Februar 14, 2003
lonestroo, Rosene. Anderlik and Associates, Inc. is an ► itive Action Opportunit Emplo
and Emplo Owned
Principals: Otto G. Bonestroo, P.E. ■ Marvin L. Sorvala, PE. ■ Glenn R. Cook, RE. ■ Robert G. Schunicht, P.E. ■
Jerr A. Bourdon, PE.
Senior Consultants: Robert W Rosene, PE. ■ Joseph C. Anderlik, RE. ■ Richard E. Turner, PE. ■ Susan M. Eberlin, C.PA.
Associate Principals: Keith A. Gordon, RE. ■ Robert R. Pfefferle, P.E. ■ Richard W.-F.oster, P.E. ■ David O. Loskota, P.E. ■
Mark A. Hanson, P.E. ■ Michael T. Rautmann, P.E. ■ Ted K. Field, RE. ■ Kenneth R AnalL, so E,._- Mark R. Rolf s, P.E. ■
David A. Bonestroo, M.B.A. ■ Sidne P Williamson, PE., L.S. A M. Rin M.B.A. I c 4zrtmW t, P.E.
P
Thomas W. Peterson, P.E. ■ James R. Maland, RE. ■ Miles B. Jensen, RE. ■ L. Phillip v R a O rton, PE. ■
. 1
Ismael Martinez, RE. ■ Thomas A. S RE. ■ Sheldon J. Johnson ■ Dale A. Grove, P E. • Th A, r
Robert J. Dever P.E. f
Offices: St. Paul, St. Cloud, Rochester and Willmar, MN ■ Milwaukee, WI ■ CWa IL
Website: www.bonestroo.com
U
Ms. Jud Holst
Actin Cit Administrator
Cit of Oak Park Hei
14168 Oak Park Blvd., P. 0. Box 2007
1 1 S J-
L L ' ?-200"
Oak 1-�ark I-' ' N' T 4 2f
Re: Oak Villa
Concept Plan Review
BRA File No. 55-03-000
Dear Jud
We have reviewed the 'Concept development plans and preliminar plat for the proposed
Oak Villa development as submitted b Folz, Freeman,' Erickson, Inc. and have the
followin comments and/or recommendations for y our consideration:
Preliminar Plat:
1. Draina and Utilit Easements should be shown for all storm water ponds and connectin
trunk ston-n sewers. OLItlOtS should not be used for these areas. All stormwater ponds and
wetlands need accessibilit for maintenance. If the proposed draina and utilit easement
locations are not also usable for access locations, separate or expanded easements will be
re
2. Draina and Utilit Easements will also be re for an sanitar sewers or water mains
that are "public" and lie outside of public street ri
3. Ston-n sewers servin internal parkin lots will be privatel owned and maintained. As such,
draina and utilit easement are not re for these items.
4. Additional ri easement is re for Novak Avenue North near the
reverse curve (at the southeast comer of the "Kohl's parcel" In addition, we recommend
the 363.55' piece of ri bein provided for Novak Avenue N. be widened to the
east to coincide with the 308.54' north-south existin parcel line.
Site L. Locations:
5. Proposed Novak Avenue North, the main north-s6uth connector road throu the site, should
be desi to include separate left and ri -turn lanes at 58 th Street North. If projected
traffic volumes in this area (dependent upon t of development) will increase traffic
si consideration ma want to be g iven to desi this as a four-lane roadwa
2335 West Hi 36 ■ St. Paul, MN 55113 x 651-636-4600 n Fax: 651-636-1311
5. The proposed easterly access to 58"' Street North has been realigned to create a distance of
approximately 300' from Oakgreen Avenue North. This distance is not quite as great as we
were recommending, but should be acceptable since 58 Street N. is a multiple lane roadway.
7. We recommend eliminating the easterly driveway access from Building No. 8 to the public
loop roadway (see enclosed sketch). Site distance problems exist for vehicles trying to exit at
this location with east /south bound vehicles on the roadway.
8. The three double driveways from Building No. 9 will create backing out hazards onto the
public loop roadway. Unless this building is redesigned /relocated with rear -entry garages,
this will be an issue the City will just have to accept.
9. omit any landscaping that will create site distance obstructions on the west side of the
westerly driveway (between Buildings A and B) onto 58"' Street North.
Grading /Drainage
10. Storm water runoff from the majority of this development will be tributary to four different
internal ponds/wetlands (two proposed storm water ponding areas & two existing storm
water ponding areas). The existing drainage pattern of the commercial /office area north of
and adjacent to 58 Street N. is to the west /southwest and is in the BCWD jurisdictional
drainage area. Drainage for a majority of this area is proposed to be redirected to the east.
As such, formal approval will be needed from both the BCwD and the MS C -WMO prior to
general plan submittal.
11. Storm sewers structures outletting to ponds/wetlands shall be constructed with sumps for
sediment and debris removal, for both public and private systems.
12. Storm water runoff and ponding calculations will be required as part of the general plan
submittal, to verify adequate pond storage capacities and ultimate offsite discharge rates.
Sanitary Sewer:
13. The commercial /office area is proposed to connect to the existing sanitary sewer stubbed
north of 58 Street N. at Norwich Avenue N. The residential area is proposed to connect to
the existing sanitary sewer north of Pondview Condominiums. We recommend that when the
residential area sanitary sewer enters proposed 59 Street N., it turn east to the Oakgreen
Avenue N. westerly easement line, then north to connect to the existing manhole on the east
side of the proposed Renton Homes development. This will result in more of a "main line"
route and avoid sending all of this development's flows through the Pondview sewer that was
basically designed as more of a service line.
14. The location of the proposed sewer in the commercial /office area, which basically acts as
services to the proposed buildings, should be privately owned and maintained. Much of the
sanitary sewer proposed to serve the townhome buildings lies within private driveways. The
issue of whether these sanitary sewers will be publicly or privately owned and maintained
needs to be determined. If publicly owned and maintained, we recommend 30 --foot wide
utility easements be dedicated to the city (since water main is adjacent to the sewers in all
these locations).
Water Main:
15. The water main layout, in general, is acceptable as one possible alternative. We may want to
consider minor realignments of the 12 trunk water main as is connects to 58 Street N. and
possibl continuin the 8" line in proposed 59'1' Street N. throu to Oak Avenue N.
The overall ali should also be reviewed with the Cit Public Works Director and will
be better defined when g eneral plans are submitted.
16. Similar to Comment 14. above, much of the water main proposed to serve the townhome
buildin lies within private drivewa The water main that is looped to other public water
main would t also be considered public, and re utilit easements dedicated to the
Cit The dead end water mains in private drivewa would need to be determined if the
are to be publicl or privatel owned and maintained, and therefore, whether or not an
easement dedicated to the Cit is needed.
Miscellaneous:
17. A detailed sediment and erosion control plan needs to be included as part of the g eneral plan
submittal, as it pertains to the g radin g and private storm sewer construction activities.
If y ou have an q uestions or re additional information,, please contact me at (651 604-4815.
Sincerel
BONESTROO, ROSENE, ANDERLIK & ASSOCIATES INC
Dennis M. Postler, P.E.
Enclosure
cc: Ja Johnson, Public Works Director
Jim Butler, Buildin Official
Scott Richards, Cit Planner
Mark Vierlin Cit Attorne
Kath Widin, Cit Arborist
Todd A. Erickson — Folz, Freeman, Erickson, Inc.
DMP, DDH, File — Bonestroo & Associates
K:\55\01d\0akc,reen Villa - Concept Plan Review 2-14-03.doc