HomeMy WebLinkAboutOT 1998-00514 Air Conditioner a iw. y, . r- . . ` nr,-. %i' -' {� !; �~ ''! L`�yn ?yGA ,,,q,t ..o-x:". �� .,r�'•D� y' r " »-+ ttrs ,. ..::
CI BUILDING
CITY PLUMBING
CITY OF OAK PARK HEIGHTS CITY MECHANICAL
PLAN REVIEW FEE
14168 57th Street North . 50
STATE SURCHARGE
P.O. Box 2007
SIGN PERMIT
Oak Park Heights, MN 55082 -2007
(612) 439 -4439 cmrurluTY(ME�Ea)
UTILITY CONNECTION FEE
UTILITY INSPECTION FEE
PERMIT NO. OT -98 -00514 Use Zone R - METRO S.A.C.
INVESTIGATION FEE
Permit Issued For AIR CONDITIONER PARKS CHARGE
OTHER 2 5.00
PERMISSION IS HEREBY GRANTED TOTAL 2 5.50
Owner JEAN JACOBY Contractor APOLLO HTG & VENT CORP (HVAC )
5585 OZARK AVE N 6510 HWY 36 BLVD N
OAK PARK HEIGHTS, MN 55082 OAKDALE MN 55128
439 -3203 770 -0603
To carry out the work specified on the following described property, upon the express condition that said persons and their agents, employees
and workmen, in such work done, shall conform in all respects to the provisions of the Building Code. This permit may be revoked at any time upon
the violation of the provisions of said code.
JOB ADDRESS I CLASS OF WORK
NUMBER STREET NEW ADO SIGN ALTER REPAIR MOVE DEMOUSH
5585 OZARK AVE N f
FRONT or AREA OF
WIDTH SIDE or LENGTH HEIGHT NO. OF LOT TYPE OF MAX OCC.
IN FT IN FEET STORIES
OCCUPIED CONST. OC: UPANCY I LOAD I VALUATION
IN FEET EE
V -N R -3
PROPERTY DESCRIPTION: LOT BLOCK
AUTHORIZED WORKISPECIAL CONDITIONS:
INSTALL PER MANUFACTURER'S SPECIFICATIONS AND MUST COMPLY WITH ALL MN STATE
BUILDING AND MECHANICAL CODE REQUIREMENTS.
ISSUE DATE: 4/03 /98 EXPIRATION DATE: 4/03/99
The aoolicant hereby agrees to do all work in accordance with the Ordinances of the Local Municipality, State Building Code and the
requirements enforced by the City of Oak Park Heights Building Department I further agree to notify the Building Official of each of
the required inspections 24 hours in advance as noted on Inspection Record Card
A CERTIFICATE OF OCCUPANCY MUST BE REQUESTED AND ISSUED PRIOR TO USE OR OCCUPANCY. 'THIS PERMIT SHALL EXPIRE AND BE NULL. AND VOID OF THE
WORK A RIZED BY THE BUILDIN PERMIT IS NOT COMMENCED WITHIN 60 DAYS OF THE DATE OF ISSUANCE OR IF WORK IS ABANDONED OR SUSPENDED FOR
A PERIO 120 DAY OF RMIT IS 12 MONTHS FROM DATE OF ISSUE
BUILDING OFFICIAL/AUTHORIZED AGENT Owner or Contractor
PENALTY FOR VIOLATION OF ANY OF THE PROVISIONS OF BUILDING CODE. FINE NOT TO EXCEED FIVE HUNDRED DOLLARS ($500.00) OR IMPRISONMENT FOR NOT
MORE THAN NINETY (90) DAYS, OR 20TH.