Loading...
HomeMy WebLinkAboutBP 1980-1732 New Construction - Prison Plan Checx Fee $18,670.00 6)X '4//4 �7 FEE SCHEDULE Permit No. _ CITY BLDG.. 28,723.00 CITY OF OAK PARK HEIGHTS Plan No. STATE SURCHARGE 2,000.00 (For Dept. use only) BLDG. PERMIT 4 9.393. 00 CITY UTILITY 3032.00 EXTERNAL PLBG. 16.00 APPLICATION FOR PERMIT METRO S.A.C. 76,375.00 UTILITY CONNECTION 158,600•00 Revised No. II 284,816. 19�� � yt 284,8166...000 High Se unity Facility YB,ylaenLB U N T DUE.. 231, 816 00 53,000. held in escrow STRUCTURE USED AS REFRG HANG MARK BUILD PLUMB. HEAT INSTALL � A LTER Ri PAIR REROOF RESIDE MOVE WRECK SIGN SQUARES x 7 ' ^I BY X ._. Room G-10 Administration Bldg. Owner State of ninnesota Address St. Paul, MN. 55101 Skyway Bldg. Arcade Architect Winsor/Faricy Architects, Inc. Address N. W. National Dank, St. Paul, Mn. General Contractor Knutson Construction Company Address 17 Washington Avenue North riinneapolis, Mn. 55 Contractor Reg. No. - A Qfei McGough Construction Company - Construction manager NUMBER STREET SIDE BETWEEN WHAT CROSS STREETS P. 0. Box 286 L Osgood Ave., Stillwater, zN. 55e; LOT BLOCK ADDITION OR TRACT WIDTH DEPTH SIDE LOT CLEARANCE FRONT BUILDING LINE LOT WIDTH LENGTH HEIGHT NQ OF STORIES TYPE OF CONSTRUCTION ESTIMATED VALUE STRUCTURE 454 5 Concrete /masonry $29,100,000.00 BASEMENT ❑ YES DETAILS OR REMARKS: ` 1 , N O The undersigned hereby makes application for a permit to do Building Work as herein specified, agre. . .. . al l4 � rk in stri accordance with iiir all ordinances of the City of Oak Park Heights. Contractors must register with the village before per e I , , ed. OWNER /CONTRACTOR SIGNED 1 � L` i OK'D BY _ �i / �� — ' i i . _ L