HomeMy WebLinkAbout2003-01-09 NAC Planning ReportBACKGROUND
North of Site:
South of Site:
NORTHWEST ASSOCIATED CONSULTANTS INC.
5775 Wayzata Boulevard., Suite 555, St. Louis Park, MN 65416
Telephone: 952.595,9636 Facsimile: 952,595.9837 planner&@nacplanning.COM
PLANNING REPORT
Adjacent Uses. Uses adjacent to the subject site are listed below:
TO: Judy Hoist
FROM: Scott Richards
DATE: January 9, 2003
RE: Oak Park Heights — VSSA Oakgreen Village: PUD Concept Plan
FILE NO: 798.02 — 02.33
Application. Valley Senior Services Alliance (VSSA) and Anchobypro Inc. have made
application for a PUD concept plan approval for that area west of Oakgreen Avenue and
north of 58 Street. The subject area is 33.9 acres and encompasses a significant
portion of the Central Business District. VSSA had submitted concept plans for a
portion of this area in the Spring of 2002 but withdrew the application to concentrate on
other areas of the Boutwells Landing development. The current subject area includes
that area south of the proposed Kohl's development and the existing Wal-Mart. The
Kohl's development, which received concept plan approval in December 2002, is
proceeding and it is expected that a general plan application will be made in February
for the project.
Present Zoning — Central Business district
Present Use — Wal-Mart, Highway 36 oriented commercial
development, undeveloped areas and the Xcel Energy power line
easement. A portion of the area to the north is proposed for the
Kohl's and associated commercial development.
Present Zoning — PUD and 0, Open Space
Present Use — The Boutwells Landing development and
undeveloped areas.
West of Site:
Present Zoning — Central Business District
Present Use — Wal -Mart and Highway 36 oriented commercial
development
East of Site: Present Zoning — Central Business District
Present Use — Single family residences and Oakgreen Avenue
Attached for reference:
Exhibit 1:
Exhibit 2:
Exhibit 3:
Exhibit 4:
Exhibit 5:
Exhibit 6:
Exhibit 7:
ISSUES ANALYSIS
Site Plan
Photo Overlay
Comparison to CBD Plan
Conceptual Drainage and Utility Plan
Project Narrative
City Engineer -- Roadway Planning Review Memo
City Arborist Memo
Comprehensive Plan. The 1998 Comprehensive Plan designates this area north of
58 Street and directly west of Oakgreen as CBD. The Central Business District Urban
Design Study designated this area for residential and a mixed use precinct similar to
what has been proposed in this concept plan application. The residential area is
concentrated on the east side of the site and is oriented around the existing wetland
similar to the CBD Plan. Additionally, the CBD Plan called for small box commercial
with residential development west of the proposed Novak. While not identical to the
Central Business District Urban Design Study Master Plan, the current proposal is
similar in general land uses for how the area would develop.
Zoning. The subject site north of 58 Street is proposed to remain zoned CBD. The
PUD approvals will be applied to the CBD District as a conditional use. The CBD
District allows multiple family structures as a conditional use. The use of the PUD
would allow flexibility in how the project is configured in terms of building orientation and
use of private driveways for access.
Subdivision /Phasing. A preliminary plat will need to be processed with the general
plan of development approvals for the entire development. As part of concept plan
review, the applicants should provide a general diagram of how the property will be
subdivided to more fully understand the project and how it will be managed in the long
term. I n addition, a phasing plan is necessary if the project is to be developed over a
multi year period.
