HomeMy WebLinkAbout2007-05-18 MSCWMO Inspection ReportMiddle St. Croix River Water
Mana Or
(MSCWMO)
1380 W Fronta Rd, HWY 36
Stillwater, MN 55082
Phone: 651-275-1136 ext. 22
Anchoba Pro, LLC
775 Green Twi Wa
Stillwater, MN 55082
Project: Oak Villa
Dear Anchoba Pro, LLC:
7
Ma 18, 2007
i r
WCD Project ID # 06045OPH
MAY 2 1 200T
The Washin Conservation District (WCD), on behalf of the MSCWMO, conducted an inspection for
erosion and sediment control issues at the site located at Nova Scotia Avenue N, Stillwater, Minnesota on
5/17/2007. This report summarizes the field inspection findin and describes areas of compliance/non-
compliance with the MSCWMO Policies and Performance Standards, usin the procedures and protocols
defined in the Minnesota Pollution Control A (MPCA) National Pollutant Dischar Elimination
S (NPDES) General Stormwater Permit for Construction Activit
INSPECTION REPORT
B-- GOOD This g rade describes the overall condition of the site.
Status
Compliant
1rosion Control Re
All positive slopes within 200' of a water of the state or conve to a water of the state must
have temporar protection or permanent cover within 7, 14, or 21 da dependin on the slope (or
sooner if a special water).
..............................................................
Comments: Some sparse areas
........... --. ....... ............. ........ .......................
Compliant
. ...................... --- .... I ..... ................................ .......... ............... ................ ..................... ................... .............. __ ..................... ........ ......... .......... ..... .......................... ................
The normal wetted perimeter of temporar or permanent ditch that drains water must be stabilized
within 24 hrs of connection (200' back from the surface water).
Comments:
..... ...........
Compliant
.................... ... . ...... ................................. ................................... ........ - ... I-- .......... ........................ . ............... - ... . ............... * .................................... . ..................... ................ * .............^.................. - .... * .............................................
Temporar or permanent ener dissipation must be installed at outlets connected to surface water
(re within 24 hours of connection to a surface water)?
Comments:
Status
Sediment Control Re
Compliant
Sediment dischar must be ade controlled and minimized.
Comments: - Silt fence 'Installed
...................
Not Applicable
...............I.- ......- - -....
Temporar sedimentation basins re for disturbance over 10 acres, or less than 5 acre ..... .... i , f ... near ..... ... ............
.... . .... .... ............................ .... ........... .................... ....... . ......................... . ....... .... -- ......, .. ......... . ................................... . . .... ...... ....... ........... ........ '-'"'
NPDES. identified special water ar
Comments: -
........... ....... ........ ......
Not Applicable
.......................... I .............. - ... I ...... I ....... ... . ... ...... ................................ ....... .................... ............... .. ..... ........ ................. ............................. ...... .......... ........ ....................... .......................... ............... ........ ...... - ......... -
Inlet control devices must be installed and maintained at all inlets.
Comments:
. . . ............................... .. I-- ......... -- ......... ..,......................I.
Compliant
-... .............. ...... ..... ................... .. .............. . ......... ..... . ....... .... .............. .... ........ . . .................. ..... ....... -1-1 .................. ............................. ...... ....... - ........... - ........ ...... -- ................. .... ...... .................. ..............
Down g radient perimeter controls must be installed and maintained.
Comments:
.......... ...... ................. - ...... I .................................................
Not Applicable
. . -.-I.- ........... ........ ... . ...... . ............... . ............... - . ......................... . ..... -... . .. ............ . . . .......... __ ....... - ...... -- ......................... ............ ........ . ..... ........... .............. .......................................... _ .............. .......... . ............ ......
Slope breaks must be installed on 3:1 slopes or g reater with unbroken slope len exceedin 75
feet.
Comments:
.... ....................................... ..........
Compliant
. . ................... ........... ...... I .......... ................................. ...... . I ......... ................ ............... -.1 ................ .......... . ... . .. -.11-1.11 .... . ......... .................. I ......
Temporar soil stockpiles must have effective sediment controls and not be placed in a surface
water or storm water conve
Comments:
i Status
Compliant
Nlaintenance Re
Erosion and sediment control BMP must be ade maintained
.......... .......... ..............................................
