HomeMy WebLinkAboutOT 1996-00297 Re-Roof BUILDING
CRY PLUMBING
CITY OF OAK PARK HEIGHTS CRY MECHANICAL
PLAN REVIEW FEE
14168 57th Street North . 50
STATE SURCHARGE P.O. Box 2007 SIGN PERMIT
Oak Park Heights, MN 55082 -2007 CITY UTILITY (METER)
(612) 439 -4439 UTILITY CONNECTION FEE
UTILITY INSPECTION FEE
PERMIT NO. OT -96 -00297 Use Zone R -2 METROS.A.C.
INVESTIGATION FEE
Permit Issued For REROOF PARKS CHARGE
OTHER 25.00
PERMISSION IS HEREBY GRANTED TOTAL 25.50
Owner RANDE & ANITA GOSSO Contractor
5601 OZARK AVE N
OAK PARK HEIGHTS, MN 55082
430 -0526 00 -0000
To carry out the work specified on the following described property, upon the express condition that said persons and their agents, employees
and workmen, in such work done, shall conform in all respects to the provisions of the Building Code. This permit may be revoked at any time upon
the violation of the provisions of said code.
JOB ADDRESS CLASS OF WORK
NUMBER STREET NEW ADD SIGN ALTER REPAIR MOVE DEMOUSH
— .,_5601 OZARK AVE N X
FRONT or SIDE or LENGTH HEIGHT NO. OF AREA OF TYPE OF MAX OCC.
V IN FEET IN FE STORIES LOT CONST. OCCUPANCY LOAD
FEE VALUATION
ET
IN FEET I I OCCUPIED
V -N R -3
PROPERTY DESCRIPTION: LOT BLOCK
AUTHORIZED WORK/SPECIAL CONDITIONS:
INSTALL PER MANUFACTURER'S SPECIFICATIONS AND MUST COMPLY WITH ALL MN STATE
BUILDING CODE REQUIREMENTS. ICE SHIELD IS REQUIRED IN ALL VALLEYS AND ONE
FOOT INSIDE EXT. WALLS. PROVIDE PROPER ATTIC VENTILATION. NO MORE THAN 2
LAYERS ON A ROOF AND ALL DAMAGED ROOF BOARDS ARE TO BE REPLACED.
ISSUE DATE: 11/22/96 EXPIRATION DATE: 11/22/97
The applicant hereby agrees to do all work in accordance with the Ordinances of the Local Municipality, State Building Code and the
requirements enforced by the City of Oak Park Heights Building Department I further agree to notify the Building Official of each of
the required inspections 24 hours in advance as noted on Inspection Record Card.
A CERTIFICATE OF OCCUPANCY MUST BE REOUESTED AND ISSUED PRIOR TO USE OR OCCUPANCY. 'THIS PERMIT SHALL EXPIRE AND BE NULL AND VOID OF THE
WORK AUTHORIZED BY THE BUILDING PERMIT IS NOT COMMENCED WITHIN 60 DAYS OF THE DATE OF ISSUANCE OR IF WORK IS ABANDONED OR SUSPENDED FOR
A PERIO s DAYS. T THE P. T MONTHS FROM DATE OF ISSUE
/ ILOING OFFICUUAUTHORIZE AGENT Owner or Contractor
PENALTY FOR VIOLATION OF ANY OF THE PROVISIONS OF BUILDING CODE. FINE NOT TO EXCEED FIVE HUNDRED DOLLARS (5500.00) OR IMPRISONMENT FOR NOT
MORE THAN NINETY (90) DAYS, OR BOTH.