IS HEREBY GRANTED
Owner CHRIS JOHNSON Address 14521 UPPER 56TH ST N
Contractor ' BUDGET CONSTRUTION CO. Address 1299 ARCADE ST ST.PAUL,MN 55106
To carry out the work specified in this permit on the following described property, upon the express condition that said persons and their agents,
employees and workmen, in such work done, shall conform in all respects to the provisions of the Building Code. This permit may be revoked at any
time upon the violation of any of the provisions of said code.
JOB ADDRESS CLASS OF WORK
NUMBER STREET NEW ADD SIGN ALTER REPAIR MOVE DEMOLISH
14521 66TH ST N, UPPER %
,. FRONT or AREA OF
WIDTH SIDE or LENGTH HEIGHT NO. OF LOT TYPE OF OCCUPANCY MAX. OCC. VALUATION
IN FEET IN FEET IN FEET STORIES OCCUPIED CONST. LOAD
1600.00
PROPERTY DESCRIPTION:
DIRECTION •
AUTHORIZED WORK /SPECIAL CONDITIONS:
INSTALL DRAINTILE.
- --- --► t---- .
NUMBER OF FIXTURES:
ISSUED THIS 29 DAY OF JULY 19 91
*PER 1 Ti �TE:
BUILDING OFFICIAL /AUTHORIZED AGENT
A CERTIFICATE OF OCCUPANCY MUST BE REQUESTED AND ISSUED PRIOR TO USE OR
OCCUPANCY. 'THIS PERMIT SHALL EXPIRE AND BE NULL AND VOID OF THE WORK
SITE PLAN AUTHORIZED BY THE BUILDING PERMIT IS NOT COMMENCED WITHIN 60 DAYS OF THE
DATE OF ISSUANCE OR IF WORK IS ABANDONED OR SUSPENDED FOR A PERIOD OF 120
DAYS. TERM OF THE PERMIT IS 12 MONTHS FROM DATE OF ISSUE.
WHITE — APPLICANT
CANARY — MUNICIPALITY PENALY FOR VIOLATION OF ANY OF THE PROVISIONS OF BUILDING CODE: FINE NOT TO
PINK — ASSESSOR EXCEED FIVE HUNDRED DOLLARS ($500.00) OR IMPRISONMENT FOR NOT MORE THAN
MANILA — BUILDING OFFICIAL FILE NINETY (90) DAYS, OR BOTH.