HomeMy WebLinkAboutME 2005-00212 Cooling Tower Replacement & New Piping �ITY OF OAK PARK HEIGH. PERMIT NO.: 2005 -00212
14168 OAK PARK BLVD. N. #2007
OAK PARK HEIGHTS, MN 55082 -2007 DATE ISSUED: 09/08/2005
(651) 351 -1661 FAX: (651) 439 -0574
ADDRESS : 5329 OSGOOD AVE N
PIN : 05- 029 -20-41 -0003
LEGAL DESC : N/A
: LOT 0 BLOCK 0
PERMIT TYPE : MECHANICAL
PROPERTY TYPE : INSTITUTIONAL
CONSTRUCTION TYPE : NEW CONSTRUCTION
NOTE: CONSTRUCT PER APPROVED PLANS. MUST COMPLY WITH ALL MN STATE BUILDING AND MECHANICAL
CODE REQUIREMENTS. PERMIT ISSUED FOR REPLACEMENT OF COOLING TOWER AND INSTALLATION OF NEW
PIPING TO TOWER'S NEW LOCATION.
VALUE OF MECHANICAL 196300
APPLICANT MECHANICAL COMMERCIAL 1,963.00
MECHANICAL SURCHARGE - COMMERCIAL 0.50
NEW MECH COMPANIES TOTAL 1,963.50
1633 EUSTIS ST.
ST. PAUL, MN 55108 -1288 PAID WITH CHECK # 164353
(651)645 -0451
OWNER
STATE OF MN DEPT OF CORRECTIONS
1450 ENERGY PARK DRIVE
STE 200
ST. PAUL, MN 55082
AGREEMENT AND SWORN STATEMENT
The work for which this permit is issued shall be performed
according to: (1) the conditions of this permit; (2) the
approval plans and specifications; (3) the applicable city
approvals, Ordinances, and Codes; and, (4) the State Building
Code. This permit is for only the work described, and does
not grant permission for additional or related work which
requires separate permits. This permit will expire and become
null and void if work is not started within 180 days, or if work
is suspended or abandoned for a period of 180 days any time
after work has commenced. The applicant is responsible for
assuring all required inspections are requested in conformance
with the Minnesota State Building Code.
SEPARATE PERMITS REQUIRED FOR WORK OTHER THAN DESCRIBED ABOVE.
1633 Eu, s Street
Saint Paul, Minnesota 55108 -1219
,T . N.,....th
iv&
COMPANIES. INC. 651/645/0451
REPORT OF P,9,(m CG
SYSTEM PRESSURE TEST & /OR INSPECTION,
STERILIZPTI" CL ANINGSTEFS�ING 4 O5 -J19--
' Coe -fit-
Date: 1 / q ?/ 05— oad Qv e . V.
y 5 3 059o/ 3 .0 ! /
Job Name 0/4 K ?4 /-16; ,.j 6; / // ! S ?/1s 0 b No. 3 2_ d G
This report documents the results of system pressure test / inspection / steriliza-
tion / cleaning and flushing of Plumbing / Heating & Cooling / Fire Sprinkler &
Standpipe / Ventilation System at the above referenced project and i for a partial /
complete system.
DESCRIPTION OF SYSTEM lincludina boundary limits for partial oaeartion):
4 / /
/ _ I ■
- .sue �►_ J/
,
Start Time: i 7i /9top Time: / r� 2 �/�? t �') Duration of Operation: Y 44 --'
FOR TESTING: Pressure G Start Pressure G End Test Medium
Actual:
Required: --
i
FOR STERILIZING. CLEANING &IJId3 :
Chemicals 1
Observati• during oper , -•
4 ■
/ _ l •YAM -I• /
FOR INSPECTION: Inspection is for ( .�►.r•�)� � ""'�'_.•� l 4010
GENERAL REMARKS: _
( 4 A 4. 7
OPERATION PERFORMED BY: - " . , / -.mum. of NewMech Companies Inc.
Ne.dl ch's Trade Supervisor: _
WITNESSED BY: Code Enforcement Official: i -1. s7.4 ` r j f
Owner's Representative: . -=
s. 40.. 0 -