Proposed Project. The project has been developed to coordinate with the Kohl's
concept plan and to incorporate the general land use plan developed by the City as part
2
PROPOSED RESIDENTIAL UNIT BREAKDOWN
Building
Units
Apartment (13)
50
Apartment (14)
50
Apartment (Building C)
60
TOTAL
160
Townhomes (1 -12 Phase 1)
80, 12 buildings
Townhomes (15 -17 Phase II)
20, 3 buildings
PROPOSED COMMERCIAL
Building
Total Square Feet
Office Building A
10,000
Office Building B
32,000
Office Building C
18,000
TOTAL
60,000
of its Comprehensive Plan and the Central Business District Urban Design Study. The
commercial aspect of the development includes two office buildings and a mixed
residential apartment and commercial building. The residential component includes two
apartment buildings and 80 townhome units. A breakdown of the project is as follows:
The townhome project is proposed in two phases. The undeveloped property that is
oriented around the existing wetland would be constructed at this time. Phase 11 is
located in that area of the single family homes on Oakgreen. This property is not under
total control of the applicant at this time and would not be included in any of the concept
or general approvals. The plans for Phase 11 have been included to demonstrate how
this property could be included in the overall concept.
Proposed Streets /Access. The concept plan includes the extension of the proposed
Novak Avenue from the Kohl's development to 58 Street. A public roadway is also
proposed to connect Novak and 58 Street between the apartments and townhome
development. Also with this proposal, 59 is proposed along the Xcel Energy power
line easement to connect Novak and Oakgreen Avenue.
The City Engineer has reviewed the concept plan and offers the following comments
related to potential traffic operations issues (see Exhibit 6):
• The proposed access to 58 Street, just west of Oakgreen Avenue, is too close
to the intersection of Oakgreen Avenue and 58 Street. An intersection this
close can cause operational problems. A relocation to the west, at the trail on
the east side of the ponds, is recommended.
3
Proposed access from the parking lot to the road just referenced has limited sight
distance to/from the west.
• A secondary access to /from Novak Avenue is recommended for the retail space
south of 59 Street.
• The concept of the extension of the WaI -Mart driveway located on the north side
of the parking lot to Kohl's is good. The "Y" shaped intersection will create some
operations problems.
• The extension of the store front WaI -Mart drive to connect to the Kohl's area is
probably not necessary given the north side connection. Such an extension may
place too much traffic along the Wal-Mart store front which is where pedestrian
traffic is heaviest. Avoiding the auto /pedestrian conflict, to whatever degree
possible, increases the safety for pedestrians.
• The access to/from 58 Street, for the proposed development in the southwest
corner of the development, may have a sight distance problem to/from the west.
Relocation of the drive easterly will help exacerbate that problem.
The Engineer has recommended changes to the plans as follows (see Exhibit 6):
• Norwich Avenue and 59 Street should be connected as shown on the graphic.
This public street connection will allow for flexibility of movement for traffic
entering and leaving the area.
• The connection of the public street to 58 Street on the east side of the
development should be relocated adjacent to the ponds. Access to property on
the south side of 58 Street, when considered for development, should be
located opposite the relocated street.
• An alternative to the Novak /58 Street connecting roadway is a facility
connecting Novak to 59 Street. This redirects some traffic from 58 Street and
reduces access to 58 Street, which needs to be protected in terms of its ability
to carry traffic. Less access means more capacity and increased safety.
• The Novak/59 Street intersection is a perfect candidate intersection for a
roundabout. Roundabouts have more capacity and are safer than standard four -
legged intersections. The roundabout could provide a focal point for the area
development.
• It is recommended that 59 Street be extended to Oakgreen Avenue. This
connection will allow for local development area trips to enter /exit from
Oakgreen, particularly those coming from /going to the north. It would also help
to slightly reduce the volumes on 58 Street. The extension adds to the flexibility
4
for local traffic within the development and allows for another entrance to /fro the
area for emergency vehicles.
Setbacks. Within a PUD, the base district setback requirements (CBD) are applied
only to the perimeter of the project. The CBD requirements specify no front, rear, and
side yard setback requirements. The PUD section of the Zoning Ordinance specifies
that buildings should be located at least 20 feet from the back of a curb line from
roadways as part of the internal street pattern. Additionally, the ordinance specifies that
no building within the project shall be nearer to another building by one -half the sum of
the building heights of the two buildings.
The concept plans are not complete enough to show right -of -way or property lines to
fully analyze the setback issues. That information should be provided as part of a
subdivision drawing for review with the concept plan.
