HomeMy WebLinkAboutPL 1980-1722 New Construction - Prison FEE SCHEDULE / Permit No. 1
CITY BLDG. 1288.00 CITY 0 •A PARK HEIGHTS Plan No.
/ ( STATE SURCHARGE •50 0 /ham (For Dept. use only)
BLDG. PERMIT 1288
CITY UTILITY
EXTERNAL PLBG. APPLICATION FOR PERMIT
METRO S.A.C.
UTILITY CONNECTION Date May 27 1980
TOTAL AMOUNT DUE Prison
STRUCTURE USED AS
REFRG. HANG
MARK BUILD PLUMB. HEAT INSTALL ALTER REPAIR REROOF RESIDE MOVE WRECK SIGN
SQUARES I ^I I l ^ I U
BY Owner State of Minnesot Address High Security Facility
Architect Address
General Contractor McGough Construction Co., Inc. Address
ntractor Reg. No. Plmg. Contr. •=yes ContractorA, Inc.
ors,
NUMBER STREET SIDE BETWEEN WHAT CROSS STREETS
5529 Osgood Ave. No.
LOT BLOCK ADDITION OR TRACT
WIDTH DEPTH SIDE LOT CLEARANCE FRONT BUILDING LINE
LOT
WIDTH LENGTH 1 HEIGHT NQ OF STORIES TYPE OF CONSTRUCTION ESTIMATED VALUE
STRUCTURE
BASEMENT
0 YES DETAILS OR REMARKS:
' NO 3.260 openings
The undersigned hereby makes application for a permit to do Building Work as herein specified, agreeing to do all work in strict accordance with
all ordinances of the City of Oak Park Heights. Contractors must register with the village before permit can be issued.
OWNER /CONTRACTOR SIGNED
OK'D BY