Loading...
HomeMy WebLinkAboutPL 1980-1722 New Construction - Prison FEE SCHEDULE / Permit No. 1 CITY BLDG. 1288.00 CITY 0 •A PARK HEIGHTS Plan No. / ( STATE SURCHARGE •50 0 /ham (For Dept. use only) BLDG. PERMIT 1288 CITY UTILITY EXTERNAL PLBG. APPLICATION FOR PERMIT METRO S.A.C. UTILITY CONNECTION Date May 27 1980 TOTAL AMOUNT DUE Prison STRUCTURE USED AS REFRG. HANG MARK BUILD PLUMB. HEAT INSTALL ALTER REPAIR REROOF RESIDE MOVE WRECK SIGN SQUARES I ^I I l ^ I U BY Owner State of Minnesot Address High Security Facility Architect Address General Contractor McGough Construction Co., Inc. Address ntractor Reg. No. Plmg. Contr. •=yes ContractorA, Inc. ors, NUMBER STREET SIDE BETWEEN WHAT CROSS STREETS 5529 Osgood Ave. No. LOT BLOCK ADDITION OR TRACT WIDTH DEPTH SIDE LOT CLEARANCE FRONT BUILDING LINE LOT WIDTH LENGTH 1 HEIGHT NQ OF STORIES TYPE OF CONSTRUCTION ESTIMATED VALUE STRUCTURE BASEMENT 0 YES DETAILS OR REMARKS: ' NO 3.260 openings The undersigned hereby makes application for a permit to do Building Work as herein specified, agreeing to do all work in strict accordance with all ordinances of the City of Oak Park Heights. Contractors must register with the village before permit can be issued. OWNER /CONTRACTOR SIGNED OK'D BY