HomeMy WebLinkAboutBP 1999-777 Remodel 0 0 BUILDING
783.75
CITY PLUMBING .
CITY OF OAK PARK HEIGHTS CITY MECHANICAL
14168 57th Street North PLAN REVIEW FEE. 509.44
STATE SURCHARGE 35.00
P.O. Box 2007
Oak Park Heights, MN 55082 -2007 SIGN PERMIT
(612) 439 -4439 CRY UTILITY (METER)
UTILITY CONNECTION FEE
UTILITY INSPECTION FEE
PERMIT NO. BP -99 -777 Use Zone 0- Institutional METRO S.A.C.
INVESTIGATION FEE
Permit Issued For Remodel - PARKS CHARGE
OTHER
PERMISSION IS HEREBY GRANTED TOTAL 1,328.19
Owner State pof Minnesota Contractor Braden Construction
50 Sherburn St.- Admin. Bldg. 1438 7th St.
St. Paul, tIN 55155 Houlton, WI 54082
(651) 296 -2600 (715) 549 -6009
To carry out the work specified on the following described property, upon the express condition that saidpersons and their agents, employees
and workmen, in such work done, shall conform in all respects to the provisions of the Building Code. -This permit may be revoked at any time upon
the violation of the provisions of said code.
JOB ADDRESS I CLASS OF WORK
NUMBER STREET NEW ADO SIGN ALTER REPAIR MOVE DEMOLISH
le
5329 Osgood Ave. N. x
11
t FRONT or I ( AREA OF
SIOE or LENGTH HEfGHT NO. OF TYPE OF 1 MAX OCC.
WIDTH IN FEET IN FEET STORIES LOT CONST. OCCUPANCY LOAD VALUATION
IN FEET OCCUPIED
II I -3 701000.00
PROPERTY DESCRIPTION: Oak Park Heights Maximum Prison Facility
AUTHORIZED WORKISPECIAL CONDITIONS:
Work shall be completed per approved plan, according to Mn State Building code and local
ordinance requirements.
ISSUE DATE: 07 -26 -99 EXPIRATION DATE: 87 -27 -00
The arnvl cant hereby agrees to do all work in accordance with the Ordinances of the Local Municipality, State Building Code and the
requirements enforced by the City of Oak Park Heights Building Department I further agree to notify the Building Official of each of
the required inspections 24 hours in advance as noted on Inspection Record Card.
A CERTIFICATE OF OCCUPANCY MUST BE REOUESTED AND ISSUED PRIOR TO USE OR OCCUPANCY. 'THIS PERMIT SHALL EXPIRE AND BE NULL AND VOID OF THE
- WORK AUTHORIZED BY THE BUILDING PERMIT IS NOT COMMENCED WITHIN 60 DAYS OF THE DATE OF ISSUANCE OR IF WORK IS ABANDONED OR SUSPENDED FOR
A PERIOD • - DAYS. -. •,- HE 'E - IT IS 12 MONTHS FROM DATE OF ISSUE
t / •► /�
A i;
,, .
LOING OFFICIAuAuTHORIZED AGENT er or Contr for
PENALTY FOR VIOLATION OF ANY OF THE PROVISIONS OF BUILDING CODE. FINE NOT TO EXCEED FIVE HUNDRED DOLLARS ($5C0.00) OR IMPRISONMENT FOR NOT
MORE THAN NINETY (9C) DAYS, OR 30TH.