Pedestrian Access /Open Areas. The plans specify open area and ponding along the
Xcel Energy corridor, around the existing pond north of 58 Street and within new and
existing ponds to the west along 58th Street. A playground area is placed near the
apartment and townhome development. It is assumed that this will be privately
developed and maintained for the residents of this area. No other active park area is
proposed.
An extensive system of trails is proposed that will interconnect with what has been
proposed as part of the Kohl's development and with the Boutwells Landing
development to the south. Further review of the pedestrian system would be required
once the concept for the street network is agreed upon. The Parks Commission should
review the plans and provide comment regarding open space, park land needs and
sidewalks /trails.
Park Dedication. Park dedication is based upon the specifications of Section 402.08
of the Subdivision Ordinance. The park dedication requirements for this development
have been partially satisfied with the dedication of cash for 10.01 acres of the
commercial area north of 58 Street. This roughly represents the area occupied by the
office and commercial buildings. The residential area to be developed under this plan
and a part of the commercial area would be subject to park dedication. Once
preliminary subdivision information is provided, the City will be able to calculate the
required dedication. The Parks Commission /City Council should determine if any of the
dedication would be in the form of land, or if only a cash dedication would be required.
Building Orientation. City staff is favorable to the building orientation and
development of the ponds in the commercial area south of Kohl's. The buildings will
front on 58 Street with parking on the side and to the back (north). Development in
this area relates very well to the proposed Kohl's development and includes the
necessary pedestrian access between Boutwells to the south and the commercial
development to the north.
5
To the east, within the area proposed for apartment and townhome development, the
City will need to look further at the roadway issues. As indicated in the City Engineer's
comments found above, the roadway connection to 58 Street will need to be moved
west to avoid roximit to the 58 Street /Oakgreen Avenue intersection. 59 Street has
p v
previously been an issue and will need to be further discussed.
Further information on both the apartment buildings and the townhome developments
will be required before concept plans can be reviewed. Information needs to be
provided on numbers of units in each of the apartment buildings and the breakdown on
types of units (number of bedrooms). Information on numbers of underground parking
spaces for each of the buildings would also be necessary.
The townhome units as proposed do not identify where or how many garages spaces
are included in each of the buildings. Underground parking for these units would be
recommended. The buildings, as oriented, allow a 20 foot access way within the
driveways. This spacing is not adequate for maneuvering vehicles into the garage
spaces. No space is allowed for parking vehicles in front of the garage doors. Without
this parking, additional on -site guest parking space would be required. More detailed
information including floor plans and elevations would be necessary to understand how
the townhome units would be configured.
Grading and Drainage. A conceptual drainage plan has been submitted with this
proposal. Additional detail is required to analyze this proposal including drainage plans
and calculations as required by the City Engineer.
Utilities. A conceptual utility plan has been submitted. The utility plans are subject to
review and approval of the City Engineer.
Architectural Appearance, Building Height. No building elevations have been
submitted to date to analyze design or building height. Basic elevation plans of the
proposed buildings would be necessary to assume how the proposed structures will fit
into the areas as proposed.
Lighting, Signage, Landscaping. Detailed plans have not been submitted to date for
lighting, signage or landscaping. These plans should be submitted and considered as
part of the general plan review.
Development Contract. The applicant will be required to enter into a development
contract with the City should approval of the concept plan and general plan of
development be granted. As part of the contract, the provisions for street and utility
construction, as well as payment for area changes, would be included. The contract will
specify conditions of approval and issues related to phasing the development.
6
RECOMMENDATION 1 CONCLUSION
Based upon the preceding review, it is recommended that the Planning Commission
hold on a recommendation related to concept plan approvals for this development. The
Planning Commission should comment on the overall plan and discuss potential
roadway locations within the development. The placement of the roadway network in
this area will ultimately determine the final building placement. A list of information that
will be required to complete a concept plan review is as follows:
1. A preliminary plat.
2. A phasing plan.
3. Additional market information on the development, especially the residential
component. The applicants should identify what is for sale, what is rented, if
VSSA will continue long term maintenance and control and other general
ownership and market information.
