Loading...
HomeMy WebLinkAbout2006-07-31 BRAA Ltr to OPHki Bonestroo Rosene Anderlik& Associates En & Architects Jul 31, 2006 1 35 West Hi 36 w St. Paul, MN 55113 Office: 651-636-4600 ■ Fax: 651-636-1311 www.bonestroo.com Mr. Eric Johnson Cit Administrator Cit of Oak Park Hei 14168 Oak Park Blvd., P.O. Box 2007 Oak Park Hei MN 55082-2007 Re: Oak Villa General Plan Review BRA File No. 55-05-000 Dear Eric: 110 D �� We have reviewed both the g radin g and utilit construction plans for the Oak Villa development as submitted b Folz, Freeman, Erickson, Inc. Followin are our comments and/or recommendations. GRADING PLANS .qhchr'l Cd I 1. The east boulevard g rade at approximatel street station 6+30 is steeper than 3 :1, however this appears to be a temporar situation. NV-hcn the propert to the east is -obtained the boulevard should be re- to decrease the slope. For the interim it is recommended a permanent erosion control blanket be placed on the slope. 2. The g radin g for the proposed north pond extends into the ultimate ri on Oak Avenue. Revise the plans to remove this g radin g from the ri ,qhipp-f CA 7. I. Verif the cross section of the pathwa around the south existin Wetland is not g -neater than 2%. For example, at units 9-16 the g rade chan from elevation 948 to 9416 in approximatel 12-14 feet. This represents a 14% cross slope. 2. To prevent storm water in the existin wetland from potentiall backin up south of 5 8"' street into the River Hills development, the Emer Overflow Elevation for the existin wetland shall be placed at 944.00. This critical elevation should be clearl identified on the Drawin UTILITY PLANS ., h cl I 1. Verif potential conflicts with the water main and sanitar service pipes. It appears some risers need to be adjusted to avoid pipe conflict. St. Paul, St. Cloud, Rochester, MN N Milwaukee, W1 a Chica IL Affirmative Action Opportunit Emplo and Emplo Owned 2. Verify the walkouts can be serviced by the sanitary sewers. It appears that the top of some risers are identical to the walkout basement elevation. Sheet C3.2 I. Verify potential conflicts with the ,sanitary services and the water main between MH 10 and MH 9 and between MH 7 and MH 1.1. Sheet x:4.1 L The City of Oak Park Heights will be maintaining the pond outlets on this development. The proposed outlets for the ponds have submerged pipes that are difficult to access and maintain. Therefore, the submerged pipe should be removed from each pond outlet. General Comments 1. The following items shall be sti- bmitted for review: a. Revised HydroCAD model. b. Water Quality Calculations c. Copy of the Approval letter from the Middle St. Croix Water Management Organization. If yoti leave airy quiestions or regtni add- iti-oiial information, please contact me at (651) 604 -4788 or Dennis Postler at (651) 604 -4815. Sincerely, ' ONESTROO, ROSENE, ANDEREIK & ASSOCIATES, INC. Karen S. Erickson, P.E. cc: Torn. Ozzello, Public Works Director Jim Butler, Building Official Scott Richards, City Planner Mark Vierling, City Attorney Todd Erickson -Folz, Freeman Erickson, Inc. DMP, BMK, File -- Bonestroo & Associates 1 C:1 551 55privatel oakgi cenvillagefebO6 ljolinson KSEJ\Oakgi Village general plans 7 -24 -06