Loading...
HomeMy WebLinkAbout2012-10-22 Browns Creek Watershed District Permit 12-16 ROVTN' s �W' 13SO FRONTAGE RD • 6 i "'� a H R F F I S S O 8 2 =7 ? WAT E RS H E D 651.275.1136 x26 IPHONE] D I STRICT 651.275.1254 WWWSBCWD.ORG BROWN'S CREEK WATERSHED DISTRICT PERMIT NO. 12 -16 Stadium View Properties Property Owner: Stadium View Properties Date: October 22, 2012 Address: 1912 Greeley Street South Telephone: 651- 342 -1298 City /Zip: Stillwater, MN 55082 Email: don.harvieux@thomas-grace.com Project Location: 5605 Memorial Ave N, Oak Park Heights, MN 55082 (T29 R20 Sec6) Affected Rules: Erosion Control (3.0) Work Authorized: Permission is granted to do the work described in the documents referenced in Table 1 and consistent with those documents as amended by the terms of this permit. In the event of inconsistencies, the terms of this permit shall prevail, followed by the more recent document. Any ambiguity shall be resolved in the manner that best furthers the water resource goals and purposes of Minnesota Statutes Chapters 10313 and 103D • Materials Submitted: Table 1 Materials/Documents Date Revised Application Form October 22, 2012 — Grading and Erosion Control Plan C301 September 28, 2012 — Managers: Craig Leiser, President • Rick Vanzwol, Vice- President • Connie Taillon, Treasurer • Gerald Johnson, Secretary • Gail Pundsack, Vice - President General Conditions: 1. This permit is a determination that the proposed activity, if conducted in accordance with the conditions herein, shall comply with the rules and requirements of the BCWD. It does riot constitute a finding that the activity complies with the requirements of any other local, state or federal agency, nor does it convey any property or other right to the applicant in the permitted activity or the land on which it is to occur. The applicant is responsible for complying with the requirements of all agencies other than the BCWD, and for ensuring that it holds all property and other rights as are necessary to carry out the permitted activity. 2. This permit shall expire one year from the date of issuance unless renewed in accordance with Section 1.0 of the BCWD Rules. No work subject to the terms of the permit may be conducted after permit expiration. The permit may be transferred only in accordance with Section 1.0. 3. The Owner shall grant access to the site at all reasonable times before, during and after construction to authorized representatives of the BCWD for inspection of the activities authorized hereunder and compliance with the requirements of this permit, the BCWD Rules and the statutes relevant thereto. This right of access shall be in addition to the access authority of the BCWD under existing law. 4. By issuing this permit, the BCWD does not direct the activity authorized herein or warrant the soundness of the applicant's design or methods in any respect. The BCWD waives no immunity or protection applicable to itself; an officer, an agent or an employee pursuant to this approval. 5. The address of the applicant as indicated on the permit application shall be the address for any mailing or notice by the BCWD in administering this permit. 6. Before commencing any activity covered by this permit, the permittee shall sign the permit, indicating familiarity with its terms; transmit the signed copy to the BCWD by delivery, mail or fax; and confirm BCWD receipt thereof and payment of all fees and sureties due in accordance with section 8. Special Conditions: 1.) Follow Erosion Control Notes on Grading Plan C301 for silt fence, rock construction entrance, and street sweeping. 2.) Permittee will notify the District in writing at least three business days before commencing land disturbance. Approved by Date: 10 l District Administrator I hereby state .that I ant the owner of the property on which the work authorized by this permit is to occur, or am the authorized agent of said owner, and that I have read and understand the terms of the permit an e perms •'s responsib +'e hereunder. 1/0 Date: g0 z_-- [St ture] i ••1---iariLki El [Print name, title and organization] Managers: Craig Leiser, President • Rick Vanzwol, Vice- President • Connie Taillon, Treasurer • Gerald Johnson, Secretary • Gail Pundsack, Vice - President