Comments:
.................. ............... .......... ........ ...... -- ....... - ...... - ........ .................. I ....... 11 .............. ....... ............... ...... . ........... ............. ............ .............. .......
Pa 1 of 2
IDDLE ST.CROIX WATERSHED MANA GEMEM&GANIZATION
Not Applicable Temporar sedimentation basin maintenance performed ( re q uired when collected sediment reaches
1/2 basin volume
Comments:
..................... _.- ............. -.1 ............ ....... __ .......... ........... ...... . .......... ....... __ . ........... I...-�.�,-....--....-...------..-----,-.-.-�--.-,-.--� ------------- ...... ................ ............... ------- .... . ......... ............... ........
Compliant Sediment deposits in ditches or surface waters must be removed within 24-hours
Comments: -
............... _...__ ........ - '..I.- .......... ...... ........... ................ _ .......... ............ ......... 11 ------- ......... I ......... ...... __1..1___ ........ .......... .........
Compliant Minimization and cleanup of sediment trackin on paved surfaces
Comments: - Re-establish construction entrances
..... ............... ...... ............. ... . .... ....... ........ ......................... ......... _ .. ........ ............... . ......... ............................ ........................
... .... .... ..... ....
Compliant Pollution prevention mana measures for solid waste, hazardous materials .... an . _. truc . . .... w . a s . h . i .- n g .......
are in place.
Comments:
;Status Inspection I
_"u*rements
Not Inspected Stormwater Pollution Prevention Plan on site
Comments:
...................... I ...... ........ ............ ......... ___ .......... ............. I ...... ............. ............ __._..._._._ ....... ... . ........... .......... ........ . .......... ........ ____ ............................. _. ............... ........
Not Inspected Inspections/maintenance forms completed (inspections re I per 7 da or within 24 hours of a
.0.5 inch precipitation event)?
Comments:
,Status Stormwater Mana Re
Pretreatment prior to dischar to surface water (> 1 -acre impervious
Comments:
. Status Surface water or off-site impacts
COMPLIANT Untreated dewaterin causin turbid dischar to surface waters or erosion off site
Comment
..... . .................... .....................
...... ** ............. * .... .............. ' ................................................ ...................................... - -- - --------------------------- . ............ ..................... ....... ............................ . ...... . ... ............... . ...... . .................................................... ------ - - ------------
Compliant Wetland or other water resource impacts
................ - ............ 1.1'.... ... - ......... ...................... 1 .... ............ _.- ................... ... . ...... ... - ......... _ ................. .............. _ .... __ ........... .......................... ..... .. ........... ......... 11.1 ...... I ........ 11 ....... _1 .......... .................... __ .............. .................................. ....... . ........ . . . ............. ....
Compliant Offs to sediment dischar documented
Comments: Wetlands protected with silt fence
MAINTENANCE AND COMPLIANCE STATUS SUMMARY
OVERALL SITE (J'rRADE: B - Good
A status described above as non-compliant indicates a violation
that must be addressed in accordance with MSCWMO policies
and performance standards. Follow-up inspections will be
conducted on a re basis. Please contact Pete Youn at 651 -
275-1136, extension 21 if y ou have an q uestions.
Respectfull
Pete Youn En Specialist
Washin Conservation District
peter.
cc: Melissa Lewis, MSCWMO Administrator
Cit of Oak Park Hei
I
<<Date)>
GRADE DESCRIPTIONS
A The site is in full-compliance, all practices are in
place, and the site is well maintained.
B The site is in compliance, but normal maintenance
activities are re
C The site is not in comi)liance. Maintenance or
supplemental practices are re
D The site is not in compliance. Erosion and
sediment control practices are in poor condition and
controllable water resource or off-site Impacts are
likel Contact the District for a follow-up inspection
as soon as correction measures have been taken.
F The site is in severe non-compliance. Controllable
water q ualit y or off-site impacts have occurred.
Enforcement proceedin will be initiated unless
immediate corrective actions are taken. Contact the
District immediatel to schedule a follow-up
inspection.
WCD Construction Stormwater Pro
WCD (651) 275-1136
Inspector: (<Storrnwaterinspectm»
Pa 2 of 2