Loading...
HomeMy WebLinkAboutME 2005-00212 Cooling Tower Replacement & New Piping �ITY OF OAK PARK HEIGH. PERMIT NO.: 2005 -00212 14168 OAK PARK BLVD. N. #2007 OAK PARK HEIGHTS, MN 55082 -2007 DATE ISSUED: 09/08/2005 (651) 351 -1661 FAX: (651) 439 -0574 ADDRESS : 5329 OSGOOD AVE N PIN : 05- 029 -20-41 -0003 LEGAL DESC : N/A : LOT 0 BLOCK 0 PERMIT TYPE : MECHANICAL PROPERTY TYPE : INSTITUTIONAL CONSTRUCTION TYPE : NEW CONSTRUCTION NOTE: CONSTRUCT PER APPROVED PLANS. MUST COMPLY WITH ALL MN STATE BUILDING AND MECHANICAL CODE REQUIREMENTS. PERMIT ISSUED FOR REPLACEMENT OF COOLING TOWER AND INSTALLATION OF NEW PIPING TO TOWER'S NEW LOCATION. VALUE OF MECHANICAL 196300 APPLICANT MECHANICAL COMMERCIAL 1,963.00 MECHANICAL SURCHARGE - COMMERCIAL 0.50 NEW MECH COMPANIES TOTAL 1,963.50 1633 EUSTIS ST. ST. PAUL, MN 55108 -1288 PAID WITH CHECK # 164353 (651)645 -0451 OWNER STATE OF MN DEPT OF CORRECTIONS 1450 ENERGY PARK DRIVE STE 200 ST. PAUL, MN 55082 AGREEMENT AND SWORN STATEMENT The work for which this permit is issued shall be performed according to: (1) the conditions of this permit; (2) the approval plans and specifications; (3) the applicable city approvals, Ordinances, and Codes; and, (4) the State Building Code. This permit is for only the work described, and does not grant permission for additional or related work which requires separate permits. This permit will expire and become null and void if work is not started within 180 days, or if work is suspended or abandoned for a period of 180 days any time after work has commenced. The applicant is responsible for assuring all required inspections are requested in conformance with the Minnesota State Building Code. SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE. 1633 Eu, s Street Saint Paul, Minnesota 55108 -1219 ,T . N.,....th iv& COMPANIES. INC. 651/645/0451 REPORT OF P,9,(m CG SYSTEM PRESSURE TEST & /OR INSPECTION, STERILIZPTI" CL ANINGSTEFS�ING 4 O5 -J19-- ' Coe -fit- Date: 1 / q ?/ 05— oad Qv e . V. y 5 3 059o/ 3 .0 ! / Job Name 0/4 K ?4 /-16; ,.j 6; / // ! S ?/1s 0 b No. 3 2_ d G This report documents the results of system pressure test / inspection / steriliza- tion / cleaning and flushing of Plumbing / Heating & Cooling / Fire Sprinkler & Standpipe / Ventilation System at the above referenced project and i for a partial / complete system. DESCRIPTION OF SYSTEM lincludina boundary limits for partial oaeartion): 4 / / / _ I ■ - .sue �►_ J/ , Start Time: i 7i /9top Time: / r� 2 �/�? t �') Duration of Operation: Y 44 --' FOR TESTING: Pressure G Start Pressure G End Test Medium Actual: Required: -- i FOR STERILIZING. CLEANING &IJId3 : Chemicals 1 Observati• during oper , -• 4 ■ / _ l •YAM -I• / FOR INSPECTION: Inspection is for ( .�►.r•�)� � ""'�'_.•� l 4010 GENERAL REMARKS: _ ( 4 A 4. 7 OPERATION PERFORMED BY: - " . , / -.mum. of NewMech Companies Inc. Ne.dl ch's Trade Supervisor: _ WITNESSED BY: Code Enforcement Official: i -1. s7.4 ` r j f Owner's Representative: . -= s. 40.. 0 -