4. Revised site plans should be provided based upon the City Engineer's /Planning
Commission recommendations.
5. The Parks Commission should make preliminary comments regarding open
space, park land needs, and sidewalks /trail locations.
6. Information related to land market value should be provided to calculate park
dedication requirements.
T Preliminary floor plans of the apartment and townhome buildings.
8. Grading and drainage information as required by the City Engineer.
9. Utility information as required by the City Engineer.
10. Preliminary building elevations.
11. Any other information required by City staff, Planning Commission, Parks
Commission, and City Council.
7
/
/
oz rLl -SE) 63waraCC.I. j
viva 7V11J+.301S3h1;
EI 25
�L
vum
N&g
xLrs n raoac+a j
�'s6S4 f J+ 006RA
srv ? J+ rr�r�rJtr
%{r9 j J. 074t6
. X.LE 3 J. OmCfSz
s5Ft9 1 J+ cbtt {6
Y.67PS
LYL�rI
%L4zz
+fikir7 t7E
lv?'tV 3r1r3I E 37732tr,
l e. 0046CL
I
nemralz
cups£
H GV!`RL ►1
-� wJyr lGfS
Li
■
CVSP•' Ott
� � v
•' [A - IJ S3Li7tlrlfr3
TV EiN301S3a
1vi1N3al53al 17101
I1'73 VO 1G1 7,.1'1 O�CEu
35Y1 O3?Cii.l
50 10 37Fi�
� 371310
513.,
]74'dS N3a10 71'iCAL�i
l +7M7Rf7d
3115 17101
VIVO Tv11430E5.
viva Ivr.24.4,,"
• 30741.15
�.N�7wl rd
r 7 +JO16J V gaiv_;
:7xavd
VIVO 391340
0
~ =W4FAC
"".".m
/ """""""'
0UUUND
au-1-41-H-H
ONUHNU
n""uu"n
(
T 711
0
CONCEPT FLAN
December 20, 2002
w
cr
0
z
G
9
.7
uj
0
JL
11
w
tko
w
A
Do me, are0 t406,38
//
111111111111111
1'
I =i
. > ,
\ I
/.,
0
8
111111111111110
111111111111-11: ./
,, ,..- i c, A?
/ /
\I 1
1, 1
L-
1 I r -"-, ,
,,,
„, )
r ,
.,
? , ,,._..._...,
i , ,/
i 1 )
)
\
€1.L SS NW 'ITII/OSCM
3r1N3AV ]Nl1WVH NIXON Stgt
MOVOTIN5
SIONINVd N15110H 11011\13S
IVYM2111EM
llfl MQTtdflNW O
DY111A NODNVO
u
11
1
L-3
SIHDEH )111Vd NVO
DNIGNY1 STUMM
wiram
g
8—
•■1
PRESBYTERIAN
HOMES & SERVICES ember 20, 2002
Senior communities
designed with the hand
of experience, a heart
for excellence and an
eye to the fi ture.
City of Oak Park Heights
14168 Oak Park Boulevard
Oak Park Heights, MN 55082
RE: Central Business District PUD: Concept Plan application
Valley
Senior Services Alliance and Anchobaypro Inc. are submitting a plan for
concep t approval, which encompasses a significant part of the Oak Park Heights
Central Business District. With the AIG Development proposal before the city,
we de termined that the interests of all parties would be well served by offering
the ci ty a comprehensive plan for the Central Business District.
com p
The Planned p
1 ed Unit Development (PUD) being submitted is intended to coordinate
and complement lement the existing Boutwells Landing development to the south and
the pro p osed Kohl's and retail development to the north — the area we call the
"master site ". The plan follows closely the City of Oak Park Heights schematic
m p
"CBD Master Plan" for location of different uses on the site. (see the attached
comparison plan)
This p
lan offers a coordinated design of the three major elements; vehicular
traffic, pedestrian traffic and site water ponding.
We have identified three major pedestrian edestrian ways connecting the commercial uses
of the
master site to the residential uses. The east/west trail way connects the
existing trail on the east side of Oak green Ave., through a green space including
ponds and landscaping, and continuing through he commercial/retail area west
po the
Street. The westerly north/south walkway connects directly to th
of Novak y g
main entry
of Boutwells Landing on the south, circles a large pond area which
divides the
office uses on the west and the mixed use building on the east, and
then continues ontinues north along a landscaped walk which bisects the new retail
development and connects to the major east/west trail way. The easterly
south walkway is a link between the trail around north) y ound the existing wetlands in
the residential neighborhood and the east/west trail way.
It is
our intent to limit the amount of vehicular traffic traveling through the more
residential areas of the overall master site. To help accomplish this we have
a new 59 Street continuing east from Novak Street and connecting to
shown
Oakgreen Ave. To the west we have shown 59 th street continuing through the
EXHIBIT 5
Management 6' Services
2845 Hamline Avenue North, Suite 200, Roseville, MN 55113 Phone (651) 631 -6100 Fax (651) 631 -6108
northern most part of the existing Wal -Mart parking lot and connecting to Norell Ave.
The mixed -use buildin g shown on the comer of 58 and Novak would have space for
commercial and retail tenants primarily serving the existing residential area of Oak Park
Heights. The office buildings would be primary destinations for traffic resulting in a
much lower volume of traffic than retail tenants.
The third item, which ties the master site developments together, is ponding and drainage.
The new ponds shown are the result of coordination of the interests of all parties in the
master site. The western pond located in the Office Center is made available by VS SA,
along with the large circular pond and emergency dry pond, to serve both the Office
Center and the AIG retail center to the north. The ponds located to the south of the new
59th Street can serve the AIG retail center and the new residential areas north of 58th
Street and east of Novak. Use of these off -site ponds will enable the AIG development to
maximize and concentrate the retail use of the master site, and provide more open space
and views for the properties closer to the residential areas.
Upon approval of this PUD Concept Plan and the required General Plan, we will begin
development on a portion of the project. It is most likely that the town homes would be
the first phase. The town homes along Oakgreen Ave. would certainly be included in
later phases since some of that property is owned by the occupants of the residential
dwellings.
Bonestroo
Rosene
Anderlik &
Associates
Engineers & Architects
MEMORANDUM
TO:
FROM:
DATE:
Dennis Pastier
Shelly Johnson
December 31, 2002
Bonestroo, Rosene, Anderlik and Associates, ► an Affirmative Action /Equal
Opportunity Employer and Employee Owned
Principals: Otto G. Bonestroo, P.E. - Marvin L. Sorvala, P.E. - Glenn R. Cook, P.E. - Robert G.
Schunicht, P.E. - Jerry A. Bourdon, P.E.
Senior Consultants: Robert W. Rosene, P.E. - Joseph C. Anderlik, P.E. - Richard E. Turner,
P.E. • Susan M. Eberlin, C.P.A.
Associate Principals: Keith A. Gordon, P.E.. Robert R. Pfefferle, P.E. - Richard W. Foster,
P.E. • David 0. Loskota, P.E. • Mark A. Hanson, P.E. • Michael T. Rautmann, P.E. - Ted K.
Field, P.E. - Kenneth P. Anderson, P.E. - Mark R. Rolfs, P.E. • David A. Bonestroo, M.B.A. -
Sidney P. Williamson, P.E., L.S. • Agnes M. Ring, M.B.A. - Allan Rick Schmidt, P.E. - Thomas
W. Peterson, P.E. • James R. Maland, P.E. - Miles B. Jensen, P.E. • L. Phillip Gravel 111, P.E.
Daniel J. Edgerton, P.E. • Ismael Martinez, P.E. - Thomas A. Syfko, P.E. - Sheldon J. Johnson -
Dale A. Grove, P.E. - Thomas A. Roushar, P.E. • Robert J. Devery, P,E.
Offices: St. Paul, St. Cloud, Rochester and Willmar, MN • Milwaukee, WI - Chicago, IL
Website: www.bonestroo.com
RE: Roadway Planning Review — Oakgreen Village
PROJECT #: 55 - 000
Pursuant to your request, a review of the Oakgreen Village roadway planning and potential
traffic operations problem areas has been conducted. The potential traffic operations issues are
shown on the attached concept plan photo overlay. A brief synopsis of the potential problems
follows:
• The proposed access to 58 Street, just west of Oakgreen Avenue, is too close to the
intersection of Oakgreen Avenue and 58 Street. An intersection this close can cause
operational problems. A relocation to the west, at the trail on the east side of the ponds,
is recommended.
e Proposed access from the parking lot to the road just referenced has limited sight distance
to/from the west (see graphic).
O A secondary access tolfrom. Novak Avenue is recommended for the retail space south of
59 Street.
O The concept of the extension of the Wal-Mart driveway located on the north side of the
parking lot to Kohl's is good. The "Y" shaped intersection will create some operations
problems.
• The extension of the storefront Wal -Mart drive to connect to the Kohl's area is probably
not necessary given the north side connection. Such an extension may place too much
traffic along the Wal -Mart storefront which is where pedestrian traffic is heaviest.
Avoiding the auto /pedestrian conflict, to whatever degree possible, increases the safety
for pedestrians.
EXHIBIT 6
2335 West Highway 36 e St. Paul, MN 55113 651-636-4600 • Fax: 651-636-1311
• The access to/from 58th Street, for the proposed development in the southwest corner of
the development, may have a sight distance problem to/from the west. Relocation of the
drive easterly will help exacerbate that problem.
The general roadway plan (public roadways) for the development concept will work, but a
couple of minor changes are recommended (see attached graphic). A discussion of the changes
follows:
• Norwich Avenue and 59 Street should be connected as shown on the graphic. This
public street connection will allow for flexibility of movement for traffic entering and
leaving the area.
• The connection of the public street to 58 Street on the east side of the development
should be relocated adjacent to the ponds. Access to property on the south side of 58
p
Street, when considered for development, should be located opposite the relocated street.
▪ An alternative to the Novak/58 Street connecting roadway is a facility connecting
Novak to 59 Street. This redirects some traffic from 58 Street and reduces access to
58 Street, which needs to be protected in terms of its ability to carry traffic. Less access
means more capacity and increased safety.
* The Novak/59 Street intersection is a perfect candidate intersection for a roundabout.
Roundabouts have more capacity and are safer than standard 4- legged intersections. The
roundabout could provide a focal point for the area development.
• It is recommended that 59 Street be extended to Oakgreen Avenue. This connection
will allow for local development area trips to enter /exit from Oakgreen, particularly those
comin g g g from) oin to the north. It would also help to slightly reduce the volumes on 58
Street. The extension adds to the flexibility for local traffic within the development and
allows for another entrance to/from the area for emergency vehicles.
2335 West Highway 36 • St. Paul, MN 55113 • 651-636-4600 • Fax 651-636-1311
Scott Richards
Scott
From: <kdwidin a@attbi.com>
To: "Scott Richards" <srichards a@7nacplanning.com>
Sent: Monday, January 06, 2003 4:15 PM
Subject: Oakgreen Village - Concept Plan
I have reviewed the concept plan for Oakgreen Village (received 12/20/02)
and have the following comments:
1. The plan for the development looks attractive and provides for both
common open space (mainly wetland areas) and public open space,
with both landscaping and some preserved natural areas of existing
trees. It looks as if there will be a fair amount of tree removal during
project development, however.
2. As the project moves forward, I would like to see a tree inventory, tree
removal list, and plans for tree protection and preservation, as well as a
landscape plan with a planting list and planting detail.
Kathy Widin
Municipal Arlo or i st
City of Oak Park Heights
EXHIBIT 7
Page 1 of 1
1/7/2003